• 제목/요약/키워드: Building completion

검색결과 248건 처리시간 0.023초

Project Financing의 책임준공에 대한 법률 분석 및 해외 사례 분석 (Legal Analysis and Overseas Case Analysis of Project Financing's Responsibility )

  • 최지은;김원창;이태규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.171-172
    • /
    • 2023
  • As a result of analyzing related laws and cases regarding the problems of PF requiring construction companies to guarantee liability for the entire scope of construction, including firefighting facility construction, the law requires repayment ability, and the capital ratio of PF in Korea is 10%. , Since the equity capital ratio of PF in the United States is 30%, it is judged that it is necessary to reduce the dependence of construction companies.

  • PDF

화장실 안전손잡이 위치에 따른 앉은 자세에서 일어서기 비교 (A Comparison of Sit-to-Stand Performance Based on Toilet Grab Bar Positions)

  • 정현애;손유나;이지훈;김희동
    • PNF and Movement
    • /
    • 제17권2호
    • /
    • pp.275-282
    • /
    • 2019
  • Purpose: This study aimed to investigate the optimal positions of safety grab bars for effective sit-to-stand (STS) movement by comparing the results of the STS movement while using a safety grab bar installed under two different conditions: the height of the grab bar installation was determined by (1) the Building Act and (2) the principle of proprioceptive neuromuscular facilitation (PNF). Methods: A total of 50 undergraduate students participated in this study, and they were required to perform an STS movement twice under each condition. A baropodometric platform for sitting and a Biorescue (RM Ingenierie, France) were used to collect and analyze changes in the center of pressure (COP) on the left and right sides before and after performing the STS movement. The average completion time for the STS movement was also measured for analysis. Moreover, the participants were asked to express their individual subjective preferences regarding the two positions of the grab bars. Results: The COP changes were significantly smaller when performing the STS movement with the grab bar installed at the height determined by the PNF principle than the Building Act (p<0.01), and the difference in the completion time of the STS movement was not statistically significant between the two conditions. Conclusion: The findings of this study suggest that the principle of PNF can be useful for planning therapeutic exercise as well as for proposing the optimal grab bar position for older adults and those with health-related issues when performing the STS movement. In addition, this may serve as a basic rehabilitation technique for maintaining remaining functions and providing functional efficiency.

BEMS 데이터를 활용한 도서관 건물의 운전현황 분석 -준공 초기단계의 건물 에너지 성능 평가 (An Operation Status Analysis of Library Building using BEMS Data; Energy Performance Evaluation on Initial Stage of Completion)

  • 박성철;하주완;김환용;송영학
    • 한국건축친환경설비학회 논문집
    • /
    • 제12권6호
    • /
    • pp.669-679
    • /
    • 2018
  • Energy consumption savings in buildings should be reviewed in diverse areas such as air conditioning system and lighting responsible for cooling and heating, and energy management systems such as BAS (Building Automation System) and BEMS (Building Energy Management System) are introduced to improve energy consumption efficiency and to promote economic control of related facilities by integrated management of energy generated and consumption in buildings. The measured building of this study uses regenerative geothermal system. Measured values of heat pump and system COP were 4.7 and 4.2 respectively, and they were found to be higher 11.9% and 23.5% than rated values. As a result of analyzing the air conditioning and lighting energy from the first floor to the fourth floor performing the air conditioning, the second and third floors, which have a high frequency of use, are compared with the first and fourth floors 50% higher energy consumption ratio. On the other hand, the general heat storage system uses the nighttime power of the previous day to store heat and use it the next day. The total number of days of abnormal operation during the summer season is 61 days. The electricity cost corresponding to the abnormal operation is 1,840,641 KRW, and the normal operation using the nighttime power is 1,363,561 KRW, which is difference of 477,080 KRW, 35% increase in cost. We will utilize it as the main data of BEMS through analysis of winter operation characteristics as well as summer operation characteristics.

아파트 지하주차장의 균열방지 대책 - 현장사례조사를 중심으로 - (A Study on the Flaw Prevention Countermeasure of Crack in Apartment House Underground Parking Area)

  • 정순오;서상욱
    • 한국건설관리학회논문집
    • /
    • 제3권1호
    • /
    • pp.115-123
    • /
    • 2002
  • 공간의 효율적 이용 및 법정 주차대수 확보 등으로 아파트 단지의 지하층은 대부분 지하주차장으로 활용되고 있으며, 주차장상부도 시공 중에 성토 및 포장공사가 완성되지 않은 상태에서 작업차량의 통로 및 자재 야적장으로 사용되고 있어 과하중이 작용되고 있는 실정이다. 그러므로 시공중이거나 완공된 지하구조물에서 지속적으로 균열 및 누수현상이 발생하여 구조물의 성능저하는 물론 많은 금액의 하자보수비 투입, 민원유발 및 대외적인 신뢰도 저하 등 많은 문제점이 발생하고 있다. 따라서 본 연구의 목적은 시공중인 아파트와 준공된 아파트 지하주차장을 대상으로 현장조사를 실시하고, 그동안 실시한 안전진단 사례를 참고하여 아파트 지하주차장의 균열 및 누수현상 원인을 파악하고 그에 따른 설계 및 시공상의 방지대책을 마련하는데 있다.

