• 제목/요약/키워드: Capable to Promise

검색결과 32건 처리시간 0.023초

공급망상에세 CTP 알고리즘을 이용한 납기확약 시스템 모델링 (Modeling Due-date Promising system using CTP Algorithm in SCM Environment)

  • 최진;박상민;남호기;이종천
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.117-127
    • /
    • 2003
  • This Study will introduce the concept of ATP(Available To Promise) and CTP(Capable to Promise) through the existing study , the process analysis of CTP(Capable to Promise), the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models espicially through using LPST(Latest Possible Start Time) and EPST(Earlist Possible Start Time) method. It is important part of executing CTP(Capable to Promise), The CTP(Capable to Promise) modeling and implementing system develops to system which is capable to implement in the various business environment through addational and continuous research.

  • PDF

공급망상에서 CTP 알고리즘을 이용한 납기확약 시스템에 관한 연구 (Study Due-date Promising system using CTP Algorithm in SCM Environment)

  • 박상민;남호기;최진;이종천
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.97-108
    • /
    • 2004
  • This Study will introduce the concept of A TP(A vailable To Promise) and CTP(Capable to Promise) through the existing study, the process analysis of CTP, the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models using LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP systems. The CTP modeling and implementing develops to system which is capable to implement in the various business environment through additional and continuous research.

SCM을 위한 납기확약기반 생산계획 및 수주시스템 (Production Planning and Order Receiving System for Capable-To-Promise in Supply Chain Management)

  • 김내헌;노승종;왕지남;임석철
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.396-404
    • /
    • 2000
  • For most order-based production, it is important to meet urgent orders from important customers while maintaining high on-time delivery rate for successful supply chain management. In this paper, we propose an approach and a structure of planning system to implement Capable-To-Promise which promises the delivery time to the received order. We suggest and compare a few alternative order receiving policies for CTP.

  • PDF

Order Promising Rolling Planning with ATP/CTP Reallocation Mechanism

  • Chen, Juin-Han;Lin, James T.;Wu, Yi-Sheng
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.57-65
    • /
    • 2008
  • Available-to-promise (ATP) exhibiting availability of manufacturing resources can be used to support customer order promising. Recently, one advanced function called Capable-to-promise (CTP) is provided by several modern APS (advanced planning system) that checks available capacity for placing new production orders or increasing already scheduled production orders. At the customer enquiry stage while considering the order delivery date and quantity to quote, both ATP and CTP are allocated to support order promising. In particular, current trends of mass customization and multi-side production chain derive several new constraints that should be considered when ATP/CTP allocation planning for order promising - such as customer's preference plants or material vendors, material compatibility, etc. Moreover, ATP/CTP allocation planning would be executed over a rolling time horizon. To utilize capacity and material manufacturing resource flexibly and fulfill more customer orders, ATP/CTP rolling planning should possess resource reallocation mechanism under the constraints of order quantities and delivery dates for all previous order promising. Therefore, to enhance order promising with reliability and flexibility to reallocate manufacturing resource, the ATP/CTP reallocation planning mechanism is needed in order to reallocate material and capacity resource for fulfilling all previous promised and new customer orders beneficially with considering new derived material and capacity constraints.

MTO와 MTS기반의 생산방식에서의 CTP 시스템 개발에 관한 연구 (A study on the CTP System development at manufacture based MTO and MTS)

  • 여성주;류석곤;왕지남
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.534-537
    • /
    • 2000
  • Recently, A manufacturing formula centered of the customer is one of the most important parts for the company competition. Especially, it is the matters of weight and importance that Make to Order(MTO) and Make to stock(MTS) is considered at the same time for designing manufacturing system based the order effectly. This paper suggests a alternative Available to promise(ATP) and capable to promise(CTP) to confirm the delivery time to customer, how to link mid-long term production plan with short term daily based scheduling, how to relate middle processes of device based industry to mid-long term plan through the example of S company in a manufacturing formula mixed MTO and MTS

  • PDF

납기확약을 통해 고객 신뢰성 향상을 도모하기 위한 CTP 시스템에 관한 연구 (-CTP System Study for Customer Reliability Improvement through Due date Promising-)

  • 오성환;박영기;강경식
    • 대한안전경영과학회지
    • /
    • 제6권3호
    • /
    • pp.121-130
    • /
    • 2004
  • This Study will introduce the concept of CTP(Capable-to-Promise) Algorithm, CTP process, and the modeling of algorithm. This research is based on the environment of using Job-Shop method. CTP algorithm model use LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP system. The CTP modeling and implementing develops to system which is able to implement in the various business environment through additional and continuous research.

Advances in Materials for Proton Exchange Membrane based Fuel Cells

  • McGrath James E.
    • 한국고분자학회:학술대회논문집
    • /
    • 한국고분자학회 2006년도 IUPAC International Symposium on Advanced Polymers for Emerging Technologies
    • /
    • pp.58-59
    • /
    • 2006
  • Less than a decade ago, most alternate membrane materials for fuel cells relied upon a post-sulfonation process to generate ionic groups capable of transporting protons from the anode to the cathode. These random post sulfonations showed some promise, but in general they produced materials that were not sufficiently stable or protonically conductive at ion exchange capacities where aqueous swelling could be restricted. Our group began to synthesize disulfonated monomers that could be used to incorporate into random copolymer proton exchange membranes. The expected limitation was that the aromatic polymers might not be stable enough to withstand fuel cell conditions. However, this was mostly based upon an accelerated test known was the Fenton's Reagent Test, which did not seem to this author as being a reliable predictor of performance. A much better approach has been to evaluate the open circuit voltage (OCV) for alternate membranes, as well as the benchmark perfluorosulfonic acid systems. When this is done, the aromatic ionomers of this study, primarily based upon disulfonated polyarylene ether sulfones, show up quite well. Real time 3000 hours DMFC results have also been generated. Obtaining conductive materials at low humidities is another major issue where alternate membranes have not been particularly successful. In order to address this problem, multiblock copolymers with relatively high water diffusion coefficients have been designed, which show promise for conductivity at lowered humidity.

  • PDF

시뮬레이션에 기초한 일정계획 시스템에서의 납기산정 절차 (An Order Promising Procedure for Simulation-Based Scheduling Systems)

  • 박문원;최성훈;이근철;김영대
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.103-108
    • /
    • 2002
  • 본 연구는 주문형 반도체 생산공장이나 인쇄회로기판 제조공장과 같이 매우 다양한 제품들을 주문에 의해 생산하며 제조공정이 매우 길고 복잡한 생산 시스템에 대하여 다룬다. 이러한 생산 시스템은 그 특성상 APS (Advanced Planning and Scheduling)의 일정계획(scheduling) 모듈로서 시뮬레이션(simulation)이 유일한 대안이 되는 경우가 발생할 수 있다. 시뮬레이션 기법은 복잡한 상황도 대부분 묘사가 가능하기 때문에 사실적이고 실현 가능한 일정계획을 생성할 수 있다는 장점이 있는 반면 수행시간이 상당히 길다는 단점이 있다. 기업이 경쟁력을 가지기 위해서는 고객이 의뢰한 주문에 대하여 가능 납기(가능한 생산완료 시점)를 빠른 시간 내에 정확히 알려주어야만 한다. 따라서, APS 역시 "즉시 납기산정, 정시 납품:(commit now, deliver on time)을 캐치프레이즈(catch phrase)로 한다. 하지만 시뮬레이션은 :정시 납품:이 가능한 납기를 산정할 수 있을지는 모르지만 "즉시 납기산정"이 불가능하다. 따라서, 본 연구에서는 시뮬레이션에 근거한 일정계획 모듈을 가지고 있는 APS 시스템에서 납기산정을 빠르고 정확하게 할 수 있는 방법론을 제시한다. 이 방법론은 기존의 MRP Ⅱ 및 ERP 시스템에서 행하던 ATP (available to promise) 흑은 CTP (capable to promise) 기법과 차별화 되며, 의뢰한 주문의 생산착수 시점과 제조 리드타임을 합리적이고 신속하게 산출한다.

  • PDF

주문생산에 필수적인 진보적 생산계획 시스템 (Advanced Planning System: A Prerequisite for Achieving Build-to-Order Environment)

  • 강윤식;이휘재;문광원;노성관;임헌욱
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.93-96
    • /
    • 2002
  • The manufacturing paradigm has shifted dramatically over the past decade from “push” or mass production mode to “pull” or customer-driven, order-based manufacturing mode, as multitudes of customers now demand mass customization of configurable products. As a means to achieve such rapidly responsive manufacturing system, Advanced Planning System (APS) has become an essential software tool for achieving modern “build-to-order” and “configure-to-order” manufacturing environment. APS enables manufacturers to respond to variety of customer demands In real time by instantly configuring manufacturing processes based on specifications described in each purchase orders and providing capable-to-promise information directly to customer by performing rapid “what-if” manufacturing simulated scenarios. This paper discusses the working of such system as well as the business processes that incorporate such systems to enable efficient “build-to-order” environment.

  • PDF

Ultra-thin Film Assembly of a Novel Biomaterial Containing Protein and Functionalized Polymer for Sensor Application

  • 임정옥;손병기;허증수
    • 센서학회지
    • /
    • 제4권4호
    • /
    • pp.81-87
    • /
    • 1995
  • A novel biomaterial capable of incorporating biotinylated biomolecule has been synthesized. Our strategy is to biotinylate one-dimensional electroactive polymers and use a bridging streptavidin protein on Langmuir-Blodgett (LB) organized films. These copolymers are derivatized with long alkyl chains and biotin moieties to bind, respectively, to the hydrophobic surface and the biotinylated species, through the biotin and streptavidin complexation. We utilize the polymer assembly approach to attach a signal transducing biomolecule biotinylated phycoerythrin (B-PE) into this novel biomaterial by binding the unoccupied biotin binding sites on the bound streptavidin (4 sites total). The pressure-area isotherm of the protein injected monolayer showed area expansion. A characteristic fluorescent emission peak at 576nm was detected from the monolayer transferred onto a solid substrate. These observations demonstrated the promise of the organized thin polymer assemblies for their application to the sensor system.

  • PDF