An Analysis on the Productivity Depreciating Factor of Cast-In-Place Piles Work (현장(現場)타설 콘크리트 말뚝공사의 생산성(生產性) 저하요인 분석(分析))

  • Lee, Myung-Do;Lee, Hyun-Seok;Seo, Jang-Woo;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.133-139
    • /
    • 2008
  • Productivity is an important factor of the construction's success and growth. However, compared to the other industries, the study of productivity in the construction industry is still insufficient. Even though the Cast-in-Place piles work is also important in construction process, the research on the productivity is not enough. So, it is necessary for the systematic research on the productivity of Cast-In-Place Piles Work. Therefore, the purpose of the study is to classify lower productivity's cause and find a way to improve these situations. This study will give the checklist for the further study of factoring and improvement of the Cast-in-Place piles work productivity.

  • PDF

Field test of the long-term settlement for the post-grouted pile in the deep-thick soft soil

  • Zou, Jin-Feng;Yang, Tao;Deng, Dong-ping
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.115-126
    • /
    • 2019
  • The long-term settlement characteristics for the cast-in-place bored pile in the deep-thick soft soil are investigated by post-grouting field tests. Six cast-in-place bored engineering piles and three cast-in-place bored test piles are installed to study the long-term settlement characteristics. Three post-grouting methods (i.e., post-tip-grouting, post-side-grouting, and tip and side post-grouting) are designed and carried out by field tests. Results of the local test show that decreased settlements for the post-side-grouted pile, the post-tip-grouted pile and the tip and side post-grouted pile are 22.2%~25.8%, 30.10%~35.98% and 32.40%~35.50%, respectively, compared with non-grouted piles. The side friction resistance for non-grouted piles, post-side-grouted pile, post-tip-grouted pile and the tip and side post-grouted pile undertakes 89.6~91.3%, 94.6%, 92.4%~93.0%, 95.7% of the total loading, respectively. At last, the parameters back analysis method and numerical calculation are adopted to predict the long-term settlement characteristics of the cast-in-place bored pile in the deep-thick soft soil. Determined Bulk modulus (K) and a creep parameter (Ks) are used for the back analysis of the long-term settlement of the post-grouted pile. The settlement difference between the back analysis and the measurement data is about 1.11%-7.41%. Long-term settlement of the post-grouted piles are predicted by the back analysis method, and the predicted results show that the settlement of the post-grouted pile are less than 6 mm and will be stable in 30 days.

Behavior of Lateral Loaded Piles with Pile shape and Length (말뚝형태 및 길이변화를 고려한 수평재하말뚝의 거동특성)

  • Hwang, Sung-Wook;Kim, Min-Kee;Kyung, Du-Hyun;Lee, Jun-Hwan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1125-1131
    • /
    • 2008
  • In this study, Calibration Chamber Tests for cast-in-place piles in sand were performed for measuring behavior properties of piles. These tests were examined effects of various parameters of soil conditions including the relative density($D_R$), the coefficient of earth pressure, and investigated differences between cylindrical pile and taper-shaped pile with the same volumes. The important effect factors of foundation behavior were investigated by considering embedded depth of piles and shapes of piles, and inspected details of lateral behavior of piles. These results were verified reliabilities of each methods for comparing the results estimated with tests and the results by proposed estimating solutions in the past.

  • PDF

Performance Prediction of Geothermal Heat Pump(GHP) System Using Cast-in-Place Energy Piles (현장 타설 에너지파일을 적용한 지열 히트펌프 시스템의 성능 예측)

  • Sohn, Byonghu;Jung, Kyung-Sik;Choi, Hangseok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.1
    • /
    • pp.28-36
    • /
    • 2013
  • The aim of this study is to evaluate the performance of the GHP system with 45 cast-in-place energy piles(CEP) for a commercial building. In order to demonstrate the feasibility of a sustainable performance of the system, transient simulations were conducted over 1-year and 20-year periods, respectively. The 1-year simulation results showed that the maximum and minimum temperatures of brine returning from the CEPs were $23.91^{\circ}C$ and $6.66^{\circ}C$, which were in a range of design target temperatures. In addition, after 20 years' operation, these returning temperatures decreased to $21.24^{\circ}C$ and $3.68^{\circ}C$, and finally reached to stable state. Annual average extraction heat of cast-in-place energy piles was 94.3 MWh and injection heat was 65.7 MWh from the 20 years of simulation results. Finally, it is expected this GHP system can operate with average heating SPF of more than 3.45 for long-term.

