• Title/Summary/Keyword: Central Building

Search Result 691, Processing Time 0.027 seconds

Airborne LiDAR Simulation Data Generation of Complex Polyhedral Buildings and Automatic Modeling (다양한 건물의 항공 라이다 시뮬레이션 데이터 생성과 자동 모델링)

  • Kim, Jung-Hyun;Jeon, Young-Jae;Lee, Dong-Cheon
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2010.04a
    • /
    • pp.235-238
    • /
    • 2010
  • Since the mid 1990s airborne LiDAR data have been widely used, automation of building modeling is getting a central issue. LiDAR data processing for building modeling is involved with extracting surface patch elements by segmentation and surface fitting with optimal mathematical functions. In this study, simulation LiDAR data were generated with complex polyhedral roofs of buildings and an automatic modeling approach was proposed.

  • PDF

A Study on the Characteristics of Campidoglio Hill Plan by Michelangelo (미켈란젤로의 캄피돌리오 언덕계획의 특성에 관한 연구)

  • Kim, Seok-Man
    • Journal of architectural history
    • /
    • v.18 no.6
    • /
    • pp.85-101
    • /
    • 2009
  • The Purpose of this paper is a study on the characteristics of Campidoglio hill plan by Michelangelo. 1. The plan of the Campidoglio hill is composed of the harmonized and united space, in spite of the existing conditions of a steep flight of land, a irregular site shape, a building of each other different dimension and form. And it is newly changed by site left through the modification of existing building elevation, utilization of existing building for new planning, connection with existing building and newly planned building from plaza composition of trapezoid form. 2. The concept of planning of the Campidoglio hill is planned by compromising for requirements of Baroque after Renaissance which urban planning characteristics of Baroque is as the relation with urban street through a inclined stairs and process such as street-approach stairs-plaza-symbol of inside plaza-building. 3. The section plan of the Campidoglio hill is planned by which can be easily approached to the plaza through the inclined stairs of gentle angle from street at the center east-west direction of main axis such as main axis, utilizing the existing site shape, and it is composed of the convex shape ascending gently at the center central part of the plaza. 4. The plan of the Campidoglio hill is composed of the elation with the axis of existing Senatorio palace, building planning of perfect balance, plaza composition of reversed trapezoid form bybuilding planning, central concentrated planning of buildings surrounding plaza. 5. The three palace of the plan of the Campidoglio hill is composed of the concept as theater which the stage background forms the front elevation of Senatorio palace higher two palace and the wings of either side of stage form the front elevation of Conservatori palace and Nuovo palace, surrounding three palace elevation around plaza of trapezoid form.

  • PDF

A Study of the evaluation of Building Energy Rating depending on region according to the Insulation Performance of the Super window (슈퍼윈도우 열성능에 따른 지역별 건물에너지 효율등급에 관한 연구)

  • Jang, Cheol-Yong;Ahn, Byung-Lip;Kim, Chi-Hoon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.211-215
    • /
    • 2009
  • As entering in the time of high oil price, seriousness of an energy is on the rise and the importance of energy is growing. Especially, building energy occupying 24% of total demand of energy is expected to be possible to reduce energy demand more than other section. To reduce the building energy consumption, this study analyzes function and thermal performance of Super window by heat experimental apparatus. Super window is a 2-track low-e glazing window for high insulation efficiency. By applying the results of this experiment to building energy efficiency rating tool, this study compares energy efficiency rates depending on a region.-Jeju, South, Central. And it shows how much does Super window reduce Building energy consumption.

