• Title/Summary/Keyword: Cantilever bridge

Search Result 112, Processing Time 0.053 seconds

New Rehabilitation Method of Prestressed Concrete Rahmen Bridge with a Hinge at Midspan (프리스트레스트 콘크리트 활절 라멘교의 신보강공법 (상진대교구교적용))

  • 이원표;하성욱;김성호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.979-984
    • /
    • 2001
  • The Sang-Jin bridge constructed by the Free Cantilever Method in 1985 is 4-span concrete rahmen bridge with a hinge at midspan. Due to the effect of creep, shrinkage of concrete and relaxation of tendon, the Sang-Jin bridge exposed the excessive displacement at midspan with the passage of time. In order to improve the load-carrying-capacity and durability of the bridge, needs to repair and rehabilitate the structure emerged. New rehabilitation methods were applied such as external prestressing of concrete box, application of pier pre-camber and steel truss jacking. Structural analysis and several tests including static load test, dynamic load test and ambient vibration test were executed to verify the improvement. The test result showed that the displacement of the midspan was improved by 10mm and it was verified that the stiffness of the bridge was increased. Totally, the load-carrying-capacity of Sang-Jin bridge was increased at least 1.56times which was attributed to the new rehabilitation method.

  • PDF

Effects of soil-structure interaction on construction stage analysis of highway bridges

  • Ates, Sevket;Atmaca, Barbaros;Yildirim, Erdal;Demiroz, Nurcan Asci
    • Computers and Concrete
    • /
    • v.12 no.2
    • /
    • pp.169-186
    • /
    • 2013
  • The aim of this paper is to determine the effect of soil-structure interaction and time dependent material properties on behavior of concrete box-girder highway bridges. Two different finite element analyses, one stage and construction stage, have been carried out on Komurhan Bridge between Elazi$\breve{g}$ and Malatya province of Turkey, over Fırat River. The one stage analysis assume that structure was built in a second and material properties of structure not change under different loads and site conditions during time. However, construction stage analysis considers that construction time and time dependent material properties. The main and side spans of bridge are 135 m and 76 m, respectively. The bridge had been constructed in 3 years between 1983 and 1986 by balanced cantilever construction method. The parameters of soil-structure interaction (SSI), time dependent material properties and construction method are taken into consideration in the construction stage analysis while SSI is single parameter taking into consideration in the one stage analysis. The 3D finite element model of bridge is created the commercial program of SAP2000. Time dependent material properties are elasticity modulus, creep and shrinkage for concrete and relaxation for steel. Soft, medium, and firm soils are selected for evaluating SSI in both analyses. The results of two different finite element analyses are compared with each other. It is seen that both construction stage and SSI have a remarkable effect on the structural behavior of the bridge.

Construction Monitoring Methods of FCM Bridge Using Temperature Data (온도데이터를 활용한 현장타설 캔틸레버 교량의 시공 중 계측)

  • Kim, Hyun-Joong;Moon, Dae Joong;Nam, Soon Sung;Jeong, Ju Yong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.3
    • /
    • pp.219-227
    • /
    • 2016
  • In this study, we have proposed a method of monitoring of bridges under construction in view of the long-term behavior of the prestress concrete bridge of which the Free Cantilever Method is applied. As a method to confirm the ability of the long-term behavior of the concrete box girder, temperature sensors and strain gauges were installed, and the measured data was used to calculate creep coefficient. Moreover, we have measured the stress of the concrete box girder during construction which was applied with creep coefficient and compared with the changes in temperature to analyze the vertical displacement along the segment. In conclusion, monitoring of the FCM bridge during construction in consideration of the long-term behavior can be analyzed efficiently by suing temperature and displacement data without the use of laser displacement meter or laser delfectometer.

Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition (초기평형상태 구현을 위한 사장교의 폐합단계 해석)

  • Park, Yong Myung;Yun, Jae Sun;Cho, Hyun Jun;Park, Chung Gon
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.191-199
    • /
    • 2007
  • This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.

