• Title/Summary/Keyword: Built-up

Search Result 1,830, Processing Time 0.025 seconds

A study on automatic data conversion from electronic drawings to make feature database for GIS system (CAD도면과 GIS구조화 자동변환 방안에 관한연구)

  • Park, Dong-Heui;Kim, Young-Guk;Kang, Yu-Shin;Oh, Ju-Hwan;Choo, Jun-Sup
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2121-2124
    • /
    • 2008
  • The total length of Korean railway network is about 3,300km. Since it is of great scale in system view point, the systemization of GIS-based information system requires so much cost and time. One of the difficulties is due to the fact that GIS-based information system requires the feature database for GIS, which is generally built manually from many as-built drawing files. In order to build-up the feature database for GIS with ease, this study suggests the automatic data conversion from electronic drawings to make feature database for GIS. The proposed method can be applied to build large-scale railway facility management system at lower cost.

  • PDF

남원(南原) 소재 명장 유정(劉綎) 유적과 작품 고찰

  • Park, Hyeon-Gyu
    • 중국학논총
    • /
    • no.68
    • /
    • pp.235-251
    • /
    • 2020
  • This study collected and intensively analyzed the works and remains in Namwon(南原) province by Liu Ting(劉綎) of Ming Dynasty during the Imjin War (the Japanese invasion in 1592-1598; 壬辰倭亂). Liu Ting engraved characters on the rocks as passing by the Yeowon hill(女院峙) twice. A local official of Namwon built a memorial stone at the guest residence of Namwon district to appreciate the contribution of Liu Ting to care for the local people. During the second Japanese invasion in 1597-1598(丁酉再亂), Liu Ting often climbed up the Yongdu pavilion(龍頭亭) located at Mt. Yongtu(龍鬪山) and fell in love with the splendid scenery while enjoying fishing at Jogi(釣磯). Immediately after the war, Liu Ting renovated the Guanwang Shrine(關王廟) in Namwon and built the memorial stone claiming that he defeated the Japanese army with the divine power from Guanyu(關羽).

AGENT-BASED SIMULATION OF ORGANIZATIONAL DYNAMICS IN CONSTRUCTION PROJECT TEAMS

  • JeongWook Son;Eddy M. Rojas
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.439-444
    • /
    • 2011
  • As construction projects have been getting larger and more complex, a single individual or organization cannot have complete knowledge or the abilities to handle all matters. Collaborative practices among heterogeneous individuals, which are temporarily congregated to carry out a project, are required in order to accomplish project objectives. These organizational knowledge creation processes of project teams should be understood from the active and dynamic viewpoint of how they create information and knowledge rather than from the passive and static input-process-output sequence. To this end, agent-based modeling and simulation which is built from the ground-up perspective can provide the most appropriate way to systematically investigate them. In this paper, agent-based modeling and simulation as a research method and a medium for representing theory is introduced. To illustrate, an agent-based simulation of the evolution of collaboration in large-scale project teams from a game theory and social network perspective is presented.

  • PDF

The Stability Assessment of ASSM Tunnels in Service (공용중인 ASSM 터널의 안정성 평가)

  • Kwon, Young Jeong;Park, Min Chul;Shin, Hyo Hee;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.150-159
    • /
    • 2011
  • The need of securing the stability and extending service lives by efficient maintenance of deteriorated tunnels for several decades has been increased. The stability and the usability of conventional tunnels can be decreased by change of physical properties of the surrounding ground, geometrical properties of the tunnel, an underground water level, environmental conditions, oxidation of lining and the breakdown of constituent materials. In respect of a long-term view, it is need to check all sorts of degradation, the degree of damage and durability to improve the serviceability and to come up with measures to maintain effectively. This paper is about study to analyze the stability of conventional tunnels(American Steel Support Method. ASSM). Three tunnels are chosen in those built in the 1930s and 1960s and the locations of tunnels are selected variously(ChungCheong, GyungBuk, GangWon, Jeolla, etc.) to secure reliability of this study. The state of repair and reinforcement of linings, cracks, and thickness and strength of lining of conventional tunnels in service are researched, compared and analyzed. The crack gauge, the GPR, the schmitt hammer was used for the crack investigation, cavitation, the strength respectively. By using these, the comparative analysis for conventional tunnels was conducted. As a result, there are more cracks in tunnels built in the 1930s than those of tunnels built in the 1960s, and lining strength of the 1930s is higher than those of the 1960s. The thickness of lining in tunnels built in the 1960s is higher than those in tunnels built in the 1930s. In proportion to thickness, cavitation occurred more frequently in tunnels built in the 1960s compared to those in tunnels built in the 1930s.