  • PDF

A study on the analysis of energy performance for zero-energy building of rural village hall - Focused on the Jung Juk 4-le village hall - (농촌 마을회관 제로에너지 건축물 구축을 위한 에너지 성능 분석 연구 - 충남 태안군 정죽4리 마을회관을 중심으로 -)

  • Park, Mi-Lan;Choi, Jeong-Man;Lee, Jeong-Hun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.20 no.4
    • /
    • pp.1-8
    • /
    • 2018
  • In this study, we survey the 2 buildings at the Central 1 and 8 buildings at the Central 2, which are divided by each climate region in the rural regions. Major heat loss factors are 47% loss of the outer shell including outer wall, roof, and bottom, 30% loss through window, and 23% loss through crevice wind. We analyze the energy simulation of ECO2 program to construct a zero energy building regarding village hall located in Jung Juk 4-le at Centeral 2. We simulate the primary energy requirement regarding village hall and the simulated results show the $265.3kWh/m^2{\cdot}a$ and it may estimate '2' energy efficiency grade. The energy requirement regarding village hall is the $183.2kWh/m^2{\cdot}a$ when the passive technology are applied in village hall. We research total amount of energy requirement in village hall when the passive and active technologies such as solar cell with 3kW and solar thermal with $20m^2$, geothermal power with 17.5kW. The simulated results show the improved energy efficiency certification grade with $1^{{+}{+}{+}}$ due to the reduced primary energy requirement with 73% when passive technology including 3kW of solar panel is applied and the energy independence rate is 54%, which is estimated to be 4th grade of zero energy buildings. The order of energy consumption are solar panel, solar thermal, and geothermal power under applied passive technology in the building. In order to expand the zero energy building, it is necessary to introduce the zero energy evaluation system in the rural region.

Research on the relationship of store unit configuration and business activation of street mall - Based on case studies of street malls in Korea - (스트릿 몰(Street Mall)의 매장 배분계획과 영업활성화의 관계에 대한 연구 - 국내 스트릿 몰의 사례를 중심으로 -)

  • Woo, Seung-Hyun;Yoon, Hea-Kyung
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.6
    • /
    • pp.202-210
    • /
    • 2009
  • This research was undertaken to prove the relationship between street mall activation and architectural plan design. The research methodology was established based on the analysis of data of two existing street malls in Korea (Western Dome & LaFesta) and theoretical studies of outdoor space design. The findings from this study are the following: First, building blocks with segments in every 50m or so are ideal for detailed communication between visitors and building contents. Second, the ratio of width of main corridor and building height should be less than 1 to provide intimate feel and keep visitors' attention concentrated in the facility. Third, store unit should have more storefronts to be exposed more to passers-by and lead more pedestrian traffic. Fourth, shape of store unit would rather be wide and shallow, instead of narrow and deep, to have more exposure to the central corridor. Fifth, the building block of the busiest(most expensive) area that is usually at the main entrance area of street mall should be flexible to fit more smaller units to maximize the profitability. Sixth, the main entrance of store should face the main pedestrian corridor to induce the influx of visitors. Lastly seventh, anchor tenant that has strong name recognition is usually located on basement or higher level to induce pedestrian traffic into the mall, key tenants that are strong and familiar brand names should be located at the corner of building block with spacing to attract visitors, provide even distribution of traffic, and support wayfinding, and local tenant should be located at small units along the central corridor or remainder spaces occurred from building core layout.

Calibration and Verification of Detailed Prototypical Apartment Building Energy Models for Estimation of Green Remodeling Feasibility (그린리모델링 효과평가를 위한 표준공동주택 정밀에너지해석모델 보정과 검증)

  • Donghyun Seo
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.9-17
    • /
    • 2024
  • The prototypical building energy model is very useful in building energy policies, research, and technology development. A prototypical apartment model for detailed energy analysis was proposed by Seo et al. in 2014, but sufficient verification was not possible due to the lack of reliable measurement data in predicting the model's energy consumption. However, verification is now possible thanks to a recent study that analyzed the Household Energy Panel Survey (HEPS) data that is released annually by the Korea Energy Economics Institute (KEEI) and published apartment complex benchmark data. The data was used to calibrate the prototypical apartment energy model located in the central region and constructed between 1990 and 1999. The calibrated model was used to verify the other apartment building groups with respect to region and year of completion. Meteorological data for five representative cities each in the central and southern regions were used for the simulation. A majority of the 18 groups produced results that satisfied the MBE and cv(RMSE) criteria.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

