• Title/Summary/Keyword: Capacity increase method

Search Result 1,111, Processing Time 0.029 seconds

CFS Strengthening Effect of Reinforced Concrete Beams under Loading States (재하상태에 따른 철근콘크리트 보의 탄소섬유쉬트 보강효과)

  • 김민수;오용복;권영웅
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.757-762
    • /
    • 2000
  • The target of this study is to compare and analyze the strengthening effect of damaged reinforced concrete beams under unloading and loading conditions through the simulation of strengthening condition in real structures. The conclusion of test results are as follows : For the concrete beam wrapped at the side in addition to be strengthened at the bottom, the strength and stiffness increase. although the flexural capacity depends on the strengthening method, it generally shows that the strength improve in the range of 22% to 39% in comparison with the specimen without strengthening. In case of applying th equation suggested by CangaRao & Vijay for the wraped concrete beam, it must be modified because it is likely to overestimate the flexural capacity considering the height of wrapping as the width of concrete. The strength an stiffness of reinforced concrete beams in proportion to the percentage of damage decrease. Damaged beams, which are strengthened by CFS, is structurally efficient and show reduction of strength comparing with the specimen without strengthening but stiffness is increasing.

  • PDF

Estimation of Maximum Load Capacity at Interconnection Line of High-Speed and Conventional Line (기존선-고속선 연결선 구간에서 최대부하용량 평가)

  • Lee, Chang-Mu;Lee, Han-Min;Oh, Seo-Chan;Kim, Gil-Dong;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1069-1070
    • /
    • 2008
  • At the coupling area linking high speed line and conventional line, according to distance between trains due to speed limit of conventional line, the power load of substation supplying to this conventional line increase. At the coupling area between Kimcheon SS and Kyoungsan SS, train operation have problems caused by instantaneous voltage drop. So, this paper propose evaluation method of maximum load capacity at current normal feeding condition.

  • PDF

Effect of stiffeners on failure analyses of optimally designed perforated steel beams

  • Erdal, Ferhat
    • Steel and Composite Structures
    • /
    • v.22 no.1
    • /
    • pp.183-201
    • /
    • 2016
  • Perforated steel beams can be optimised by increased beam depth and the moment of inertia combined with a reduced web thickness, favouring the use of original I-section beams. The designers are often confronted with situations where optimisation cannot be carried out effectively, taking account of the buckling risk at web posts, moment-shear transfers and local plastic deformations on the transverse holes of the openings. The purpose of this study is to suggest solutions for reducing these failure risks of tested optimal designed beams under applying loads in a self-reacting frame. The design method for the beams is the hunting search optimisation technique, and the design constraints are implemented from BS 5950 provisions. Therefore, I have aimed to explore the strengthening effects of reinforced openings with ring stiffeners, welded vertical simple plates on the web posts and horizontal plates around the openings on the ultimate load carrying capacities of optimally designed perforated steel beams. Test results have shown that compared to lateral stiffeners, ring and vertical stiffeners significantly increase the loadcarrying capacity of perforated steel beams.

A case Study for Protection Relay System of small Cogeneration intertie (단순병렬 자가발전 설비 보호방식 검토 사례)

  • Lee, S.J.;Kim, K.S.;Yoon, K.K.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.234-236
    • /
    • 2002
  • The Co-Gen System which maximize energy efficiency was installed at the industrial plants at the initial stage. However Small Scale Co-Gen System was expanded even to the general end-users such as housing and building owing to ESCO business recently. For this SSC, inter-connected operation to the utility is desirable due to voltage and frequency fluctuation following to unbalance between power output and load. Then voltage unbalance with utility system, frequency, increase of short circuit capacity, reclosing, and ALTS etc. should be fully considered for the inter-connected operation. Voltage variation, protection coordination, Co-Generators single running, and short circuit capacity should also be solved. To research the method and solve the problems through the field test and application, we study individual customers Co-Gen System as a case study.

  • PDF

Hierarchical placement with routing region assignment (배선 전용 영역을 이용한 계층적 배치)

  • 김원종;신현철
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.2
    • /
    • pp.130-139
    • /
    • 1995
  • A hierarchical placement system based on routing region assignment has been developed to increase the probability of routing completion after placement. While most of the existing placement systems attempt to reduce the cell density at the portions where routing density is high, our method is distinguished in that specific routing regions are allocated to secure complete routing where the routing density is greater than the routing capacity. Hierarchy is vuilt by clustering and recursive paritioning, and the initial placement obtained by partitioning at each level is improved by using the region refinement algorithm. After placement at each hierarchical level, global routing is performed and fouting regions are assigned, if routing density is greater than routing capacity, to be considered at the next level of placement. the proposed algorithm has been implemented and applied to place several industrical gate-array circuits. A couple of circuits which cannot be routed by using conventional placement techniques can be completely routed by using our new placement technique with routing region assignment.

