• Title/Summary/Keyword: Capacity Planning

Search Result 896, Processing Time 0.028 seconds

Mitigation of Insufficient Capacity Problems of Central Bus Stops by Controlling Effective Green Time (유효녹색시간 조정을 활용한 중앙버스정류장 용량 부족 완화 방안 연구)

  • Koo, Kyo Min;Lee, Jae Duk;Ahn, Se Young;Chang, Iljoon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.35-50
    • /
    • 2022
  • After the introduction of the central bus lane system, bus traffic was prioritized. This resulted in improved trust from bus users. However, the low capacity at the central bus stop reduces traffic speed and punctuality. In addition, physical constraints are inevitable because the construction of central bus lanes and bus stops considers the city's road geometry. Therefore, this study attempted to optimize the effective green time of the traffic signal system at the entrance and exit of the central bus stop to remedy its insufficient operational capacity. The Transit Capacity and Quality of Service Manual and Korea Highway Capacity Manual were used as the analysis methodologies. The number of stop areas for central bus stops to be built was determined by excluding variable physical factors, and field survey data collected from nine randomly selected central bus stops currently installed in Seoul were used. A scenario analysis was conducted on the central bus stops with insufficient capacity by adjusting the effective green time, and the capacity of the central bus stop was set as the dependent variable. According to the results, 26.7 percent of the central bus stops with insufficient capacity can solve the problem of insufficient capacity. Therefore, the results of this study can be verified by improving the operation level, and it can be effective even if the number of central bus stops calculated by engineering is not guaranteed during the planning stage of the central bus stop. As the number of central bus stops is expected to increase further as the number of central bus stops increases, it is necessary to improve the number of central bus stops. Therefore, it is hoped that the results presented in this study will be used as basic data for the improvement plan at the operational level before introducing the physical improvement plan.

Modeling New Generation Expansion Planning Problems for Applications in Competitive Electric Power Industries (전력시장에 적용 가능한 새로운 전원개발계획문제 모델링)

  • 김진호;박종배;박준호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.521-528
    • /
    • 2004
  • The demise of the native franchise markets and the emergence of competitive markets in electricity generation service is substantially altering the way that operation and planning activity is conducted and is making it increasingly difficult for market participants such as generation firms to prospect the future electricity markets. Traditional generation expansion planning (GEP) problems which centrally determine the least-cost capacity addition plan that meets forecasted demand within pre-specified reliability criteria over a planning horizon (typically 10 to 20 years) is becoming no more valid in competitive market environments. Therefore, it requires to develop a new methodology for generation investments, which is applicable to the changed electric industry business environments and is able to address the post-privatization situation where individual generation firms seek to maximize their return on generation investments against uncertain market revenues. This paper formulates a new generation expansion planning problem and solve it in a market-oriented manner.

Study on supporting replacement cost to the insufficient breaking capacity breaker for 154kV customer (154kV 이상 수전고객 고장전류 차단용량 부족 차단기 교체비용 지원 검토)

  • Hwang, Jong-Young;Park, Jin-Hong;Won, Young-Jin;Ahn, Kwang-Won;Kim, Jae-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.153-154
    • /
    • 2008
  • 우리나라 전력수요의 지속적인 증가는 발전설비 및 송전망의 동반 성장으로 전력계통 규모가 꾸준히 확장되어 왔다. 그러나 이로 인해 전력계통 고장전류가 증가하는 문제가 발생하여, 그에 대한 대책으로 차단기 교체 등을 시행하고 있다. 이와 관련하여 고객서비스차원에서 한국전력은 전원 측 계통확장으로 인한 차단용량 부족 154kV 이상 수전고객에 대해서 차단기를 교체하도록 차단기 교체을 지원하기로 하였다. 이에 본 논문에서는 한국전력에서 시행하고자 하는 대용량고객 차단기 교체 지원내용에 대하여 알아보고자 한다.

  • PDF

A Stochastic Pplanning Method for Semand-side Management Program based on Load Forecasting with the Volatility of Temperature (온도변동성을 고려한 전력수요예측 기반의 확률론적 수요관리량 추정 방법)

  • Wi, Young-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.6
    • /
    • pp.852-856
    • /
    • 2015
  • Demand side management (DSM) program has been frequently used for reducing the system peak load because it gives utilities and independent system operator (ISO) a convenient way to control and change amount of electric usage of end-use customer. Planning and operating methods are needed to efficiently manage a DSM program. This paper presents a planning method for DSM program. A planning method for DSM program should include an electric load forecasting, because this is the most important factor in determining how much to reduce electric load. In this paper, load forecasting with the temperature stochastic modeling and the sensitivity to temperature of the electric load is used for improving load forecasting accuracy. The proposed planning method can also estimate the required day, hour and total capacity of DSM program using Monte-Carlo simulation. The results of case studies are presented to show the effectiveness of the proposed planning method.

A Study on the Residents' Participation principles in Rural Environmental Planning process (농촌환경계획 과정에서의 주민 참여 원리)

  • Oh, Hae-Sub
    • Journal of Agricultural Extension & Community Development
    • /
    • v.5 no.2
    • /
    • pp.153-164
    • /
    • 1998
  • Rural Environmental Planning (REP) is a method used by citizens in small towns and rural areas to plan their own future. REP assumes that the primary social value of rural people is to enhance a community's longterm viability by respecting the carrying capacity of the natural environment. REP derives its strength from the direct participation of those people affected by a plan. They determine its goals, shape its content, and implement its components. And both the rural environmental planner and the citizens involved in planning in their community must have a working knowledge of the legal framework of planning. In the results, REP reduces the cost of planning by drawing public agencies, not-for-profit organizations, volunteers from the private sector, and all vital resources available to rural people when they plan for their future.