Evaluation of Heat Exchange Efficiency and Applicability for Parallel U-type Cast-in-place Energy Pile (병렬 U형 현장타설 에너지파일의 열교환 효율 및 적용성 평가)

  • Park, Sangwoo;Kim, Byeongyeon;Sung, Chihun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.361-375
    • /
    • 2015
  • An energy pile is one of the novel ground heat exchangers (GHEX's) that is a economical alternative to the conventional closed-loop vertical GHEX. The combined system of both a structural foundation and a GHEX contains a heat exchange pipe inside the pile foundation and allows a working fluid circulating through the pipe, inducing heat exchange with the ground formation. In this paper, a group of energy piles equipped with parallel U-type (5, 8 and 10 pairs) heat exchange pipes was constructed in a test-bed by fabricating in large-diameter cast-in-place concrete piles. In addition, a closed-loop vertical GHEX with 30m depth was constructed nearby to conduct in-situ thermal response tests (TRTs) and to compare with the thermal performance of the cast-in-place energy piles. A series of thermal performance tests was carried out with application of an artificial cooling and heating load to evaluate the heat exchange rate of energy piles. The applicability of cast-in-place energy piles was evaluated by comparing the relative heat exchange efficiency and heat exchange rate with preceding studies. Finally, it is concluded that the cast-in-place energy piles constructed in the test-bed demonstrate effective and stable thermal performance compared with the other types of GHEX.

A simple approach for quality evaluation of non-slender, cast-in-place piles

  • Zhang, Ray Ruichong
    • Smart Structures and Systems
    • /
    • v.4 no.1
    • /
    • pp.1-17
    • /
    • 2008
  • This study proposes a conceptual framework of in-situ vibration tests and analyses for quality appraisal of non-slender, cast-in-place piles with irregular cross-section configuration. It evaluates a frequency index from vibration recordings to a series of impulse loadings that is related to total soil-resistance forces around a pile, so as to assess if the pile achieves the design requirement in terms of bearing capacity. In particular, in-situ pile-vibration tests in sequential are carried out, in which dropping a weight from different heights generates series impulse loadings with low-to-high amplitudes. The high-amplitude impulse is designed in way that the load will generate equivalent static load that is equal to or larger than the designed bearing capacity of the pile. This study then uses empirical mode decomposition and Hilbert spectral analysis for processing the nonstationary, short-period recordings, so as to single out with accuracy the frequency index. Comparison of the frequency indices identified from the recordings to the series loadings with the design-based one would tell if the total soil resistance force remains linear or nonlinear and subsequently for the quality appraisal of the pile. As an example, this study investigates six data sets collected from the in-situ tests of two piles in Taipu water pump project, Jiangshu Province of China. It concludes that the two piles have the actual axial load capacity higher than the designed bearing capacity. The true bearing capacity of the piles under investigation can be estimated with accuracy if the amplitude of impact loadings is further increased and the analyses are calibrated with the static testing results.

