• Title/Summary/Keyword: Capability Maturity Model Integration

Search Result 39, Processing Time 0.037 seconds

A Study on Correlation between the CMMI SPs and GPs at Maturity Levels 2 and 3

  • Lee, Min Jae;Rhew, Sung-Yul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.9-21
    • /
    • 2011
  • Assuming that the Capability Maturity Model Integration for Development v1.2 (CMMI) could be applied to an organization more effectively if the content similarities among practices were improved in terms of structure and composition, this paper presents the analysis of the correlations between the CMMI Specific Practices (SP) and Generic Practices (GP) for the Maturity Level 2 and 3 Process Areas using the Chi-square independence test. According to the analysis, a 22.2% correlation was observed. To minimize the problem of repeatedly applying similarities, 6 GPs that are highly correlated with the SPs were grouped together. Then, three different improvement plans: 1) development of a standard template-based project plan, 2) establishment of a configuration management system based on open source software to control work products and leverage experience, and 3) establishment of project assurance through an independent quality assurance-based organization and intensive review by higher-level management - were defined.

On a Maturity Model for the Institutionalization of Integrated SE&PM Process at Organization Level (시스템공학 및 프로젝트관리 통합프로세스의 조직 내재화를 위한 성숙도 모델에 관한 연구)

  • Choi, Young-Gil;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.725-732
    • /
    • 2016
  • To develop large-scale complex systems, many organizations have attempted to improve the processes specified in systems engineering (SE) and project management (PM) by adopting CMMI (Capability Maturity Model Integration). On the other hand, most domestic organizations that already acquired CMMI level 3 have focused on SE&PM practices while providing less investment in building up the environment for institutionalizing those processes. In such organizations, the process maturity without advancing to institutionalization can be neither enhanced nor maintained. To resolve the problem, the following remedies can be suggested. A standard process should first be defined to meet the business mission of the organization and to carry out the process successfully, the people should be properly trained and the appropriate tools be provided. In this study, a maturity model to accomplish institutionalization was examined based on the aforementioned P-P-T (Process-People-Tool) concept. The model proposed would be useful in developing strategies and plans for process institutionalization when the organizations are in the preparation stages for a CMMI certificate or have already acquired one.

A Study on Derivation of Railway Software Safety Management Procedure (철도소프트웨어 안전성 관리체계 계시방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.244-246
    • /
    • 2006
  • Softwares in railway system are being used in the area of railway control system, directly associated to safety. Because the instinct characteristic of Software is uncertainty, Software development without safety insurance is very hazardous situation. In order to derive safety certification process in the railway system, certification and approval processes in the nuclear, aviation, and military area are studied. Software quality should be improved by two aspects : one is product aspect, another is process aspect. GS(Good Software) and ES(Excellent Software) certification can be exemplified in a product aspect approach. In those process certification, CMMI (Capability Maturity Model Integration) or SPICE (Software Process Improvement and Capability dEtermination : ISO/IEC15504) is being used as models for assessing process maturity of organization. Following the studies, safety management procedure in the railway system is suggested.

  • PDF

Design of Process Support System based on CMMI (CMMI 기반 프로세스 지원 시스템 설계)

  • Choi, Dong-Hee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.3
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

Kay Factors of SW Development Productivity in a CMMI Level 3 Organization (CMMI Maturity Level 3 조직에서 소프트웨어 개발 생산성에 영향을 미치는 중요 요인 연구)

  • Lee, Su-Hyoung;Lee, Dong-Hyun;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2009.11a
    • /
    • pp.833-834
    • /
    • 2009
  • 국내 많은 기업들이 CMMI(Capability Maturity Model Integration) 모델을 도입해서 소프트웨어 개발 프로세스를 구축 및 내재화 후 CMU(Carnegie Mellon University)의 SEI(Software Engineering Institute)로부터 인증을 받고 있지만, CMMI Maturity Level 3 이상 인증 받은 조직에서 조차도 프로젝트 지연 및 품질 문제가 자주 발생한다. 프로젝트 지연 문제는 개발 단계 이후에 대부분 발생되고 있으며, 이는 현저히 낮은 소프트웨어 개발 생산성의 영향 때문이다. 본 논문에서는 프로젝트 개발 생산성에 영향을 미치는 중요 요인을 분석하고, 이에 따른 작업의 가치를 결정하는 방법을 제시한다.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

