공공도서관에 지열시스템 적용시 경제성에 관한 연구 (A Study on the Economic Analysis of Cooling-Heating System Using Ground Source Heat in a public library)

  • 최창호
    • 한국태양에너지학회 논문집
    • /
    • 제32권1호
    • /
    • pp.56-66
    • /
    • 2012
  • This study evaluated the economic benefits by comparing Cooling-Heating System with the existing system in the public library. The building's annual energy consumption was measured by adding the figures of the absorber chillers, the air conditioners and heaters in the building. The total amount of annual energy consumption was 143.51RT in air-conditioning and 83.66RT in heating. So, We made the capacity of geothermal heat pumps three 50RTs in order to check up this system. In order to estimate each construction and equipment cost and to evaluate economical efficiency, LCC(Life Cycle Cost) method was used and the service life of the building was sixty years. The result of analysis was that the geothermal cooling-heating system was more efficient than the existing system in public library.

The significance of removing shear walls in existing low-rise RC frame buildings - Sustainable approach

  • Keihani, Reza;Bahadori-Jahromi, Ali;Goodchild, Charles
    • Structural Engineering and Mechanics
    • /
    • 제71권5호
    • /
    • pp.563-576
    • /
    • 2019
  • According to The Concrete Centre, in the UK shear walls have become an inseparable part of almost every reinforced concrete frame building. Recently, the construction industry has questioned the need for shear walls in low to mid-rise RC frame buildings. This study tried to address the issue in two stages: The first stage, the feasibility of removing shear walls in an existing design for a residential building where ETABS and CONCEPT software were used to investigate the structural performance and cost-effectiveness respectively. The second stage, the same structure was examined in various locations in the UK to investigate regional effects. This study demonstrated that the building without shear wall could provide adequate serviceability and strength within the safe range defined by Eurocodes. As a result, construction time, overall cost and required concrete volume are reduced which in turn enhance the sustainability of concrete construction.

BIM 기반 형상코드를 이용한 슬래브 철근길이 자동 산정 기초 연구 (A Basic Study of Automatic Rebar Length Estimate Algorithm of Slab by Using BIM-Based Shape Codes Built in Revit)

  • 지우민;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.89-90
    • /
    • 2023
  • This dissertation investigates the feasibility of accurately calculating the required rebar length using BIM-based shape codes and the potential benefits of such an approach in terms of cost reduction, waste reduction, and environmental improvement. The study aims to explore the possibility of automatically calculating slab rebar length before construction to reduce rebar cutting waste and cost. The results of this study will provide insights into the potential of using shape codes to reduce rebar cutting waste and cost in building frame construction.

  • PDF

회귀분석을 통한 공공청사 골조 공사의 개산견적 방안 (Conceptual Cost Estimate Method of Public Office Building Structural Frame Work by Regression Analysis)

  • 조영호;최현준;김정원;윤석헌
    • 한국건축시공학회지
    • /
    • 제20권2호
    • /
    • pp.147-153
    • /
    • 2020
  • 프로젝트 초기단계에서 적정공사비 산정은 필수적이다. 적정공사비 산출을 위해서는 개산견적은 중요한 요인이 된다. 하지만 국내의 개산견적 활용 현황은 건물 유형에 따른 단위면적당 공사비만 활용하는데 그치고 있어 그 정확도가 높지 않다. 이에 본 연구에서는 따른 골조 공사의 공통 내역항목 수량을 연면적에 의한 회귀식을 제시하여 골조 공사의 철근, 레미콘, 거푸집에 대하여 개산 수량을 산출하고자 하였다. 본 연구에서 제시한 회귀식의 정확성과 타당성을 검증하기 위해 기존에 사용된 개산 수량법과 본 연구에서 제시한 회귀식을 실 사례에 적용하여 비교분석을 실시하였다. 그 결과 기존 개산 수량 법은 실소요 수량에 비해 발생한 오차율이 -102 ~ 55%였으며, 이에 기존 개산수량 법은 AACE에서 제시한 개산견적 정확도 범위인 -50~100%에 초과되었으나, 본 연구에서 제시한 회귀식의 오차율은 -6.4 ~ 11.62%였다. 이는 AACE의 개산견적 정확도 범위뿐만 아니라 상세견적 단계에서도 사용할 수 있다고 볼 수 있다. 그러나 더 높은 기대효과를 기대하기 위해서는 향후 수량뿐만 아니라 단가에 대한 영향요인을 분석하여 적정 공사비를 산출하는 연구가 필요하다고 판단된다.

