• Title/Summary/Keyword: CASH FLOW FORECASTING

Search Result 21, Processing Time 0.024 seconds

CASH FLOW FORECASTING IN CONSTRUCTION PROJECT (건설공사에서의 현금흐름 예측)

  • Park Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.35-41
    • /
    • 2002
  • This research introduces the development of a project-level cash flow forecasting model in construction stage based on the planned earned value and the cost from a general contractors view on a jobsite. Most previous models have been developed to assist contractors in their pre-tendering or planning stage cash flow forecasts. The critical key to cash flow forecasting at the project level is how to build a cash-out model. The basic concept is to use moving weights of cost categories in a budget over project duration. The cost categories are classified to compile resources with almost the same time lags that are based on contracting payment conditions and credit times given by suppliers or venders. For cash-in, net planned monthly-earned values are simply transferred to the cash-in forecast, to be applied there with billing time and retention money. Validation of the model involves applying data from on-going 4 projects in progress for 12 months. Based on the results of the comparative analyses through the simulation of the proposed model and the existing models, the proposed model is more accurate, flexible and simpler than traditional models to the employee of construction jobsite who is not oriented financial knowledge.

  • PDF

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

A Case Study of Implementation for Cash Flow Forecasting System in a Construction Company (건설회사 현금흐름예측시스템 구축방법에 대한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.391-397
    • /
    • 2009
  • This research introduces the implementation for cash flow forecasting system in construction company through a case study. The implemented system shows how to develop overall corporate-level and project-level cash flow forecasting model based on a real business process in construction company. It takes 1 year to implement system. The study proposes the way of system design, process of system design, and considerations of implementation in step by step. Moreover, it shows main screen, limitation and reliability of the system. The proposed model is validated accurate, flexible and simple as a result of comparing actual data to forecasting data for 2 years. This system is easy to approach the employee who don't have any financial knowledge. This research is expected to assist to implement system of cash flow forecasting in construction company.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

The Theoretical Features of Budgeting in the Corporation

  • VYBOROVA, Elena Nikolaevna
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.1
    • /
    • pp.25-40
    • /
    • 2021
  • Purpose: The forecasting is the likelihood scientifically proved judgment about the prospects, the possible conditions of this or that phenomenon in the future and (or) about the alternative ways and the means of their realization. To adapt the instruments of budgeting for the analysis cash flow of company. Research design, data and methodology: The creates the budget of cash flow were carried out on the basis of data of the report for the 2017 of corporations POSCO and in the first half of the 2018 Daewoo Shipbuilding & Marine Engineering of South Korea. Results: The simultaneous use of budgeting techniques and the simple financial analysis allows to systematize the transactions, to identify the main problem areas in the movement cash flows. Therefore, working capital analysis is to determine the limits of their fluctuations in view of the changes in the business processes. Conclusions: In the pedagogical context solved the features of budgeting in the part evaluation current assets, its financing, its elements: the cash, the debtor. In the process of budgeting of cash flow, in credit budget, in financial budget we can see the main indicators: the current assets, the functioning capital, the optimum number of debtors, the optimum amount of cash and another.

The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait

  • AL-NASSAFI, Nawaf Marzouq
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.3
    • /
    • pp.53-63
    • /
    • 2022
  • Despite the relationship between cash flow, financial management, and project performance, no study examined the mediating role of financial management on the relationship between cash flow and construction project performance, especially in Kuwait. The goal of this study was to examine the impact of cash flow fluctuations on construction project performance, as well as the role of financial management in mediating this relationship. To accomplish these goals, the researcher employed a descriptive-analytical method to create a questionnaire of 31 items. The study's sample was chosen at random and includes (181) project managers and firm owners from contractors' companies in Kuwait. The study found a statistically positive and significant effect of cash flow variation on project performance from the perspective of Kuwaiti contractors at the significance level (0.05), as well as a mediated role of financial management in the relationship between cash flow variation and project performance. The research came up with a number of recommendations based on the findings, including the need for contractors to have a better understanding of cash flow to arrange project activities correctly and efficiently. Further studies may be included into the effect of cash flow forecasting (planning) and financial management (control) on various construction activities.