Guidelines on process improvement and certificate program based on CMMI Model (철도차량 CMMI 모델기반 프로세스 개선 및 인증을 위한 지침)

  • Cho, Chi-Hwan;Cho, Moon-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2021-2034
    • /
    • 2008
  • This paper shows the result of study on the process improvement/innovation based on CMMI(Capability Maturity Model Integration) for Development V1.2 staged representation in the view of engineering area of software, hardware and system. This paper intend to help rolling stock industry to define & innovate process and finally obtain certificate for achievement of CMMI V1.2 from SEI authorized SCAMPI Lead Appraiser through the introduction experienced by Hyundai Rotem Company(car-builder and supplier of electronic & electrical equipment) such as why CMMI-based process definition & improvement are planned and how each processes of CMMI V1.2 Level 3 have been implementing and how obtaining the certificate of CMMI Maturity Level 3 of CMMI for Development V1.2 staged representation etc. This paper shows the introduction to CMMI V1.2 model, process improvement methodology and CMMI appraisal on the basis of Standard $CMMI^{SM}$ Appraisal Method for Process Improvement($SCAMPI^{SM}$), V1.2. And, this paper shows about what kinds of activities/practices of 18 processes(CMMI Maturity Level 3) is essentially implemented to satisfy their's specific goal and general geal through Hyundai Rotem Company's experiences. This paper shows the advantage and problem by adopting CMMI V1.2 model. Especially, it present the corrective/preventive actions against the identified problem in order to improve processes.

  • PDF

A Strategy for mapping Test Maturity Model(TMM) onto Capability Maturity Model Integration(CMMI) (테스트 성숙도 모델(TMM)과 능력 성숙도 모델 통합(CMMI)의 매핑 전략)

  • KiM Kidu;Shin Seok-kyoo;Kim R. Youngchul
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.307-309
    • /
    • 2005
  • 빠른 산업 발전 속에서 조직과 시스템이 복잡하고 대형화되면서 소프트웨어 품질을 향상시키고 그들의 신뢰성을 측정하기 위한 성숙도 모델들이 개발되었다. 그 중에서도 CMM와 이를 발전시킨 CMMI는 많은 조직에서 적용하기 위해 노력을 기울이고 있다. 하지만 두 모델들은 테스트 속성과 테스트 프로세스에 대한 언급이 부족하다. 본 논문에서는 모든 영역을 고려한 새로운 모델을 만들기 보다는 테스트 중심으로 개발된 TMM을 사용하여 CMMI과의 매핑을 통해 소프트웨어 조직의 생산품질과 신뢰성을 향상 시키는 방법을 제안한다. 논문에서는 CMMI 단점과 이를 보완하는 방법을 제안하고 이를 위해 TMM과 CMMI의 매핑전략에 언급한다. 이를 통해 기대되는 효과를 제시한다.

  • PDF

A Case Study on Application of R&D Quality Assurance to Secure High Quality for Military Supplies (군수품의 고품질 확보를 위한 개발 품질보증 적용사례 연구)

  • Choi, Chang-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.47 no.1
    • /
    • pp.151-162
    • /
    • 2019
  • Purpose: This study is in order to secure high quality of military supplies, it is important to secure design quality in the development phase. I will review how to establish a quality assurance system in the development phase based on the author's seminar presentation contents and application example of Hanwha Systems Co., Ltd. Methods: To guarantee design quality in the development phase, in 2002, quality assurance system that is adequate for SQA(Software Quality Assurance)'s requirements of CMM(Capability Maturity Model) was conduct. In 2009, based on the CMMI(Capability Maturity Model Integration) Level 5, there has been continuous and reenforced quality assurance activities. Results: By suggesting the construction and a case study on application of R&D quality assurance, it would be helpful for companies aiming to construct or enhance quality assurance system. Conclusion: To secure high quality for military supplies, a development QA system should be established to secure quality in the development phase. In addition, Total life cycle QA system for development, mass production and operation phase should be reestablished.