Resistance Factors for Drilled Shafts Embedded in Weathered Rock (풍화암에 근입된 현장타설말뚝의 저항계수 산정)

  • Yoon, Hong-Jun;Jung, Sung-Jun;Kim, Myoung-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.107-116
    • /
    • 2007
  • Load and Resistance Factor Design (LRFD) method is being used increasingly in geotechnical design practice worldwide, and is expected to completely replace the current Allowable Stress Design (ASD) method in the near future. LRFD has advantages over ASD in that it allows the design of superstructures and substructures at a consistent reliable level by quantification of failure probability based on reliability analysis. At present, resistance factors for cast-in-place piles embedded in rocks are determined by AASHTO only for the intact rock conditions. In Korea, however, most of the bedrocks in which piles are embedded are heavily weathered. Thus, this study will try to determine the resistance factors of heavily weathered rocks (so-called intermediate goo-materials). To this aim, reliability analysis was carried out to evaluate the resistance factors of cast-in-place piles embedded in intermediate geo-materials in Korea. Pile load test data of 21 cast-in-place piles of 4 construction sites were used for the analysis. Depending on the method which calculates the pile capacities, the resulting resistance factors ranged between 0.1 and 0.6.

Shaft resistance of bored cast-in-place concrete piles in oil sand - Case study

  • Barr, L.;Wong, R.C.K.
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.119-142
    • /
    • 2013
  • Pile load tests using Osterberg cells (O-cell) were conducted on cast-in-place concrete piles founded in oil sand fill and in situ oil sand at an industrial plant site in Fort McMurray, Alberta, Canada. Interpreted pile test results show that very high pile shaft resistance (with the Bjerrum-Burland or Beta coefficient of 2.5-4.5) against oil sand could be mobilized at small relative displacements of 2-3% of shaft diameter. Finite element simulations based on linear elastic and elasto-plastic models for oil sand materials were used to analyze the pile load test measurements. Two constitutive models yield comparable top-down load versus pile head displacement curves, but very different behaviour in mobilization of pile shaft and end bearing resistances. The elasto-plastic model produces more consistent matching in both pile shaft and end bearing resistances whereas the linear elastic under- and over-predicts the shaft and end bearing resistances, respectively. The mobilization of high shaft resistance in oil sand under pile load is attributed to the very dense and interlocked structure of oil sand which results in high matrix stiffness, high friction angle, and high shear dilation.

The Effect of Construction Methods on Geothermal Exchange Rates of Cast-in-place Energy Piles (현장타설말뚝형 에너지 파일의 시공형태별 지중 열교환량에 관한 연구)

  • Park, Yong-Boo;Nam, Yu-Jin;Sim, Young-Jong;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.169-175
    • /
    • 2012
  • In recent, there are many studies associated with energy piles to save initial construction cost for ground source heat pump system. In this study, to evaluate geothermal exchange rates two types (a connection type and a slinky type) of cast-in-place energy piles (PRD, 4.5m in depth, 1,200 mm in diameter) were constructed for the tests and their efficiencies were compared with numerical analysis results. As a result, starting with operation, geothermal exchange rate gradually decreases due to exchange of lower ground temperature. In the case of connection type, temperature difference is $0.37^{\circ}C$ in heating mode and $0.34^{\circ}C$, in cooling mode, respectively. In addition, in case of a connection type, geothermal exchange rate in heating mode is 2,314W/m and in cooling mode, 252.2W/m whose value is 9% higher than in heating mode. In the case of slinky type, the average geothermal exchange rate in heating mode is 168.0W/m, which is about 27% lower than that of connection type.

A Comparison of Roughness Measurement and Load Transfer Test for the Calculation of Unit Skin Friction of Pile Foundation in Soft Rocks (기초 연암부 벽면거칠기 시험과 하중전이 시험 결과의 비교 및 단위주면마찰력의 산정에 대한 연구)

  • Hong, Seok-Woo;Hwang, Geun-Bae
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.6
    • /
    • pp.21-30
    • /
    • 2023
  • One of the methods for calculating unit skin friction of soft-rock-socket parts for cast-in-place piles involves the roughness measurement of the parts. The measurements are conducted during the excavation stage. A roughness measuring device is installed in the excavation hole and the unit skin friction is calculated from the measured surface roughness of the rock socket. Herein, the results of roughness measurement of rock-socket parts in cast-in-place piles and that of load transfer tests are analyzed and compared. The unit skin friction from the roughness measurements can be converted into unit skin friction corresponding to the displacement of a pile generated in a load transfer test. A reduction factor is given as Rf = -0.14n + 1.48.