A Study on the roof curved ratio and slope of Korean Traditional Wooden Building - Focused on the Central Hall of Buddhist Temple - (전통목조건축물 지붕곡과 기울기에 관한 연구 - 사찰의 주불전을 중심으로 -)

  • Go, Jung-Ju;Lee, Jeong-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.6
    • /
    • pp.3894-3906
    • /
    • 2014
  • The aim of this study was to classify the central Buddhist temple among the state-designated cultural assets, which were measured precisely, into the gable roof buildings and the gambrel roof buildings to analyze the Ang-Goak, Inside waist, ridge ratio, and roof inclination represented on the roof, and prepare basic objective material for the restoration and repair of cultural assets. As a result, as for the relationship between the roof curve and the inclination of the gable roof building and gambrel roof building, the following conclusions could be drawn. First, the Ang-Goak and Inside waist of the gable roof building had a close correlation with the building size, and the internal high pillar existence. In addition, the Ang-Goak and Inside waist were shown in the 7-ryangga structure, which is greater in size than in the 5-ryangga structure. This was found to be related to the building size. Second, the Ang-Goak and Inside waist of the gable roof building has a correlation with each other, and it was found that Inside waist also was large in the building with a larger Ang-Goak. The roof inclination rarely had a connection with variable factors (plane factor, elevation factor, and cross section factor). The sizes of Ang-Goak, Inside waist, and ridge ratio were similar in the outside 1 chulmok and outside 2 chulmok of gongpo but those sizes were relatively larger in outside 3 chulmok. Third, the Ang-Goak and Inside waist of the gambrel roof building moved independently for each building without a correlation with each other, unlike the case of the gable roof building. The front and the side showed a correlation with each other, and in the building with the large curve of the front side, the curve was also large in the sides. Fourth, in the case of the building with a high pillar inside the gambrel roof building, the Ang-Goak and Inside waist were larger. On the other hand, they were smaller in the case of a building without a high pillar. This was found to have a close relationship with the building size. In addition, the ridge ratio has a close connection with the building size and building height. Therefore, the ridge ratio is larger in a high building or large sized building. The roof inclination rarely has a correlation with variable factors, as in the case of the gable roof building.

Application study of heat storage type GSHP system in Apartment building with central cooling and heating facilities using life cycle cost analysis (LCC 분석을 이용한 중앙공급식 공동주택의 수축열식 지열원 히트펌프시스템의 적용연구)

  • Lee, Sang-Hoon;Park, Jong-Woo;Cho, Sung-Hwan
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1497-1502
    • /
    • 2009
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.

  • PDF

A Study on the Types and Changes of Relationship between Local Altar Architectures and Sinsil in Joseon Dynasty (조선시대 지방 단유(壇壝)건축 신실(神室)의 유형과 변화)

  • Sin, Hey-Won
    • Journal of architectural history
    • /
    • v.26 no.6
    • /
    • pp.7-18
    • /
    • 2017
  • Altar architecture is a kind of sacrificial building, mainly formed in altar. Central architecture of Altar architecture is relatively simple. However, various attached building are necessary for worship. Among them, Sinsil which is a place to seal a God's tablet, is very important. The central government of the Joseon Dynasty attempted to define the local sacrificial system and make it customary as a way to strengthen the centralization based on Confucianism. Nonetheless, the altar architecture of the province without detailed regulations, were managed and underwent repairs according to the political situation of the state and local circumstances. Sinsil, which is an important component of the altar architecture, best reflects this situation. Therefore, it was possible to grasp the situation of the altar architecture of the province in the Joseon Dynasty by analyzing the Sinsil through various documents. As a result of analysis, it was divided into six types. In addition, It is also found that there are temporal relation between these six types.