In this paper, a voltage sag is analyzed in case of superconducting fault current limiter (SFCL) installed in power distribution system where replaces the main power transformer to large one to meet the power demand. First, the power system is configurated to analyze the operation characteristics of the protective relay with replacement of the main transformer and application of the SFCL. Next, the method to meet the protection coordination is analyzed with large transformer using PSCAD/EMTDC. Finally, the bus voltage is investigated according to the impedance of both main transformer and SFCL in case that the SFCL is applied into feeder.
Design & Operation of power system for meeting increase of electric power demand is becoming more difficult and complex. One of reasons is increase of fault current. As one of the most effective methods for suppressing the fault current, installation of SFCL is expected. This paper describes a method of fault analyses of power system with SFCLs, and also discusses determination of specification of SFCLs, effects of limiting the fault current due to SFCLs by use of the model system of two - bus electric power system with parallel circuit model transmission line. Also, describes the definition of six specific parameters of SFCL for power system application & a proposal of design method of specific parameter of a resistance type SFCL in overhead transmission lines considering operation of protective relays.
This paper presents the adaptive setting method of distance relay under the single line ground fault. The apparent impedance measured at the relaying point and actual impedance is different because of fault resistance and various prefault loading condition. For a resistance earth fault detection, relay setting zone is adaptively changed with measured load current and bus voltage at the relaying point to avoid maloperation.
The harmonics in railway high voltage system is due to common use of 3 phase incoming bus and doing the power converter for traction system on the electric car(or electric locomotive). This paper, we analyze the harmonics mechanism and characteristics of railway high voltage system, also we analyze the problem according to the actual measurement about influence of harmonicsontherailwayhighvoltagesystem. And we proved the countermeasure device(passive filter or L-C filter) of harmonics applies in the field. The test result, we have know that the filter is not fit. Consequently, The countermeasure of harmonics for the railway high voltage system be able to resolve by another filter.
This paper proposes the discrimination method for the fault location, whether it is within the line where the distributed generation(DG) is integrated or out of the line (but sharing the same bus of the substation). In general, DG has to be disconnected from the grid when the fault occurs on the interconnected distribution feeder as soon as possible. However, the faults occured on the neighboring feeder would mistakenly cause the disconnection of the DG. For reliable operation of DG, DG should be sustained at the fault occurred on neighboring distribution feeders. The proposed identification method utilizes the impedance monitored from the DG and examines the coordination of overcurrent relay of the distribution system. This paper describes how the proposed method to identify the faulted feeder and how the method can be utilized.
In the power plant using high temperature fuel cells such as Molten Carbonate Fuel Cell(MCFC), and Solid Oxide Fuel Cell(SOFC), the generated electric power per area of power generation facilities is much higher than any other renewable energy sources. - High temperature fuel cell systems are capable of operating at MW rated power output. - It also has a feature that is short for length of the line for connecting the interior of the generation facilities. In normal condition, these points are advantages for voltage drops or power losses. However, in abnormal condition such as fault occurrence in electrical system, the fault currents are increased, because of the small impedance of the short length of power cable. Commonly, to minimize the thermal-mechanical stresses on the stack and increase the systems reliability, we divided the power plant configuration to several banks for parallel operation. However, when a fault occurs in the parallel operation system of power main transformer, the fault currents might exceed the interruption capacity of protective devices. In fact, although the internal voltage level of the fuel cell power plant is the voltage level of distribution systems, we should install the circuit breakers for transmission systems due to fault current. To resolve these problems, the SFCL has been studied as one of the noticeable devices. Therefore, we analyzed the effect of application of the SFCL on bus tie in a fuel cell power plants system using PSCAD/EMTDC.
통신해양기상위성의 전력계는 향상된 Eurostar 3000 버전에 바탕을 두고 있다. Eurostar 3000 전력계는 정상상태 또는 하나의 결함에서도 자율적으로 동작하며 높은 수준의 재구성 능력 및 유연성을 제공한다. 본 논문에서는 통신해양기상위성 전력계 예비설계 결과를 소개한다. 통신해양기상위성 전력계는 하나의 배터리, 태양전지어레이 윙, 전력공급기, 파이로 유닛 및 태양전지어레이 구동기 그리고 릴레이 및 퓨즈 브래킷 들로 구성된다. 통신해양기상위성 전력계는 3 kW의 버스 전력을 제공할 수 있다. 태양전지어레이는 2개의 태양전지판으로 구성된 전개할 수 있는 윙으로 구성된다. 태양전지는 GaAs/Ge 3중 접합 셀로 선정되었다. Li-ion 배터리는 10개의 직렬 연결된 셀 모듈로 구성되며 각 모듈은 셀 5개가 병렬로 연결된다. 전력공급기는 태양전지어레이 및 배터리와 함께 50 V로 완전 정류된 하나의 전력 버스를 생성한다. 전력 버스는 릴레이 및 퓨즈 브래킷 들에 의해 중앙 집중되어 보호되고 분배된다. 파이로 유닛은 점화 작동기 장치로 전력을 공급한다. 태양전지어레이는 자세제어계의 제어로 태양전지어레이 구동기에 의해 회전된다. 전력계의 제어 및 감시는, 특히 배터리, 전력공급기와 탑재 소프트웨어의 결합으로 수행된다.
