A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

Probabilistic GMP Calculation Method based on BIM (BIM기반 확률론적 GMP 산정방안에 관한 연구)

  • Go, Gun-Ho;Jin, Zheng-Xun;Kim, Hyun-Joo;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

BIM based Design Optimization and Constructability Improvement for Adoption of Pre-construction Service. (프리컨스트럭션 서비스 도입을 위한 BIM 기반 설계 최적화 및 시공성 검토)

  • Lee, Chang-Hee;Lee, Jeong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.187-188
    • /
    • 2017
  • Korean government is trying to adopt 'CM at Risk(CMR)' method to solve some problems of traditional project delivery method such as cost increase, delay, low quality. Pre-construction service(PCS) is a project management methodology of CMR and BIM is the best tool for efficient PCS execution. PCS is consisted of several main items such as Target costing, Cost trending, GMP, Design optimization, Constructability review and Productivity. The purpose of this research is to analyse contractor's PCS application case result and to find improvement items.

  • PDF

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Effects of Remote Ischemic Pre-Conditioning to Prevent Contrast-Induced Nephropathy after Intravenous Contrast Medium Injection: A Randomized Controlled Trial

  • Dihia Belabbas;Caroline Koch;Segolene Chaudru;Mathieu Lederlin;Bruno Laviolle;Estelle Le Pabic;Dominique Boulmier;Jean-Francois Heautot;Guillaume Mahe
    • Korean Journal of Radiology
    • /
    • v.21 no.11
    • /
    • pp.1230-1238
    • /
    • 2020
  • Objective: We aimed to assess the effects of remote ischemic pre-conditioning (RIPC) on the incidence of contrast-induced nephropathy (CIN) after an intravenous (IV) or intra-arterial injection of contrast medium (CM) in patient and control groups. Materials and Methods: This prospective, randomized, single-blinded, controlled trial included 26 patients who were hospitalized for the evaluation of the feasibility of transcatheter aortic valve implantation and underwent investigations including contrast-enhanced computed tomography (CT), with Mehran risk scores greater than or equal to six. All the patients underwent four cycles of five minute-blood pressure cuff inflation followed by five minutes of total deflation. In the RIPC group (n = 13), the cuff was inflated to 50 mm Hg above the patient's systolic blood pressure (SBP); in the control group (n = 13), it was inflated to 10 mm Hg below the patient's SBP. The primary endpoint was the occurrence of CIN. Additionally, variation in the serum levels of cystatin C was assessed. Results: One case of CIN was observed in the control group, whereas no cases were detected in the RIPC group (p = 0.48, analysis of 25 patients). Mean creatinine values at the baseline, 24 hours after injection of CM, and 48 hours after injection of CM were 88 ± 32 μmol/L, 91 ± 28 μmol/L and 82 ± 29 μmol/L, respectively (p = 0.73) in the RIPC group, whereas in the control group, they were 100 ± 36 μmol/L, 110 ± 36 μmol/L, and 105 ± 34 μmol/L, respectively (p = 0.78). Cystatin C values (median [Q1, Q3]) at the baseline, 24 hours after injection of CM, and 48 hours after injection of CM were 1.10 [1.08, 1.18] mg/L, 1.17 [0.97, 1.35] mg/L, and 1.12 [0.99, 1.24] mg/L, respectively (p = 0.88) in the RIPC group, whereas they were 1.11 [0.97, 1.28] mg/L, 1.13 [1.08, 1.25] mg/L, and 1.16 [1.03, 1.31] mg/L, respectively (p = 0.93), in the control group. Conclusion: The risk of CIN after an IV injection of CM is very low in patients with Mehran risk score greater than or equal to six and even in the patients who are unable to receive preventive hyperhydration. Hence, the Mehran risk score may not be an appropriate method for the estimation of the risk of CIN after IV CM injection.

Estimation of Extreme Tide for Risk Analysis of Marine Salvage in the Namhae (southern sea of Korea) (한국 남해의 구난환경 위험성 분석을 위한 극치 조석 산정)

  • Lee Moon-Jin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.12 no.1 s.24
    • /
    • pp.33-38
    • /
    • 2006
  • In marine salvage, extreme tide heights and tidal currents are necessary to anchor an accidental ship. In order to meet this requirement, a simple scheme was developed which yields the spatial informations on the extreme tide from the distribution of approximate highest astronomical tide heights using a relationship between extreme and highest astronomical tides at the standard port. This method is the inference method based on horizontally homogeneity of tide. This scheme was applied to estimate extreme tide heights and tidal currents in the Namhae (southern sea of Korea). The highest astronomical tide heights are computed by amplitude of four major constituents (M2, S2, K1, O1 tide). The estimated extreme tide heights are ranged from 70 to 260 cm for return period 50 years and from 80 to 270cm for return period 100 years, respectively. For return period 100 years, extreme tidal currents show value of 1.55 times as strong as those of normal state.

