• Title/Summary/Keyword: Building information modeling

Search Result 1,172, Processing Time 0.023 seconds

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

A Case Study on Application Method of Korean Building Information Modeling (BIM) through the Analysis of Wind Load Criteria based on Korean Building Code (KBC) (KBC 풍하중 기준 분석을 통한 풍하중의 한국형 BIM 적용방안에 관한 사례연구)

  • Cho, Young-Sang;Shin, Tae-Song;Hong, Seong-Uk;Bae, Jun-Seo;Kim, Yu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.509-512
    • /
    • 2009
  • 본 논문에서는 KBC(Korean Building Code)와 IBC(International Building Code)의 풍하중 기준의 비교 분석을 통하여, BIM 프로세스 기반의 구조해석 및 설계 프로그램에서 풍하중 산정 시 국내 건축구조설계기준(KBC)을 적용하기 위한 방안을 제시하는 것을 목적으로 한다. 현재 BIM 기반 구조해석 및 설계 프로그램 중에는 한국구조설계기준(KBC)에 부합하는 풍하중 산정이 가능한 프로그램이 존재하지 않는다. 구조설계 기준에서 특히 풍하중 산정 방법은 기준 및 지역에 따른 산정 방법에 차이가 있기 때문에, 구조설계의 안전성을 높이고 한국 실정에 맞는 건축물의 설계를 위해서 KBC 기준의 적용이 필요하다. 본 연구에서는 IBC와 KBC 내의 풍하중 산정 방법의 차이점을 비교 분석하고, 실제 사례연구를 통하여 풍하중 산정의 차이를 확인한다. KBC 기준 풍하중 산정 결과를 구조해석 및 설계 프로그램에 적용하기 위한 방법으로써 외부 프로그램을 활용하며 외부 프로그램에서 산정한 풍하중을 다시 구조해석 및 설계 프로그램 상에 입력하여 구조해석을 수행함으로써 KBC 기준 풍하중의 적용을 통한 한국형 BIM 구조해석 및 설계의 방안을 제시한다.

  • PDF

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

A Study on the Adaptability of BIM-based Integrated Building Design Process in Domestic Architectural Design Firms (BIM기반 통합설계프로세스의 국내 적용 가능성에 관한 연구)

  • Lee, Jin-Hee;Jun, Han-Jong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.6
    • /
    • pp.19-27
    • /
    • 2007
  • As AEC(architecture, engineering and construction) industry becomes larger and more complex, much information is going into each part and phase. Therefore, the existing building design process has to change and collaboration is emphasized among participants in various fields. The purpose of this study is to compare and analyze existing building design process and integrated building design process based on BIM using a IDEF0 methodology. And then, it establishes a desirable domestic integrated building design process application plan focusing on the design phase of domestic cases. As a result of analysis, flowing conclusions are included ; Firstly, problems occur on the existing building design process that are accomplished with focusing on the outcome. It makes much errors because of 2D-based information. Another problems is that collaboration doesn't go on smoothly. But, integrated building design process is accomplished with the collaboration and the coordination which pursues change and perfects cooperation. Secondly, BIM is a process of effecting optimum integrating, re-using information, and expense reduction throughout the life-cycle of a building. Moreover, it establishes a basis for the integrated building design process to build a collaboration system.

Identifying Considerations for Developing SLAM-based Mobile Scan Backpack System for Rapid Building Scanning (신속한 건축물 스캔을 위한 SLAM기반 이동형 스캔백팩 시스템 개발 고려사항 도출)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.312-320
    • /
    • 2020
  • 3D scanning began in the field of manufacturing. In the construction field, a BIM (Building Information Modeling)-based 3D modeling environment was developed and used for the overall construction, such as factory prefabrication, structure construction inspection, plant facility, bridge, tunnel structure inspection using 3D scanning technology. LiDARs have higher accuracy and density than mobile scanners but require longer registration times and data processing. On the other hand, in interior building space management, relatively high accuracy is not needed, and the user can conveniently move with a mobile scan system. This study derives considerations for the development of Simultaneous Localization and Mapping (SLAM)-based Scan Backpack systems that move freely and support real-time point cloud registration. This paper proposes the mobile scan system, framework, and component structure to derive the considerations and improve scan productivity. Prototype development was carried out in two stages, SLAM and ScanBackpack, to derive the considerations and analyze the results.