Jang Sung-Il;Kim Kwang-Ho;Park Yong-Up;Choi Jung-Hwan;Kang Yong-Cheol;Kang Sang-Hee;Lee Seung-Jae;Oshida Hideharu;Park Jong-Keun
KIEE International Transactions on Power Engineering
/
제5A권4호
/
pp.357-365
/
2005
This research investigates the influences of distributed generations (DG), which are interconnected to the bus by the dedicated lines, on the overcurrent relays (OCR) of the neighboring distribution feeders and also proposes a novel method to reduce the negative effects on the feeder protection. Due to the grid connected DG, the entire short-circuit capacity of the distribution networks increases, which may raise the current of the distribution feeder during normal operations as well as fault conditions. In particular, during the switching period for loop operation, the current level of the distribution feeder can be larger than the pickup value for the fault of the feeder's OCR, thereby causing the OCR to perform a mal-operation. This paper proposes the adaptive setting algorithm for the OCR of the distribution feeders having the neighboring dedicated feeders for the DG to prevent the mal-operations of the OCR under normal conditions. The proposed method changes the pickup value of the OCR by adapting the power output of the DG monitored at the relaying point in the distribution network. We tested the proposed method with the actual distribution network model of the Hoenggye substation at the Korea Electric Power Co., which is composed of five feeders supplying the power to network loads and two dedicated feeders for the wind turbine generators. The simulation results demonstrate that the proposed adaptive protection method could enhance the conventional OCR of the distribution feeders with the neighboring dedicated lines for the DG.
Journal of Information Science Theory and Practice
/
제10권spc호
/
pp.56-65
/
2022
Korea Institute of Science and Technology Information (KISTI) is a Worldwide LHC Computing Grid (WLCG) Tier-1 center mandated to preserve raw data produced from A Large Ion Collider Experiment (ALICE) experiment using the world's largest particle accelerator, the Large Hadron Collider (LHC) at European Organization for Nuclear Research (CERN). Physical medium used widely for long-term data preservation is tape, thanks to its reliability and least price per capacity compared to other media such as optical disk, hard disk, and solid-state disk. However, decreasing numbers of manufacturers for both tape drives and cartridges, and patent disputes among them escalated risk of market. As alternative to tape-based data preservation strategy, we proposed disk-only erasure-coded archival storage system, Custodial Disk Storage (CDS), powered by Exascale Open Storage (EOS), an open-source storage management software developed by CERN. CDS system consists of 18 high density Just-Bunch-Of-Disks (JBOD) enclosures attached to 9 servers through 12 Gbps Serial Attached SCSI (SAS) Host Bus Adapter (HBA) interfaces via multiple paths for redundancy and multiplexing. For data protection, we introduced Reed-Solomon (RS) (16, 4) Erasure Coding (EC) layout, where the number of data and parity blocks are 12 and 4 respectively, which gives the annual data loss probability equivalent to 5×10-14. In this paper, we discuss CDS system design based on JBOD products, performance limitations, and data protection strategy accommodating EOS EC implementation. We present CDS operations for ALICE experiment and long-term power consumption measurement.
코로나19 팬데믹에 따른 경제사회 환경 변화와 빅데이터 기술의 발달로 교통분석에 대한 요구가 다양화되고 있다. 특히 데이터 3법 개정에 따라 이종 데이터 간 가명정보 결합이 가능해져 다각적인 분석이 가능해졌다. 그러나 개인정보보호 강화로 모빌리티 빅데이터의 결합분석에는 데이터 협력, 비용대비 효과 등에 한계가 있어 새로운 분석방법론이 필요하다. 본 연구에서 제시하는 "모빌리티 빅데이터 가상결합 방법론"은 법제상의 제약 해소 및 다각적인 교통분석을 위한 것으로, 모바일 통신 기지국 데이터, 교통카드 데이터 등 다양한 모빌리티 관련 빅데이터를 간접적으로 결합하여 상세 분석을 수행하기 위한 방법론이다. 가상결합은 모바일 데이터를 바탕으로 특정 인원의 시간대별 위치를 파악할 수 있는 MCGM(Mobility Comprehensive Genetic Map)을 생성하여 패턴을 분석하고, 이를 교통카드데이터 등 교통관련 빅데이터와 결합시켜 분석하는 방법론으로 본 연구에서는 청주, 수도권 대상으로 가상결합 분석을 수행하여 활용가능성을 검증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.