Development of a Pick-up Device for Plug-Seedlings (플러그묘 취출장치 개발)

  • 최원철;김대철;김경욱
    • Journal of Biosystems Engineering
    • /
    • v.26 no.5
    • /
    • pp.415-422
    • /
    • 2001
  • A seedling pick-up device for vegetable transplanters was developed and its work performance was evaluated at the laboratory. The pick-up device extracts seedlings from a 200-cell tray of seedlings and transfers them to the place where they are to be transplanted into the soil. The device consists of a path generator, pick-up pins and a pin driver. The path generator is a five-bar mechanism comprised of a fixed link, a driving link, a driven link, a connecting link and a slider. The slider is constrained to move along the driven link and a fixed slot of combined straight-line and circular paths. The connecting link joins the driving link and the slider. When the slider moves along the straight-line path of the slot it takes seedlings out from the cell and transfers them to the transplanting hopper when moving along the circular path. A proto-type of the pick-up device was built and tested under the various operational conditions such as age of seedling, approach direction and penetration depth of pins to the cell, holding method of seedling and extracting velocity. The device extracted 30 seedlings per minute with the maximum success ratio of 97% using the seedlings of 23 days old. Some design details were also discussed and suggested to enhance the performance of the device.

  • PDF

Strength Analysis of Rear Upright Laminated with Carbon Fiber Composite for Leisure Purposed Small Electric Car (카본섬유 복합재 라미네이트를 적용한 레저용 소형 전기차량의 후륜 업라이트의 구조강도 해석)

  • Jang, Woongeun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.3
    • /
    • pp.273-280
    • /
    • 2019
  • Carbon fiber composite laminate has been widely used in the area of sports applications such as race car, golf club, fishing rods, yacht. In this study, carbon fiber composite laminate was used in the rear upright of leisure purposed small size single-seat electric race car to reduce its unsprung mass of suspension system. The focus of this research is to investigate in finding optimal stacking lay-up of rear upright laminated with carbon fiber composite in the early design phase. Forces transferred from circuit road to rear upright were estimated through MBD(Multi-Body Dynamics)model of the rear suspension geometry. To evaluate the strength of the rear upright laminated with carbon fiber composite which generally behaves in an anisotropic or orthotropic manner, FEA(Finite Element Analysis) model suitable for composite materials was built followed by its strength was evaluated depending on different stacking lay-up. The result showed that Symmetric stacking lay-up [$45^{\circ}/-45^{\circ}/90^{\circ}/0^{\circ}$]s for frontal area and symmetric stacking lay-up with 1mm aluminum core [$45^{\circ}/-45^{\circ}/90^{\circ}/Core$]s for rear area were most suitable of 16 lay-up cases from the side of both strength based on Tasi-wu failure index and weight.

A Study on the Change Detection of Multi-temporal Data - A Case Study on the Urban Fringe in Daegu Metropolitan City - (대도시 주변지역의 토지이용변화 - 대구광역시를 중심으로 -)