고성능 폴리우레아 수지의 기본적 물리/화학적 성능평가에 관한 실험적 연구 (An experimental study on the Performance Evaluation of High Performance Polyurea Resins)

  • 김윤호;최은규;서현재;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.43-45
    • /
    • 2011
  • As technologies evolve, building large concrete structures ever built, but due to lack of maintenance after completion of concrete corrosion, leaks, and preparedness from the problem that is an urgent need. In particular, water-resistant variety of concrete structures. How the concept applies to the most important public drinking water purification and drinking water that is draining the production and storage, and distribution as the structure cause damage to the structure when the contaminated water is supplied to each home that can harm the health of citizens is the cause. Therefore, the correct choice of materials, and thorough a lot of investment in construction and maintenance should have. In this study, unlike conventional water-proof materials, methods, and in other reactions easily than conventional poly-urea resins have good physical performance and chemical resistance, high performance polyurea resin performance review of the physical infrastructure of the country for the longevity of would like to make long-term durability.

  • PDF

비정형 콘크리트 패널의 수학적 알고리즘을 이용한 생산-설치 데이터 생성모델 기초연구 (A Basic Study on Data Estimation Model of Production-installation Using Mathematical Algorithm in Free-Form Concrete Panel)

  • 손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2016
  • Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.

  • PDF

공동주택 지하주차장의 자연환기성능 향상방안에 관한 연구 (A Strategies to Improve the Natural Ventilation Performance at Underground Parking Lot in Multi-Residential Buildings)

  • 서정민;이중훈;송종의;정정화;송두삼
    • 설비공학논문집
    • /
    • 제23권2호
    • /
    • pp.153-163
    • /
    • 2011
  • Energy efficiency and indoor air quality have become main issue to develop healthy and sustainable building in these days. As an effort to reduce the energy consumption in multi-residential building, many attempts as like passive design strategies and renewable energy as well as active control method are tried. However, underground parking lot in multi-residential building seldom adopt the sustainable strategies and only mechanical system is installed as usual. Moreover, the mechanical system installed in underground parking lot is rarely operated due to the electric demand for operation after completion. In this study, as an energy efficient measure, natural ventilation system using stack effect as a driving force for underground parking lot will be proposed and the performance of the suggested system will be analyzed by simulation method.

Impact of Balance between Productivities on Repetitive Construction Projects

  • Shim, Euysup;Yoo, Wi Sung
    • 한국건축시공학회지
    • /
    • 제13권4호
    • /
    • pp.360-371
    • /
    • 2013
  • Fast delivery of construction projects provides more value to project owners. Batch production, which is production not in single pieces, but in batches, is a common approach in repetitive construction projects such as multi-unit residential building construction projects. In batch production, the use of a small batch size allows the early start of subsequent activities, and thus can lead to early completion of projects. In addition to batch size, balance between productivities in construction activities can affect project duration. However, the impact of the balance between productivities with regard to their order on project duration has not been studied. The main goal of this study is to test a hypothesis, which is that the order of construction activities' unbalanced productivities affects the amount of time reduction that can be achieved by using a small batch size. A computer-based simulation model was developed, and five different cases were simulated to test the hypothesis. The conclusion of the simulation result is that the order of productivities does not affect the time reduction achieved by using a small batch size. It is expected that the findings of this study can help general contractors make decisions in terms of batch size.

공동주택에서 하자관리 실태조사를 통한 공동주택 하자 유형 및 원인 분석 (A Study on the Cases and Factors of Defect Management in Apartment Housing)

  • 강상훈;박재우;손성근;박현정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2019
  • The supply of apartments has continuously increased, and the housing supply rate has exceeded 100 percent and the demands and standards of tenants have also been raised as technology has developed. This has led to the conflict and caused social and economic losses. In this study, the case investigation and research methods of the prior research are analyzed as the basis for identifying the defects cases of causes and influences occurring in the apartment building. To analyze various studies, we divided the prior research into the defect management process and the study on the type of defects and countermeasures, and investigated the features and limitations. Future research will be conducted on apartment buildings within 10 years of completion among conglomerate's nationwide apartments to compensate for the limitations of prior research. In addition, AHP static method and relational chart will be used to identify the relationship between the type of defect and the cause and the importance of the influencing factors.

  • PDF

금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구 (Study on Project Management Method of Naval Ship Building in Monetary Fluctuations)

  • 김형만;서관희;김수영
    • 대한조선학회논문집
    • /
    • 제42권5호
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.