  • PDF

Conceptual Design of Production Planning and Scheduling Module to Improve Delivery Quality

  • Choi, Jung-Sang
    • Journal of the military operations research society of Korea
    • /
    • v.29 no.1
    • /
    • pp.112-119
    • /
    • 2003
  • The procedure and implementation of an simulation based production planning and scheduling system. Production planning and scheduling is important problem in manufacturing field. It is so important for delivery quality as well as productivity, too. In this paper, heuristic production planning and scheduling module for improving delivery quality and productivity will be discussed. Beginning with total demand and initial work in process, the algorithms for production scheduling and planning can efficiently generate a feasible production resources and capacity schedule results in high resource utilization, minimum number of the late orders and reduced labor variability. The algorithm is executed to achieve the best on time delivery performance. The developed heuristic algorithms in the module will be expected to provide the better delivery performance and productivity.

Application of Opposition-based Differential Evolution Algorithm to Generation Expansion Planning Problem

  • Karthikeyan, K.;Kannan, S.;Baskar, S.;Thangaraj, C.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.686-693
    • /
    • 2013
  • Generation Expansion Planning (GEP) is one of the most important decision-making activities in electric utilities. Least-cost GEP is to determine the minimum-cost capacity addition plan (i.e., the type and number of candidate plants) that meets forecasted demand within a pre specified reliability criterion over a planning horizon. In this paper, Differential Evolution (DE), and Opposition-based Differential Evolution (ODE) algorithms have been applied to the GEP problem. The original GEP problem has been modified by incorporating Virtual Mapping Procedure (VMP). The GEP problem of a synthetic test systems for 6-year, 14-year and 24-year planning horizons having five types of candidate units have been considered. The results have been compared with Dynamic Programming (DP) method. The ODE performs well and converges faster than DE.

The Monthly Water Supply Reliability Indexes in the Parallel Reservoir System

  • Park, Ki-Bum;Kim, Sung-Won;Lee, Yeong-Hwa
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1612-1615
    • /
    • 2009
  • Water supply reliability indexes (WSRI) is estimated for assessment of water supply capacity in the downstream for parallel reservoir system in Nakdong River, South Korea, using allocation rule (AR) according to the water supply capacity of each reservoir and the characteristic of parallel reservoir system. The result of the analyzing parallel reservoir system for Andong and Imha reservoir in Nakdong River does not include evidences available enough to decide whether the results of water supply analysis are excellent in the current reliability evaluation or not. However, AR (C) shows a good result in the water supply capacity for each reservoir based on the connected operation system and the total water supply capacity at the control point of downstream by the average water supply capacity and possible range of water supply capacity suggested by this study. The average water supply capacity is analyzed by the reliability of monthly average water supply capacity. Furthermore, the possible range of water supply capacity is estimated by the standard deviation when water deficit occurs. Therefore, AR (C) is useful to establish and estimate the planning water supply capacity according to the monthly water supply condition and the possible range of water supply capacity when the water supply capacity deficit occurs, South Korea.

  • PDF

Study on the optimal storage-capacity based on the commodity volume in apartments - Focused on $85m^2$ apartment - (물품부피에 근거한 적정수납용적에 관한 연구 - 30평형대 아파트를 중심으로 -)

  • Lee, Youn-Jae;Kim, Joon-Ji;Lee, Hyun-Soo
    • Korean Institute of Interior Design Journal
    • /
    • v.15 no.6 s.59
    • /
    • pp.139-149
    • /
    • 2006
  • Because of economic growth and the social trend to respect individuality, people's average commodity volume tends to increase. It makes people perceive the importance of storage space. The storage planning without consideration of commodity volume in the apartment can not satisfy the needs of residents. This study is developed focused on the $85m^2$ apartment which is the most representative and general type. The objectives of the study are to investigate the storage-capacity of $85m^2$ apartment offered by 4 construction companies to know the present storage condition, to investigate the average volumes and type of commodities in 30 families located in Seoul and Kyungkido to produce the necessary storage-capacity, and lastly to produce optimal storage-capacity and proportion of optimal storage-capacity considering the volume of the furniture owned by each resident. The results of the study are 1) the storage capacity for commodity volume in $85m^2$ apartment is $19.41m^3$. 2) the optimal storage-capacity which only counts the storage volume of built-in furniture is $17.14m^3$ 3) the proportion of optimal storage-capacity is 9.5% of the house-capacity.

An Analysis on the Adequate Level of Capacity Price from a Long-Term Generation Expansion Planning Perspective: the Case of Korea

  • Kim, Hyoungtae;Lee, Sungwoo;Kim, Tae Hyun;Shin, Hansol;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.6
    • /
    • pp.2203-2211
    • /
    • 2018
  • Capacity payment mechanism has been adopted as the incentive scheme to achieve resource adequacy in Korean electricity market, however, the level of capacity price has been controversial due to its insufficient extent to incur financial loss for certain generators. Therefore, a new method is proposed to estimate the proper level of capacity price incorporating profitability of market participants and resource adequacy in this paper. The proposed method is successfully applied to test system based on Korean power system.