• Title/Summary/Keyword: Building completion

Search Result 248, Processing Time 0.027 seconds

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

A Study on Applying 3D Automatic Displacement Measurement System for Safety Monitoring of Building Demolition Works (건축물 해체공사 안전 모니터링을 위한 3차원 자동변위계측 시스템 활용 방안 연구)

  • Park, Han-Bin;Han, Hye-Rim;Kim, Taehoon;Cho, Kyuman;Cho, Chang-Geun;Kim, Hyeong-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.229-230
    • /
    • 2022
  • According to the national building status, there are a total of 2.89 million buildings that are over 30 years old after completion, and the number is increasing by more than 70,000 to 80,000 buildings every year. As a result, the demand for demolition works is also increasing, and more than 3 to 4 collapse accidents occur steadily every year during demolition work. Major causes of accidents include non-compliance with plans, negligence of on-site supervisors, and failure to secure structural safety. Due to the strengthening of the Severe Disaster Punishment Act, there is growing interest in the demand for secure management of collapse detection during demolition works. Therefore, this study aims to investigate the applicability of real-time safety monitoring systems using a total station capable of 3D automatic displacement measurement in building demolition work for securing structural safety by the load changes during the demolition process.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

A Study on the Building of Remodeling Evaluation Model (리모델링 사업성 평가 모델 구축에 관한 고찰)

  • Yoo In-Geun;Kim Chun-Hag;Yoon Yer-Wan;Yang Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.67-73
    • /
    • 2006
  • This study aims to evaluate the feasibility of remodeling business by predicting the future price of apartment house after remodeling using Hedonic Price Model. The data concerning such 9 independent variables as location, unit size, unit plan, landscape, parking, the number of elapsed years after completion, number of units, mechanical performance, interior from 25 regions in Seoul metropolitan city were collected and evaluated by established evaluation criteria. The coefficients affecting the price of apartment unit were made by Ivay of linear multi-regression and put into Hedonic Price Model. The feasibility evaluation model for apartment was made and verified by data of remodelled apartment. The predicted results using suggested evaluation model coincide with actual apartment market situations.

Toege and the Architecture of Dosan Sodang (퇴계(退溪)의 건축관(建築觀)과 도산서당(陶山書堂))

  • Kim, Dong-Uk
    • Journal of architectural history
    • /
    • v.5 no.1 s.9
    • /
    • pp.18-38
    • /
    • 1996
  • Dosan Sedans was built in 1560, when Toege I Whang(1500-1571) was 60, as a place in which to study and teach disciples. The building was built to a humble 3-kan system which was a popular form of sodang in the 16th century, There found an enlargement of space by attaching outer walls around three sides which was designed by Toege himself. Minimum in space, moderation in form, conrol of embellishment, hermit scholar's aethetics became basic concept of the architecture of Dosan Sodang. After completion of sodang, Toege wrote many poems about pond, walls, flower bed and natural surroundings like sheer cliff, winding river and even rural daily life of villagers around the building. It could be sud that ,for Toege, architecture was cogniged as a whole complex of building and its surrounding natural, artificial and human circumstances.

  • PDF

A Study on Application of Automated Inspection System for Rebar Inspection using 3D Scanner (3D 스캐너를 활용한 철근 자동검측방식의 현장적용성 연구)

  • Lim, Hyun-Su;Kim, Tae-Hoon;Lee, Myung-Do;Kim, Chang-Won;Cha, Min-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.157-158
    • /
    • 2019
  • Reinforcing bars are an important material for tensile strength of structures. For this reason, the inspection of the reinforcing bars confirming the layout and omission is very important for the safety of the structures. However, the current method of inspecting of the reinforcing bars through photographs of specific areas is difficult to identify condition all reinforcing bars. And It is also difficult to confirm after completion of a building. Therefore, reinforcing bar inspection using 3D scanner is required for automation of rebar inspection and database construction. For this purpose, this study test application of automated inspection method for rebar inspection using 3D scanner and discuss the effect of this method.

