This paper again to present position of a bus that is running in bus government organization small grasp and Can instruct control about the vehicles progress speed in government organization small to bus driver. Therefore, Inform a bus that own wants to ordinary people who carry transfer communication terminal is situated to where present, ad Do by purpose that offer system that inform running information of a bus to ARS and FAX, internet and ordinary people through PC communication. Also, Intelligence style bus control system that see also includes function that do as can guide arrival expectation depot automatically without driver's manufacturing when run a bus.
본 연구는 고용량의 모터를 구동하기 위한 모터컨트롤센터(MCC)의 내부 구조 중 각 상(R,S,T)의 BUS BAR의 온도와 BUS BAR 볼트 체결부의 온도변화가 모터컨트롤센터의 노후화 및 진동에 따라 어떠한 차이가 있는지를 적외선 온도센서가 설치된 온도측정용 2차원 기구부를 설계 제작하고 모터컨트롤센터의 내부에 설치하여 BUS BAR의 온도 및 전류 변화량을 상시 모니터링 하였다. 실험을 통하여 부하에 따른 BUS BAR의 온도 변화를 BUS BAR 나사 체결부위를 중심으로 측정하였으며, BUS BAR의 온도변화와 소모 전류에 대한 비례관계를 확인할 수 있었다. 또한 이러한 비접촉식 2차원 온도측정 시스템을 모터컨트롤센터 내부에 장착하면 부하의 과전류로 인한 온도 상승이나 접촉 불량 등으로 발생될 수 있는 정전이나 화재 사고를 예방할 수 있을 것으로 기대된다.
The bus should supply an equal service to the whole community as feeder trip. However the existing bus route can not supply an effective feeder service in spite of the changes in the latent demand by the variety of regional structural change. This study aimed to establish the concept which frames the bus operation and management to cope with the latent demand to the bus. This study tackled this evidence by analyzing the transportation problems in terms of the urban growth emphasizing the following issues ; First, the strategy to improve the bus operation Second the land use control appropriate for the public transportation network Third economical range to justify the bus operation Second, the land use control appropriate for the public transportation network Third, economical range to justify the bus operation Fourth, the allowance for the private transportation mode On the latter part, the difference on the bus operation was compared to determine the range within which the bus operation could be justified. This study would provide some implications to improve the management for bus operation and fundamental information to develop the bus operation system.
This paper presents the application of a FARMA controller to stabilization of nonlinear Two-Generator Five-Bus power Systems. The control rules and the membership functions of the FARMA controller are generated automatically without using any plant model high complexity and severe nonlinearity of power systems are introduced and two-Machine Five -Bus Power system stabilization problem is formulated. The simulation results demonstrate the effectiveness and application possibility of the FARMA controller to the control problem of high order and nonlinear plants.
A Voltage Bus Conditioner (VBC) is used to mitigate the voltage transients on a common power distribution bus. The VBC described here utilises inductive storage and unlike its counter part with capacitive storage, it can employ the entire stored energy towards transients' mitigation. The performances of adaptive duty ratio control and sliding mode control have been compared. The simulation results (with the package SABER) indicate that the sliding mode control results in the shortest and the smallest bus voltage excursions.
Stabilization of the DC bus voltage is an important task in DC-AC microgrid system with renewable energy source such as solar system. A battery energy storage system (BESS) has become a general solution to stabilize the DC-bus voltage in DC-AC microgrid. This paper develops the analog BESS controller which requires neither computation nor dc-bus voltage measurement, so that the system can be implemented simply and easily. Even though others methods can stabilize and control the DC-bus voltage, it has complicated structure in control and low adaptive capability. The proposed topology is simple but is able to compensate the solar source variation and stabilize the DC-bus voltage under any loads and distributed generation (DG) conditions. In addition, the design of analog controller is presented to obtain a robust system. In order to verify the effectiveness of the proposed control strategy, simulation is carried out by using PSIM software.
This paper presents Power Control and Distribution Unit development of GEO satellite with 3kW power output. The sensing error of bus voltage produce control signal of the shunt switch assembly and battery power converter, and the tolerance of error signals generated decide the stability of proposed system. The dynamic characteristics of main bus according to the load changing and the control logic of FPGA are simulated. In order to verify the proposed design, the simulation and experimental results for solar array shunt switch, battery power converter and bus controller are shown.
A DC power system has many loads with varied functions. Also, there may be large pulsed loads with short duty ratios which can affect the normal operation of other loads. In this paper, Voltage Bus Conditioner(VBC) without any current sensors is proposed to damp the bus voltage transients by parallel pulsed loads. The proposed control approach requires only one voltage sensor and carries out both the functions of damping the bus voltage transients and maintaining the level of energy stored. The proposed control technique has been implemented on a TMS320F2812 Digital Signal Processor(DSP). Simulated results by a Matlab Simulink and experimental results are presented which verify the control principles and demonstrate the practicalty of the approach.
This paper proposes a structure of the control system for the step & scan exposure tool. The step & scan exposure tool is used for the manufacturing process of the semiconductor DRAM memory of giga bit. The control system employs the VME bus instead of the conventional ISA bus so that all control signals and data can be managed separately by the 4 VME-PCs for fast and fault-free flow of signals for multi-tasking. A high speed I/O card is equipped for the real-time monitoring and control of the sub module equipment. Then all the subsystems are integrated and aligned for the operation of the step & scan exposure tool with the VME bus and, I/O card.
This paper describes the configuration of serial interconnection BUS, BitBUS, for Energy Management Systems, and it provides low cost, high performance approach in distributed data acquisition and control applications.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.