  • PDF

Functional Properties of Sesame Protein Concentrates Produced by Ultrafiltration (한외여과에 의해 제조된 참깨박 농축단백질의 기능적 특성)

  • 전정례;박정룡
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.10 no.5
    • /
    • pp.394-403
    • /
    • 2000
  • The functional properties of sesame protein concentrate(SPC) using different size of ultrafiltration(UF) membranes were examined and compared with those of conventional acid-precipitated sesame protein concentrate. The protein contents of SPC by UF with molecular size of 10K, 30K and look dalton membranes were 84.2%, 82.7%, and 76.4%, respectively, and that of acid-precipitated SPC was 88.7%. The nitrogen solubility of SPC by UF was higher than that of conventional SPC at various pH levels. Especially, it showed three-fold increase at near isoelectric point. However, water absorption capacity and fat absorption capacity of SPC by UF were decreased. For emulsion and foam properties, there were no significant differences between SPC by acid precipitation and SPC by UF method. At various pH levels, SPC by membrane with pore size of 30K dalton showed the highest emulsion properties. The SPC by UF had slightly higher viscosity than defatted sesame flour and SPC by acid precipitation.

  • PDF

A Study on replacing transmission lines with STACIR for increasing power transmission capacity in the 345kv transmission system (345KV 송전선로의 송전용량 증대를 위한 STACIR 전선교체기술)

  • Kim, Yeong-Han;Bang, Hang-Kwon;Cho, Dae-Sung
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1103-1105
    • /
    • 1998
  • It is becoming more and more difficult to construct new transmission lines because of many social problems. According to the load increase, Some of existing transmission lines will be heavy loaded over the limit. To solve this situation, one of method is peformed by replacing existing ACSR transmission lines with STACIR for increasing power transmission capacity in the 345kv transmission system. This paper presents several techniques for design and construction of transmission line replacement based on the actual experience in the 345kv Shinseongnam-Shinsiheung and Shinseongnam-Shinyeongseo transmission lines.

  • PDF

A Rule-Based Algorithm for Common Pilot Channel and Antenna Tilt Optimization in UMTS FDD Networks

  • Gerdenitsch, Alexander;Jakl, Stefan;Chong, Yee-Yang;Toeltsch, Martin
    • ETRI Journal
    • /
    • v.26 no.5
    • /
    • pp.437-442
    • /
    • 2004
  • In this paper we address the problem of capacity optimization in a Universal Mobile Telecommunication System (UMTS) radio network. We present an optimization algorithm for finding the best settings of the antenna tilt and common pilot channel power of the base stations. This algorithm is a parametric method, based on a set of rules. We evaluated our optimization technique on a virtual network scenario with 75 cells. For this scenario we show an increase in capacity compared to the initial settings of about 60 percent.

  • PDF

An Improved Error Expansion Reversible Watermarking for 3D Mesh Model

  • Dong, Ke-Ming;Kim, Hyoung-Joong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.979-981
    • /
    • 2011
  • In this paper, a new scheme to improve both the capacity and distortion performance for error-prediction method is proposed. For every triangle mesh, two vertices were selected to predict the rest vertex, and the prediction error distances which were vertical and paralleled to the edge between these two vertices would be used to embed two units of secret date amount. We sort the meshes before embedding according to predicted error in order to decrease the distortion. Experiment results show that our approach increase the capacity and decrease the distortion as compared to the original algorithm.

Behaviour of Truss Bridges by Using the Post-tensioning (후긴장을 이용한 트러스의 성능 향상 평가)

  • Jeung, Bae-Keun;Han, Kyung-Bong;Eom, Jun-Sik;Park, Sun-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.2
    • /
    • pp.247-261
    • /
    • 2003
  • The technique of posttensioning has been used successfully to improve the performance of existing concrete structures. However, very few applications of this technique can be found in steel structures. Posttensioning by means of high strength cable or bar can be used to effectively increase the working load capacity of Truss Bridges. The benefits of posttensioning trusses can be achieved in strengthening of existing structures as well as in the design of new structures. In this paper, the elastic behavior of posttensioned trusses with straight and draped tendon profiles is examined. For the analysis of posttensioned trusses in the elastic range of behavior, two methods are presented, namely, the flexibility method and the mixed-method, i.e., a combination of the stiffness and flexibility methods. Using the presented methods, the effects of design variables such as the tendon profile, truss type, prestress force, and tendon eccentricity on the working load and deflection of trusses are studied. The results show that the allowable load of truss increases proportionally with increase in prestress force and eccentricity. Posttesioning enlarges the elastic range, increases redundancy, and reduces deflection and member stresses. Thus, the remaining life of a truss bridge can be increased relatively inexpensively.