Cash flow Forecasting in Construction Industry Using Soft Computing Approach

  • Kumar, V.S.S.;Venugopal, M.;Vikram, B.
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.502-506
    • /
    • 2013
  • The cash flow forecasting is normally done by contractors in construction industry at early stages of the project for contractual decisions. The decision making in such situations involve uncertainty about future cash flows and assessment of working capital requirements gains more importance in projects constrained by cash. The traditional approach to assess the working capital requirements is deterministic in and neglects the uncertainty. This paper presents an alternate approach to assessment of working capital requirements for contractor based on fuzzy set theory by considering the uncertainty and ambiguity involved at payment periods. Statistical methods are used to deal with the uncertainty for working capital curves. Membership functions of the fuzzy sets are developed based on these statistical measures. Advantage of fuzzy peak working capital requirements is demonstrated using peak working capital requirements curves. Fuzzy peak working capital requirements curves are compared with deterministic curves and the results are analyzed. Fuzzy weighted average methodology is proposed for the assessment of peak working capital requirements.

  • PDF

Analysis of Accounts Receivable Aging Using Variable Order Markov Model (가변 마코프 모델을 활용한 매출 채권 연령 분석)

  • Kang, Yuncheol;Kang, Minji;Chung, Kwanghun
    • The Journal of Society for e-Business Studies
    • /
    • v.24 no.1
    • /
    • pp.91-103
    • /
    • 2019
  • An accurate prediction on near-future cash flows plays an important role for a company to attenuate the shortage risk of cash flow by preparing a plan for future investment in advance. Unfortunately, there exists a high level of uncertainty in the types of transactions that occur in the form of receivables in inter-company transactions, unlike other types of transactions, thereby making the prediction of cash flows difficult. In this study, we analyze the trend of cash flow related to account receivables that may arise between firms, by using a stochastic approach. In particular, we utilize Variable Order Markov (VOM) model to predict how future cash flows will change based on cash flow history. As a result of this study, we show that the average accuracy of the VOM model increases about 12.5% or more compared with that of other existing techniques.

A Study on the Development of the Cash-Flow Forecasting Model in Apartment Business factoring tn Housing Payment Collection Pattern and Payment Condition for Construction Expences (분양대금 납부패턴과 공사대금 지급방식 변화를 고려한 공동주택사업의 현금흐름 예측모델 개발에 관한 연구)

  • Kim Soon-Young;Kim Kyoon-Tai;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.353-358
    • /
    • 2001
  • Since the financial crisis broke out, liquidity has become the critical issue in housing construction industry. In order to secure liquidity, it is prerequisite to precisely forecast cash flow. However, construction companies have failed to come up with a systematic process to manage and forecast cash flow. Until now, companies have solely relied on the prediction of profits and losses, which is carried out as they review business feasibility. To obtain more accurate cash flow forecast model, practical pattern of payments should be taken into account. In this theory, basic model that analyzes practical housing payment collection pattern resulting from prepayments and arrears is described. This model is to complement conventional cash flow forecast scheme in the phase of business feasibility review. Analysis result on final losses in cash that occur as a result of prepayment and arrears is considered in this model. Additionally, in the estimation of construction cost in the phase of business feasibility review, real construction prices instead of official prices are applied to enhance accuracy of cash outflow forecast. The proportion of payment made by a bill and changes in payment date caused by rescheduling of a bill are also factored in to estimate cash outflow. This model would contribute to achieving accurate cash flow forecast that better reflect real situation and to enhancing efficiency in capital management by giving a clear picture with regard to the demand and supply timing of capital.

  • PDF

MODELING ACCURATE INTEREST IN CASH FLOWS OF CONSTRUCTION PROJECTS TOWARD IMPROVED FORECASTING OF COST OF CAPITAL

  • Gunnar Lucko;Richard C. Thompson, Jr.
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.467-474
    • /
    • 2013
  • Construction contactors must continuously seek to improve their cash flows, which reside at the heart of their financial success. They require careful planning, analysis, and optimization to avoid the risk of bankruptcy, remain profitable, and secure long-term growth. Sources of cash include bank loans and retained earnings, which are conceptually similar in that they both incur a cost of capital. Financial management therefore requires accurate yet customizable modeling capabilities that can quantify all expenses, including said cost of capital. However, currently existing cash flow models in construction engineering and management have strongly simplified the manner in which interest is assessed, which may even lead to overstating it at a disadvantage to contractors. The variable nature of cash balances, especially in the early phases of construction projects, contribute to this challenging issue. This research therefore extends a new cash flow model with an accurate interest calculation. It utilizes singularity functions, so called because of their ability to flexibly model changes across any number of different ranges. The interest function is continuous for activity costs of any duration and allows the realistic case that activities may begin between integer time periods, which are often calendar months. Such fractional interest calculation has hitherto been lacking from the literature. It also provides insights into the self-referential behavior of compound interest for variable cash balances. The contribution of this study is twofold; augmenting the corpus of financial analysis theory with a new interest formula, whose strengths include its generic nature and that it can be evaluated at any fractional value of time, and providing construction managers with a tool to help improve and fine-tune the financial performance of their projects.

  • PDF