• Title/Summary/Keyword: CMF(CM for Fee)

Search Result 2, Processing Time 0.014 seconds

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF