• Title/Summary/Keyword: Capacity Planning

Search Result 891, Processing Time 0.026 seconds

A study on the power expansion planning model using multi-criteria decision making rule (다기준 의사결정 모형을 이용한 전력수급계획 모형에 관한 연구)

  • Han, Seok-Man;Kang, Dong-Joo;Kim, Kwang-Mo;Hong, Hee-Jung;H. Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.77-79
    • /
    • 2008
  • The power expansion planning is large and capital intensive capacity planning. In the past, the expansion planning was established with the proper supply reliability in order to minimize social cost. However, the planning not used cost minimizing objective function in the power markets with many market participants. This paper proposed the power expansion planning model using multi-criteria decision rule. This model used multi objective function considering not only cost minimizing but also GENCO's intension. This paper compared proposed model with WASP model in order to verify the result of proposed model.

  • PDF

The development of expansion planning algorithm considering environmental constraints (환경 제약을 고려한 설비계획 방법론 개발)

  • Kim, Yang-Il;Chung, Koo-Hyung;Shin, Hye-Kyeong;Kim, Bal-Ho H.
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.164-166
    • /
    • 2006
  • Wien Automatic System Planning Package (WASP) which is used to draw out generation expansion planning applies Dynamic Programming in Korea power system panning. While this package has an advantage that computes annual capacity, it has a disadvantage that can't consider environmental constraints. With the effectuation of the Kyoto Protocol in February, 2005, it is expected that CO2 emission has a severe effect on Korean power system. Therefore, as the most important issue, the generation expansion planning considering environmental constraints is rising in power system. This paper develops a mathematic model including not only generation expansion planning but transmission planning and considering regional supply-demand and environmental constraints, especially CO2 emission, and verifies propriety through the case study.

  • PDF

Strategic Electricity Resource Planning using EGEAS Model (EGEAS 모형을 활용한 전략적 전원개발 계획)

  • Kwon, Y.H.;Kim, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.144-147
    • /
    • 1993
  • The long-term electricity resource planning of electric utility has undergone significant change during the past decade. The current resource planning can be considered as multi-objective decision making procedure under the various uncertainties such as demand growth, construction cost, fuel price, environmental regulation, plant site, financial adequacy, new technology advent and so on. This paper presents a standardized electricity resource planning scheme using the strategic planning concept. EGEAS computer model was fully applied to indentify feasible alternative plans and simulate various attribute values corresponding each alternative plan and future. As a case study, a hypothetical long-ten capacity expansion planning problem is analyzed.

  • PDF

A Study on the Utilization Planning of Unused Classrooms of Primary Schools by the Change of Curriculums (교육과정 변천에 따른 초등학교 유휴교실 활용방안에 대한 연구 - 충청북도 초등학교를 대상으로 -)

  • Kim, Seunggeun;Jung, Jinju;Choi, Hyoseung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.2 no.1
    • /
    • pp.13-24
    • /
    • 2000
  • This study aims at revealing important utilization planning by surveying and analyzing unused classrooms in primary school's facilities. That is various and positive utilization planning of unused classrooms in order to cope with the changes of educational environment focused on high and multi-functionization, rather qualitative aspect than quantitative. By field-survey and interview, physical and environmental factors such as, the change procedure of students, unused facilities in schools and improvement affairs and purpose stressed by schools were surveyed. Additionally, the way of educational facilities to future society linked with residents was examined by surveying about the relationship between educational facilities and regional communities. The curriculums and "School facilities standard ordinance" have been revised in part by several times individually and couldn't meet with educational facilities, educational and social change positively. In rural area, to apply the standard of the capacity by a class with 40 students like city is not desirable. To make educational environment better qualitatively, the capacity should be reduced by 30 students and the unit square per a student enlarged by $2.4m^2$. By room unit module "school institution and managerial regulations under high school" should be applied distinctively to break down like 6, 7~12, 13~24 and over 25 classes. So re-institution of the capacity by a class and the standard unit of the number of class by scale is needed.

  • PDF

Buffer System Design in the Flexible Manufacturing System Environments (유연생산(柔軟生産)시스템에서의 버퍼시스템 설계(設計))

  • Gang, Hui-Jeong;Kim, Hwan-Seong;Jo, Nam-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.2
    • /
    • pp.118-128
    • /
    • 1992
  • The determination of appropriate buffer capacity is an important issue in the design of the advanced manufacturing systems and closely related to the system efficiency and flexibility. Work-in-process is usually not desirable. However, in reality, maintaining some capacity of buffer storage is inevitable in compensation for the machine blocking and break down. The objective of this paper is to present analytical methods and tools for the buffer capacity planning in the Flexible Manufacturing System Environments. The effects when machine blocking is critical factor are also discussed.