공공사업 예정공사비에 대한 실증적 접근 (An Empirical Approach Study on Construction Cost Estimation in Public Work Projects)

  • 유창규;송정규;이윤선;김재준
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

히트 펌프 냉난방 시스템의 실사용을 통한 경제성 분석 (Economic Analysis of Heat Pump System through Actual Operation)

  • 신규원;김길태;주호영;이재근
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2006년도 하계학술발표대회 논문집
    • /
    • pp.921-926
    • /
    • 2006
  • The present study has been conducted economic analysis through actual operation of EHP and GHP which are installed at the same building of an university Cost items, such as initial cost, annual energy cost and maintenance cost of each system are considered to analyze LCC and economical efficiency is compared. The initial cost is considered on the basis of actual costs, and annual energy cost is converted into the cost after measuring electricity and gas consumption a day. LCC applied present value method is used to assess economical efficiency of both them. Variables used to LCC analysis are electricity cost escalation rate, natural gas cost escalation rate, interest rate, and service lives and when each of them are 4%, 2%, 8%, and 20 years, results of analysis short that EHP(148,257,306 won) is 8.05%(12,981,990 won) more profitable than GHP(161,239,295 won).

  • PDF

The Power of Employee Participation in Green Management in the Hospitality Industry

  • Kim, Soo Kyung
    • Journal of Information Technology Applications and Management
    • /
    • 제27권1호
    • /
    • pp.111-123
    • /
    • 2020
  • This paper aims to highlight the importance of employee participation in green management in hotel firms. In particular, the study examined the role of employee participation in green management on cost saving as a hotel's performance indicator. We collected data from senior and general managers in Korean and US hotels. The results of the study supported our hypotheses, showing that the employee participation had a significantly positive relationship with cost savings in hotels. The results of the study also supported other hypotheses, showing that resource conservation and green building management had positive relationships with cost savings in hotels. Therefore, it can be predicted that green management can save cost in hotel firms. Such managerial implications are discussed.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Bayesian Model for Cost Estimation of Construction Projects

  • Kim, Sang-Yon
    • 한국건축시공학회지
    • /
    • 제11권1호
    • /
    • pp.91-99
    • /
    • 2011
  • Bayesian network is a form of probabilistic graphical model. It incorporates human reasoning to deal with sparse data availability and to determine the probabilities of uncertain cases. In this research, bayesian network is adopted to model the problem of construction project cost. General information, time, cost, and material, the four main factors dominating the characteristic of construction costs, are incorporated into the model. This research presents verify a model that were conducted to illustrate the functionality and application of a decision support system for predicting the costs. The Markov Chain Monte Carlo (MCMC) method is applied to estimate parameter distributions. Furthermore, it is shown that not all the parameters are normally distributed. In addition, cost estimates based on the Gibbs output is performed. It can enhance the decision the decision-making process.

비철금속자재 가격의 변동이 업종별 건설공사비에 미치는 영향 분석 (Analyzing the Impact of Price Fluctuation of Nonferrous Metal Materials on Sectoral Construction Cost)

  • 상준;이석원;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.149-151
    • /
    • 2012
  • Changes in the price of materials in construction projects is one of the important variables. Therefore, measures are necessary to respond to the demand and supply of materials and price instability. In previous studies, mainly of ready-mix concrete and steel beam analysis was carried out. However, a study of non-ferrous material prices are still insufficient. So, in this study, the researcher identified the causal relationship between the construction cost and non-ferrous materials prices. Construction Cost Index was selected as a proxy variable of construction cost.

  • PDF