Empirical Study on Software Process Capability and Maturity Level, and Development of the Appraisal System (소프트웨어 프로세스 능력 및 성숙 수준에 관한 실증적 비교 분석과 평가 시스템 개발)

  • 홍정유;이수정;경원현;고석하
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2002.11a
    • /
    • pp.178-198
    • /
    • 2002
  • 1980년대 초기 미 국방성에서는 소프트웨어 개발업체의 소프트웨어 개발능력에 대한 판단 착오로 금전적, 시간적, 성능상의 많은 어려움을 겪어왔다. 따라서 미 국방성은 카네기 멜론 대학의 SEI(Software Engineering Institute)를 통하여 소프트웨어 개발능력을 측정하고, 조직의 소프트웨어 프로세스 성숙수준을 결정하기 위한 CMM(Capability Maturity Model)을 개발하였다. 그러나 CMM에 기반을 둔 소프트웨어 프로세스 평가 방법은 외부 전문가를 이용하여 평가하므로, 시간과 비용이 많이 소모되는 방법이다. 따라서 많은 기업에서 이러한 평가를 수행하는데 어려움을 느끼고 있다. 특히, 중ㆍ소규모의 조직에서 사용하기에는, CMM의 평가방법은 너무 복잡하고 추상적이다. 소규모 기업의 경우에 3년여에 걸친 프로세스 향상노력으로 많은 성과가 이루어 졌음에도 불구하고 CMM의 평가방법을 이용한 결과는 1 단계 수준을 벗어나지 못하였다는 사례들이 많이 발표되고 있다. 이러한 결과들은 CMM의 평가 방법은 중소 규모 조직에는 적절치 않다는 것을 입증한다. 따라서 중소 규모 기업이나 조직의 소프트웨어 프로세스의 성숙도 평가와 개선을 위한 모델들을 개발하기 위한 노력이 전 세계적으로 광범위하게 펼쳐지고 있다. 본 연구에서는 최근의 모델인 CMMI(Capability Maturity Model Integration)의 소프트웨어 프로세스 영역 분류에 의거해서, 우리나라의 소프트웨어의 개발과 취득에 관련된 조직들이 각 프로세스 영역을 얼마나 중요하게 평가하는지, 그리고 해당 영역에서의 기준, 절차 그리고 방법을 문서화시키는 것을 얼마나 중요하게 평가하는지를 조사하였다. 한국의 소프트웨어 개발 관행은 CMM이나 ISO Is504 등에서 바람직한 것으로 제시하고 있는 국제 표준과는 많이 다르며, 나아가서는 예를 들어, 미국의 일반적인 관행과도 많이 다를 수 있다. 따라서 미국이나 유럽의 대규모 소프트웨어 조직을 위해서 개발된 CMM이나 ISO 15504 등은 우리나라의 중소 규모 소프트웨어 조직에는 특히 부적절할 수 있다 본 연구에서는 우리나라 소프트웨어 조직의 종류, 조직의 규모, 그리고 프로젝트 수행 규모에 따라서 각 소프트웨어 프로세스 영역의 중요도가 어떻게 다른지, 그리고 해당 소프트웨어 프로세스 영역의 기준, 절차 그리고 방법을 문서화시킬 필요성이 어떻게 변하는가를 조사하였다. 본 연구 결과는 우리나라의 소프트웨어 조직들이 프로세스 개선을 위해서 무엇을 정말로 필요로 하는지를 밝힘으로써, 한국 소프트웨어 산업의 현실적인 특수성을 고려한 소프트웨어 프로세스 평가와 개선 모델의 개발을 위한 기초적인 자료를 제공할 것으로 예상된다 또한, 본 연구 결과는, 우리나라 소프트웨어 조직들이 실제로 무엇을 필요로 하는지를 밝힘으로써, 우리나라의 소프트웨어 산업을 육성하기 위한 실효성 있는 정책 입안을 위한 기초 자료를 제공할 것으로 예상된다.

  • PDF