• Title/Summary/Keyword: Cannon Tube Erosion

Search Result 3, Processing Time 0.022 seconds

Derivation of Fitting Approximate Formula to Enhance the Accuracy of Cannon Tube Erosion Rate (포신 마모 예측의 정확도 향상을 위한 적합 근사식 유도(I))

  • Chung, Dong-Yoon;Oh, Myoung-Ho
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2002.05a
    • /
    • pp.80-87
    • /
    • 2002
  • We predict the unknown cannon tube erosion rate by using observed values of the standard cannon, 155mm Howitzer Ml85. We know the standard cannon's ten erosion observation values each 400 rounds. An approximate formula fitting the erosion values of the standard cannon has been derived. Numerical simulation applying this formula to the Rauf Imam's erosion equations is presented.

  • PDF

Derivation of Empirical Method to Enhance the Accuracy of Cannon Tube Erosion Rate (포신 마모 예측의 정확도 향상을 위한 실험적 방법 유도)

  • 정동윤;오명호
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.5 no.3
    • /
    • pp.23-32
    • /
    • 2002
  • We predict the erosion rate of unknown cannon tubes by substituting measured values of the standard cannon, 155㎜ Howitzer M185 and ballistic data for the erosion equation. We know ten measured erosion values of the standard cannon at every 400 rounds. An approximate formula is derived to interpolate six values up to 2,000 rounds. Numerical example is presented and its results are analyzed. The new erosion equation is also suggested. This equation produces more accurate cannon tube erosion rate than the Rauf Imam's empirical approaches. Computer simulations are presented.

New Empirical Approach to Enhance The Accuracy of Cannon Tube Erosion Rate

  • Chung, Dong-Yoon;Oh, Myoung-Ho
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2002.10b
    • /
    • pp.231-232
    • /
    • 2002
  • Various methods that utilize erosion rate measurement of standard cannon, 155mm Howitzer M185, as reference, are being used to calculate erosion rate of an interested unknown cannon tubes. We know ten measured erosion values of the standard cannon from 391 rounds to 4.000. An approximate function fitting these value s is derived. The new erosion equation is also suggested and computer simulations arc presented.

  • PDF