  • 박인환;장갑수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.1
    • /
    • pp.1-10
    • /
    • 2002
  • The purpose of this article is to examine land use change in the fringe area of a metropolitan city through multi-temporal data analysis. Change detection has been regarded as one of the most important applications for utilization of remotely sensed imageries. Conventionally, two images were used for change detection, and Arithmetic calculators were generally used on the process. Meanwhile, multi-temporal change detection for a large number of images has been carried out. In this paper, a digital land-use map and three Landsat TM data were utilized for the multi-temporal change detection Each urban area map was extracted as a base map on the process of multi-temporal change detection. Each urban area map was converted to bit image by using boolean logic. Various urban change types could be obtained by stacking the urban area maps derived from the multi-temporal data using Geographic Information System(GIS). Urban change type map was created by using the process of piling up the bit images. Then the urban change type map was compared with each land cover map for the change detection. Dalseo-gu of Daegu city and Hwawon-eup of Dalsung-gun, the fringe area of Daegu Metropolitan city, were selected for the test area of this multi-temporal change detection method. The districts are adjacent to each other. Dalseo-gu has been developed for 30 yeais and so a large area of paddy land has been changed into a built-up area. Hwawon-eup, near by Dalseo-gu, has been influenced by the urbanization of Dalseo-gu. From 1972 to 1999, 3,507.9ha of agricultural area has been changed into other land uses, while 72.7ha of forest area has been altered. This agricultural area was designated as a 'Semi-agricultural area'by the National landuse Management Law. And it was easy for the preserved area to be changed into a built-up area once it would be included as urban area. Finally, the method of treatment and management of the preserved area needs to be changed to prevent the destruction of paddy land by urban sprawl on the urban fringe.

The Implementation of Database Building System for Korean Medical Paper Database (한의학술논문 데이터베이스 구축을 위한 입력 및 검수 시스템 개발)

  • Yea, Sang-Jun;Kim, Ik-Tae;Jang, Yun-Ji;Seong, Bo-Seok;Jang, Hyun-Chul;Kim, Sang-Kyun;Kim, An-Na;Song, Mi-Young;Kim, Chul
    • Korean Journal of Oriental Medicine
    • /
    • v.18 no.3
    • /
    • pp.141-146
    • /
    • 2012
  • Objectives : KIOM(Korean Institute of Oriental Medicine) built up korean medical paper database and services it through information portal OASIS. The database are updated about 1,600 papers and 48,000 references annually. Because lots of manpower and time are needed to update database, it is very important to raise up efficiency and quality of it. Methods : In this paper, we implemented web based database building system utilizing pre-built OASIS' database to improve the working process, data quality and ease of management. Results : First we designed and implemented web based system to input bibliography of the paper efficiently. It raised efficiency using OASIS' paper and reference database. Second we improved the refining process using web based system to raise up data quality. And third we developed the manager functions of web based system to control and check the working process. Conclusions : If we add korean medical dictionary and link outside paper database in the future, we hope that work efficiency and data quality will be raised more. And because the database schema of OASIS system and developed system are different, we are implementing the data transformation system.

Performance and Alternative Policies of Techno-Park Built-up Project in Korea (테크노파크 조성사업의 성과와 정책과제)

  • Lee, Chul-Woo;Kim, Myeong-Yeob
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.12 no.1
    • /
    • pp.19-37
    • /
    • 2009
  • The techno-park built-up project of Korea had begun in order to support regional enterprises since 1997. The number of techno-parks increased from 6 in 1997 to 17 in 2009 with various enterprise supporting services such as a new enterprise breeding, pilot production, and education and training. By way of renewing regional innovation promoting system, revising technopark law, and starting second step techno-park project, techno-parks have become centers for regional technology innovation, and cultivation of regional technology-based companies. Alternative policies for the development of techno-park projects are as follows: revitalizing the network among enterprises, universities, research institutes, and government; strengthening the ability to draw up projects in nurturing regional industry; and the establishment of fixed channels to support SME in the region.

  • PDF

A study on Deployment of the Optimized WBS and Effective Small and Medium Enterprise Informatization System using Standardized PSDM (표준화된 PSDM을 사용한 최적의 WBS 및 효과적인 중소기업 정보화 시스템 구축에 관한 연구)

  • Yoon, KyungBae;Kwon, HeeChoul
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.6
    • /
    • pp.199-205
    • /
    • 2014
  • We would like to study and develop the optimized WBS(Work Breakdown Structure) considering project's range, schedule, cost and human resources management with defining phased work in main task and preceding and escorting relationships for effective small and medium enterprises' informatization through standardized PSDM(Production System Development Methodology). For more systemic and effective system built-up, it introduces production information with WBS study which is appropriate for the small and medium enterprises with setting up management items for enhancing system's reliability, quality, productivity, smooth communication among the participated enterprises such as the small and medium enterprises, IT enterprises, and supervision enterprises, and operational support including maintenance of the built system. This study is purpose of helping a lot of the small and medium enterprises and IT enterprises to build up the systems more effective and reliable within planned schedule using the standardized methodology.