  • PDF

A Study on the Development of a Route Capacity Calculation Model for Improving Railway Operation Efficiency (철도 운행효율성 향상을 위한 노선용량 산정모형 개발에 관한 연구)

  • Kim, Bong-Jun;Kim, Si-gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.75-83
    • /
    • 2021
  • Over-urbanization has contributed to the increase in traffic problems. This makes the need for effective road planning and design more important than ever. I have been able to learn how to build a new road, and how to use it. However, in spite of the importance of good road planning, there are no systematic standards or methods for calculating traffic volume on railroad routes. Therefore, in this study, to strengthen the competitiveness of railroads, the concept of line capacity is introduced to railroads, and a clear standard and method for calculating railroad line capacity are presented. Based on the results, the line capacity of main railway lines for domestic railways was calculated. By applying the method of calculating the line capacity presented in this study, the capacity of existing railway lines and newly expanded routes can be calculated. It is expected that our findings will be able to provide systematic standards that can be applied to yield a more effective investment and design planning stage; the findings will also help improve the efficiency of railroad operation.

Strategies and measures for capacity building in rural development project (농촌개발사업 참여 주체의 역량 강화 방안)

  • Kim, Jeong-Seop;Kwon, In-Hye
    • Journal of Agricultural Extension & Community Development
    • /
    • v.17 no.3
    • /
    • pp.385-418
    • /
    • 2010
  • This study aimed to find the way to help participants build capacity in rural development projects, through some case studies and Q-methodology. Decentralization and diffusion of bottom-up approach in rural development projects are the main contextual factors in this study. With the ethos of bottom-up approach in rural development, the human and financial inputs for capacity building increased drastically in the area of rural development policy. Four types of capacity building methods were identified in this study; training, consulting, learning organization, and forum. Theses methods were used more at planning step than implementation step in rural development projects. The government's effort to strengthen leadership in rural areas should be continued. The existing government's training program for capacity building had better include more diverse clients. Actions for capacity building should be centered on the needs of the participants in fields. Especially, organizing learning units is very important. Governments' rural development policy should establish the proper process which can help local actors plan their projects with enough time span.

Analysis of Capacity Factors and Capacity Credits for Wind Turbines Installed in Korea (국내 풍력발전 설비의 이용률과 용량크레딧 분석)

  • Paik, Chunhyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.4
    • /
    • pp.79-91
    • /
    • 2019
  • The capacity credit (CC) is a key metric for mid- to long-term power system capacity planning. The purpose of this study is to estimate the CCs of domestic wind turbines. Based on hourly capacity factor (CF) data during the seven years from 2011 to 2017, the new so-called probabilistic CF scheme is introduced to effectively reflect the variability of CFs on CC estimation. The CCs are then estimated through the CF-based method and the ELCC (Effective Load Carrying Capability) method reflecting the probabilistic CF scheme, and the results are compared. The results show that the CC value 0.019 for domestic wind turbines proposed in the $8^{th}$ Basic Plan for Electricity Supply and Demand corresponds to the CC with a confidence level slightly lower than 95%.

Mitigation of Insufficient Capacity Problems of Central Bus Stops by Controlling Effective Green Time (유효녹색시간 조정을 활용한 중앙버스정류장 용량 부족 완화 방안 연구)

  • Koo, Kyo Min;Lee, Jae Duk;Ahn, Se Young;Chang, Iljoon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.35-50
    • /
    • 2022
  • After the introduction of the central bus lane system, bus traffic was prioritized. This resulted in improved trust from bus users. However, the low capacity at the central bus stop reduces traffic speed and punctuality. In addition, physical constraints are inevitable because the construction of central bus lanes and bus stops considers the city's road geometry. Therefore, this study attempted to optimize the effective green time of the traffic signal system at the entrance and exit of the central bus stop to remedy its insufficient operational capacity. The Transit Capacity and Quality of Service Manual and Korea Highway Capacity Manual were used as the analysis methodologies. The number of stop areas for central bus stops to be built was determined by excluding variable physical factors, and field survey data collected from nine randomly selected central bus stops currently installed in Seoul were used. A scenario analysis was conducted on the central bus stops with insufficient capacity by adjusting the effective green time, and the capacity of the central bus stop was set as the dependent variable. According to the results, 26.7 percent of the central bus stops with insufficient capacity can solve the problem of insufficient capacity. Therefore, the results of this study can be verified by improving the operation level, and it can be effective even if the number of central bus stops calculated by engineering is not guaranteed during the planning stage of the central bus stop. As the number of central bus stops is expected to increase further as the number of central bus stops increases, it is necessary to improve the number of central bus stops. Therefore, it is hoped that the results presented in this study will be used as basic data for the improvement plan at the operational level before introducing the physical improvement plan.

Modeling New Generation Expansion Planning Problems for Applications in Competitive Electric Power Industries (전력시장에 적용 가능한 새로운 전원개발계획문제 모델링)

  • 김진호;박종배;박준호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.521-528
    • /
    • 2004
  • The demise of the native franchise markets and the emergence of competitive markets in electricity generation service is substantially altering the way that operation and planning activity is conducted and is making it increasingly difficult for market participants such as generation firms to prospect the future electricity markets. Traditional generation expansion planning (GEP) problems which centrally determine the least-cost capacity addition plan that meets forecasted demand within pre-specified reliability criteria over a planning horizon (typically 10 to 20 years) is becoming no more valid in competitive market environments. Therefore, it requires to develop a new methodology for generation investments, which is applicable to the changed electric industry business environments and is able to address the post-privatization situation where individual generation firms seek to maximize their return on generation investments against uncertain market revenues. This paper formulates a new generation expansion planning problem and solve it in a market-oriented manner.