An Equivalent Model for Seismic Analysis of Structures Connected by a Sky-bridge (Sky-bridge로 연결된 구조물의 지진해석을 위한 등가모델)

  • Yang, Ah-Ram;Kim, Hyun-Su;Lee, Dong-Guen;Ah, Sang-Kyung;Oh, Jung-Keun;Moon, Yeong-Jong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.203-208
    • /
    • 2008
  • Recently, high-rise building structures connected by a sky-bridge are frequently constructed. To predict accurate dynamic responses of structures connected a sky-bridge, time history analysis is required. Repetitive analyses are required in the design process. If the entire structure model is employed in the repetitive time history analysis, it would take a lot of computational time and engineers' efforts. Therefore, an equivalent model for high-rise building structures connected by a sky-bridge was proposed in this study. The proposed model consists of cantilever having original structure's stiffnesses and masses. Based on the analytical results, it has been shown that the equivalent model can reduce the analysis time and provide similar seismic responses to the original model.

  • PDF

Assessment of traffic-induced low frequency sound radiated from a viaduct by field experiment

  • Kawatani, M.;Kim, C.W.;Nishitani, K.
    • Interaction and multiscale mechanics
    • /
    • v.3 no.4
    • /
    • pp.373-387
    • /
    • 2010
  • This study is intended to assess low frequency sound radiated from a viaduct under normal traffic. The bridge comprises steel box girders and wide cantilever decks on which vehicles pass. The low frequency sound and the acceleration response of the bridge under normal traffic are measured to investigate how bridge vibrations affect the low frequency sound observed near the bridge. Observations demonstrate that strong relationships exist between frequency characteristic of bridge's acceleration response and the sound pressure level of low frequency sound. A noteworthy point is that the dynamic feature of the sound pressure level is mostly affected by dynamic feature of the span locating near the observation point.

PID Controller Based on Sliding Mode Control for Bridge Inspection Robot (교량 탐사 로봇을 위한 Sliding Mode 제어를 기반으로 한 PID 제어기)

  • Lee, An-Yong;Lee, Seung-Chul;Oh, Je-Keun;Choi, Young-Jin;Yang, Hai-Won
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.285-286
    • /
    • 2007
  • This paper presents a robust controller in order to handle the guide rail vibrations of Bridge Inspection System. While a Bridge Inspection Robot moves on guide rails with vibration by weight occurs. Therefore, Guide rail as structure like cantilever beam appears vibration by weight of Bridge Inspection Robot. The Z axis of Bridge Inspection Robot operates with Scissors structure. Bridge Inspection Robot is used 'PID Controller based on Sliding Mode control' for position control with Z axis. At the result of, this paper is applied to simulation about position control regarding vibration to occur with Z axis.

  • PDF

Moment Control of Pier in Concrete Bridges Constructed by Free Cantilever Method (FCM 공법으로 시공되는 콘크리트 교량의 교각 모멘트 제어)

  • Yang, In-Hwan
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.6 s.96
    • /
    • pp.711-720
    • /
    • 2006
  • The structural behavior of concrete girder in bridges constructed by free cantilever method is time-dependent due to creep and shrinkage of concrete. The constraint effects of longitudinal movement of concrete girders can introduce unfavourable moment into piers. This study is aimed at proposing a method to reduce the moment of piers in bridge constructed by free cantilever method. The method are systematically composed of time-dependent structural analysis of bridges and loading of control force during construction of bridge. Numerical analyses are carried out depending on the parameters such as amount of control force and flexibility of pier. Time-dependent structural behavior shows that moment of pier increases according as pier height decreases. Also, moment of pier decreases when control method are applied. Numerical result of the study represents that time-dependent moment of piers can be controlled effectively by employing the proposed method.

Stress Measurement of films using surface micromachined test structures (표면 미세 가공된 구조체를 이용한 박막의 응력 측정)

  • 이창승;정회환;노광수;이종현;유형준
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.11a
    • /
    • pp.721-725
    • /
    • 1996
  • The microfabricated test structures were used in order to evaluate the stress characteristics in films. The test structures were fabricated using surface micromachining technique, including HF vapor phase etching as an effective release method. The fabricated structures were micro strain gauge, cantilever-type vernier gauge and bridge for stress measurement, and cantilever for stress gradient measurement. The strain was measures by observing the deformation of the structures occurred after release etching and the amount of deformation can be detected by micro vernier gauge, which has gauge resolution of 0.2${\mu}{\textrm}{m}$. The detection principles and the degree of precision for the measured strain were also discussed. The characteristics of residual stress in LPCVD polysilicon films were studied using these test structures. The stress gradient due to the stress variation through the film thickness was calculated by measuring the deflection at the cantilever free end.

  • PDF