  • PDF

A Study on the Forecasting of Using BIM Long-Term Maintenance Cost Model for Apartment (BIM을 이용한 공동주택 장기수선비용 예측모델 제시)

  • Song, A-Reum;Kim, Ji-Yun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.215-217
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. It can't use the possibility that BIM originally has, and also causes some confusion in communication. This study analyzes and classifies required information in terms of BIM in the range of estimating repair costs of apartment buildings, as an example of a way to use BIM information at the maintenance step.

  • PDF

A Review of the Quantitative Evaluation Indexes of Barrier-Free Certification for Floor and Ground Surfaces Safety (BF 인증기준의 바닥 안전성에 관한 정량적 평가지표 검토)

  • Ji, Suk-Won;Baik, Kwon-Hyuk;Choi, Soo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.27-28
    • /
    • 2021
  • For Barrier-Free certification, the floor and ground surfaces must be finished with materials that are not slippery, flat, and have low-impact in fallis. However, the BF Certification Act does not provide specific methods to meet these regulations. In performance-based design, the responsibility of proving the performance rests with the building owner and architect, so quantitative evaluation indexes are needed to select suitable materials. Furthermore, changes in performance after completion should be checked periodically in 'As-Is' conditions. There are various methods for slips, trips and falls risk assessment, causing confusion for users. In this study, the results of previous studies on the evaluation methods of slips, trips and falls were considered closely, and each quantitative evaluation index that can be used in the new construction and maintenance phase was presented.

  • PDF

Process Improvements for Reducing Apartment Defects after Completion (준공후 아파트 하자 저감을 위한 절차개선 방안 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.355-361
    • /
    • 2018
  • Many defects are occurring in apartments, the main residential area in Korea. This is due to a lack of construction skills and a lack of management. As many apartments are provided to buyers, the dispute over defects after completion is increasing rapidly. The Housing Act was amended so that local governments could order contractors to repair defects. However, even if defects are resolved after a defect is generated, it is not a fundamental solution that can be satisfied because buyers have to endure the pain caused by the defect. So, it is necessary to protect the interests of buyers by fundamentally reducing defects in apartments. Therefore, in this study, it was suggested that the asymmetry of the information about the apartment buyers should be resolved at the time of sale of the apartment, the final drawings should be a contract document, the review period of the apartment house supervision should be secured, the appropriate supervisory fee should be secured at the time of contract change and the payment procedure should be improved.

Airtightness of Light-Frame Wood Houses built in Daejeon and Chungnam Area

  • Jang, Sang-sik;Ha, Been
    • Journal of the Korean Wood Science and Technology
    • /
    • v.45 no.2
    • /
    • pp.147-158
    • /
    • 2017
  • Among the energy consumption in building, the heating energy takes the largest part. Therefore, it is important to minimize the heat energy loss in building for the reduction of overall energy use in construction. The most important points for the minimization of energy loss in building are insulation and airtightness. Especially, in wood houses, airtightness is very important for energy saving as well as increase of durability. However, the researches on airtightness of wood buildings have been started recently and are very deficient especially in Korea. In this study, air leakage properties and airtightness performance were evaluated for light-frame wood houses built in Daejeon and Chungnam area. Total 7 houses were evaluated, among which four houses (Case 1 to Case 4) were in the construction stage before interior finish and the other three houses (Case 5 to Case 7) were after completion of construction work. The tests for airtightness were conducted by pressurization-depressurization method, and the factors included in the measurements includes air leakage rate at 50 Pa (CMH50), air change rate at 50 Pa (ACH50), equivalent leakage area (EqLA) and EqLA per floor area. As a result of this study, key air leakage points in wood houses were found to be the gaps between floor and wall, the holes for wiring and plumbing, the double glasses windows and the entrance doors. The average value of ACH50 for the houses after completion of construction work was $3.5h^{-1}$ that was similar to Europe standard ($3.0h^{-1}$). ACH50 was proportional to EqLA per floor area but inversely proportional to the internal volume, the net floor area and the area of window.