Developing an Evacuation Evaluation Model for Offshore Oil and Gas Platforms Using BIM and Agent-based Model

  • Tan, Yi;Song, Yongze;Gan, Vincent J.L.;Mei, Zhongya;Wang, Xiangyu;Cheng, Jack C.P.
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.32-41
    • /
    • 2017
  • Accidents on offshore oil and gas platforms (OOGPs) usually cause serious fatalities and financial losses considering demanding environment platforms locate and complex topsides structure platforms own. Evacuation planning on platforms is usually challenging. The computational tool is a good choice to plan evacuation by emergency simulation. However, the complex structure of platforms and varied evacuation behaviors usually weaken the advantages of computational simulation. Therefore, this study developed a simulation model for OOGPs to evaluate different evacuation plans to improve evacuation performance by integrating building information modeling (BIM) and agent-based model (ABM). The developed model consists of four parts: evacuation model input, simulation environment modeling, agent definition, and simulation and comparison. Necessary platform information is extracted from BIM and then used to model simulation environment by integrating matrix model and network model. During agent definition, in addition to basic characteristics, environment sensing and dynamic escape path planning functions are also developed to improve simulation performance. An example OOGP BIM topsides with different emergent scenarios is used to illustrate the developed model. The results showed that the developed model can well simulate evacuation on OOGPs and improve evacuation performance. The developed model was also suggested to be applied to other industries such as the architecture, engineering, and construction industry.

  • PDF

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF

LiDAR Data Segmentation Using Aerial Images for Building Modeling (항공영상에 의한 LiDAR 데이터 분할에 기반한 건물 모델링)

  • Lee, Jin-Hyung;Lee, Dong-Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.1
    • /
    • pp.47-56
    • /
    • 2010
  • The use of airborne LiDAR data obtained by airborne laser scanners has increased in the field of spatial information such as building modeling. LiDAR data consist of irregularly distributed 3D coordinates and lack visual and semantic information. Therefore, LiDAR data processing is complicate. This study suggested a method of LiDAR data segmentation using roof surface patches from aerial images. Each segmented patch was modeled by analyzing geometric characteristics of the LiDAR data. The optimal functions could be determined with segmented data that fits various shapes of the roof surfaces as flat and slanted planes, dome and arch types. However, satisfiable segmentation results were not obtained occasionally due to shadow and tonal variation on the images. Therefore, methods to remove unnecessary edges result in incorrect segmentation are required.

A Novel Technique for Human Traffic based Radio Map Updating in Wi-Fi Indoor Positioning Systems

  • Mo, Yun;Zhang, Zhongzhao;Lu, Yang;Agha, Gul
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.5
    • /
    • pp.1881-1903
    • /
    • 2015
  • With the fast-developing of mobile terminals, positioning techniques based on fingerprinting method draws attention from many researchers even world famous companies. To conquer some shortcomings of the existing fingerprinting systems and further improve its performance, we propose a radio map building and updating technique, which is able to customize the spatial and temporal dependency of radio maps. The method includes indoor propagation and penetration modeling and the analysis of human traffic. Based on the combination of Ray-Tracing Algorithm, Finite-Different Time-Domain and Rough Set Theory, the approach of indoor propagation modeling accurately represents the spatial dependency of the radio map. In terms of temporal dependency, we specifically study the factor of moving people in the interest area. With measurement and statistics, the factor of human traffic is introduced as the temporal updating component. We improve our existing indoor positioning system with the proposed building and updating method, and compare the localization accuracy. The results show that the enhanced system can conquer the influence caused by moving people, and maintain the confidence probability stable during week, which enhance the actual availability and robustness of fingerprinting-based indoor positioning system.

Algorithm-based Railway Tunnel BIM Design Considering Railway Alignment (철도 선형을 고려한 알고리즘 기반의 철도 터널 BIM 설계 방안)

  • Choi, Hyung-Lae;Jang, Kyung-Soo;Kim, Hyouk;Lee, Myeng-Ho;Park, Min-Sang
    • Journal of KIBIM
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2019
  • In process of creating BIM model for tunnel, many user use still CAD, so the workflow for BIM design is not perfect. Therefore, in this paper, we proposes a method to automatically create BIM model without converting 2D drawings in tunnel design. It can allow engineers to design BIM-based tunnel with maximum use of linear information and modify the BIM model whenever there is changed linear information. To do this, we use Dynamo, which can reduce the time required for creating and modifying BIM models during design changes, saving time wasted for BIM conversion design.