  • PDF

A Study on Fusion Welding Strength of PE pipe (PE배관의 융착 강도에 관한 연구)

  • Jun, Hung-Won;Kim, Yong-Soo;Tae, Soon-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.2
    • /
    • pp.16-21
    • /
    • 2002
  • At present the Polyethylene piping, on supporting LNG is widely used because of it's disposition which are anti-corrosion flexible and so on. However, it has a few kinds of risk which are the possibility of piping leak, the character of easily corroded and so on. For giving solution, this study is intended to experiment the intension of the PE pipe after melted and when it is melting, the condition which are temperature and pressure is changed. the melting condition in temperature and pressure is adapted identically. After melting, it's joint is tested as intension. The result is that the effect of temperature in intension is more effective than pressure. In $210^{\circ}C$, $20kg/cm^{2}$ condition, the melting intension has the highest. Compare to the Butt melting joint and the Saddle melting joint, the former was $214kg/cm^{2}$ and the latter was $50kg/cm^{2}(bead\;2{\sim}3mm)$ and $73kg/cm^{2}(bead\;5{\sim}7mm)$. It means that the Butt melting method has more intensive than saddle. Consequently, the result shows that the liability and safety when pipe melting method is used will improve in pipe installation.

Development of a Method for Improving the Electric Field Distribution in Patients Undergoing Tumor-Treating Fields Therapy

  • Sung, Jiwon;Seo, Jaehyeon;Jo, Yunhui;Yoon, Myonggeun;Hwang, Sang-Gu;Kim, Eun Ho
    • Journal of the Korean Physical Society
    • /
    • v.73 no.10
    • /
    • pp.1577-1583
    • /
    • 2018
  • Tumor-treating fields therapy involves placing pads onto the patient's skin to create a low- intensity (1 - 3 V/cm), intermediate frequency (100 - 300 kHz), alternating electric field to treat cancerous tumors. This new treatment modality has been approved by the Food and Drug Administration in the USA to treat patients with both newly diagnosed and recurrent glioblastoma. To deliver the prescribed electric field intensity to the tumor while minimizing exposure of organs at risk, we developed an optimization method for the electric field distribution in the body and compared the electric field distribution in the body before and after application of this optimization algorithm. To determine the electric field distribution in the body before optimization, we applied the same electric potential to all pairs of electric pads located on opposite sides of models. We subsequently adjusted the intensity of the electric field to each pair of pads to optimize the electric field distribution in the body, resulting in the prescribed electric field intensity to the tumor while minimizing electric fields at organs at risk. A comparison of the electric field distribution within the body before and after optimization showed that application of the optimization algorithm delivered a therapeutically effective electric field to the tumor while minimizing the average and the maximum field strength applied to organs at risk. Use of this optimization algorithm when planning tumor-treating fields therapy should maintain or increase the intensity of the electric field applied to the tumor while minimizing the intensity of the electric field applied to organs at risk. This would enhance the effectiveness of tumor-treating fields therapy while reducing dangerous side effects.

The Effects of Chronic Ankle Instability on Postural Control during Forward Jump Landing (전방 점프 착지 시 만성 발목 불안정성이 자세 조절에 미치는 영향)

  • Kim, Kew-wan;Jeon, Kyoungkyu;Park, Seokwoo;Ahn, Seji
    • Korean Journal of Applied Biomechanics
    • /
    • v.32 no.1
    • /
    • pp.9-16
    • /
    • 2022
  • Objective: The purpose of this study was to investigate how the chronic ankle instability affects postural control during forward jump landing. Method: 20 women with chronic ankle instability (age: 21.7 ± 1.6 yrs, height: 162.1 ± 3.7 cm, weight: 52.2 ± 5.8 kg) and 20 healthy adult women (age: 21.8 ± 1.6 yrs, height: 161.9 ± 4.4 cm, weight: 52.9 ± 7.2 kg) participated in this study. For the forward jump participants were instructed to stand on two legs at a distance of 40% of their body height from the center of force plate. Participants were jump forward over a 15 cm hurdle to the force plate and land on their non-dominant or affected leg. Kinetic and kinematic data were obtained using 8 motion capture cameras and 1 force plates and joint angle, vertical ground reaction force and center of pressure. All statistical analyses were using SPSS 25.0 program. The differences in variables between the two groups were compared through an independent sample t-test, and the significance level was to p < .05. Results: In the hip and knee joint angle, the CAI group showed a smaller flexion angle than the control group, and the knee joint valgus angle was significantly larger. In the case of ankle joint, the CAI group showed a large inversion angle at all events. In the kinetic variables, the vGRF was significantly greater in the CAI group than control group at IC and mGRF. In COP Y, the CAI group showed a lateral shifted center of pressure. Conclusion: Our results indicated that chronic ankle instability decreases the flexion angle of the hip and knee joint, increases the valgus angle of the knee joint, and increases the inversion angle of the ankle joint during landing. In addition, an increase in the maximum vertical ground reaction force and a lateral shifted center of pressure were observed. This suggests that chronic ankle instability increases the risk of non-contact knee injury as well as the risk of lateral ankle sprain during forward jump landing.