• Title/Summary/Keyword: Building completion

Search Result 248, Processing Time 0.02 seconds

An Analysis of Electricity Consumption Profile based on Measurement Data in Apartment Complex in Daejeon (대전지역 공동주택의 전력소비 실태 및 패턴 분석 연구)

  • Kim, Kang Sik;Im, Kyung Up;Yoon, Jong Ho;Shin, U Cheul
    • KIEAE Journal
    • /
    • v.11 no.5
    • /
    • pp.91-96
    • /
    • 2011
  • This study is to analysis the characteristics of electric power consumption of apartments complex in Korea. This study shows the pattern of electric power consumption and correlation of each apartment complex's completion year monthly and timely. With this result, we are able to predict the demand pattern of electricity in a house and make the schedule by demand pattern. It is expected this data is used as reference of electric consumption of Daejeon area to operate the simulation tools to predict the building energy. The yearly data of 10 apartment complexes of 2010 are analyzed. The results of this study are followed. The averaged amount of electricity consumption in winter is higher as summer because of the high capacity of heating equipment. All of the house has electric base load from 0.26kWh to 0.5kWh. The average of the electricity consumption of month is shown as 310.2kWh. A week is seperated, as 4 part such as week, weekend, Saturday and Sunday. During week, the average of timely electricity consumption is shown as 0.426kWh. The Saturday consumption is 0.437kWh. The Sunday is 0.445kWh. The peak electricity consumption in summer and winter is measured. The peak consumption on summer season is 1.389kW on 22th August 64% higher than winter season 0.887kW on 3rd January.

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

Matching for the Elbow Cylinder Shape in the Point Cloud Using the PCA (주성분 분석을 통한 포인트 클라우드 굽은 실린더 형태 매칭)

  • Jin, YoungHoon
    • Journal of KIISE
    • /
    • v.44 no.4
    • /
    • pp.392-398
    • /
    • 2017
  • The point-cloud representation of an object is performed by scanning a space through a laser scanner that is extracting a set of points, and the points are then integrated into the same coordinate system through a registration. The set of the completed registration-integrated point clouds is classified into meaningful regions, shapes, and noises through a mathematical analysis. In this paper, the aim is the matching of a curved area like a cylinder shape in 3D point-cloud data. The matching procedure is the attainment of the center and radius data through the extraction of the cylinder-shape candidates from the sphere that is fitted through the RANdom Sample Consensus (RANSAC) in the point cloud, and completion requires the matching of the curved region with the Catmull-Rom spline from the extracted center-point data using the Principal Component Analysis (PCA). Not only is the proposed method expected to derive a fast estimation result via linear and curved cylinder estimations after a center-axis estimation without constraint and segmentation, but it should also increase the work efficiency of reverse engineering.

Database for Patient Information Management in Radiation Oncology Department

  • Lim, Sangwook;Kim, Kyubo;Ahn, Sohyun;Lee, Sang Hoon;Lee, Rena;Cho, Samju
    • Progress in Medical Physics
    • /
    • v.29 no.1
    • /
    • pp.23-28
    • /
    • 2018
  • The purpose of this study is to build a database of patient information for efficient radiotherapy management. Microsoft Office Access was used to build the database owing to its convenience and compatibility. The most important aspect when building the patient database is to make the input and management of patient information efficient at every step of radiotherapy process. The information input starts from the patient's first visit to the radiation therapy department and ends upon completion of the radiotherapy. The forms for each step of radiotherapy process include the patient information form, the radiotherapy schedule form, the radiotherapy information form, the simulation order form, and the patient history form. Every form is centrically connected to the radiation oncology department's patient information form. A test revealed that the database was found to be efficient in managing patient information at each step. An important benefit of this database is improved efficiency in radiotherapy management. Information on patients who received radiotherapy is stored in a database. This means that this clinical data can be found easily and used in future, which will be helpful in research studies on the radiation oncology department. Benefits such as these will potentially contribute to improved radiotherapy quality.

Characteristics of Sedimentation and Self-weight Consolidation of Dredged clay Focusing on Fines Content and Falling Height (세립분 함유량 및 투기고에 따른 준설토의 자중압밀 특성)

  • Kim, Jin-Young;Kim, Hye-Rin;Jang, Jung-Min;Lee, Sung-Yeol;Jeong, Wun-Gie;Jin, Young-Sik;Jeong, Hyo-Jin;Baek, Won-Jin;Kang, Kwon-Soo;Goh, Nam-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.6
    • /
    • pp.39-45
    • /
    • 2016
  • In this paper, analyzes the characteristics of self-weight consolidation on the dredged clay according to the fines content and falling height. Research was performed with the dredged clay sampled by Sae-mangeum field site. Classification of fines content was performed by sieve analysis test. After adjusting the fine content, self-weight consolidation tests were carried out focussing on the variation of fines content and falling heights. From the test results of the self-weight consolidation test, samples with high fines content had reached sedimentation completion more later than ones with less fine content samples. In other words, the start of self-weight consolidation was slowing down with increasing of fines content. Also, from the test results of calculating the coefficient of sedimentation consolidation, the coefficient value were increased with the fines content increases. In addition, the change of sedimentation ratio and volume ratio showed more higher changed value as the fine content increases. Thus, it is important to consider the fines content when estimate the settlement time of dredged soil in field dredge work.

Case Study of Ground Behavior Analysis of Soft and Hard Rock Layers with Fractured Zones in Deep Excavation (깊은 굴착에서 파쇄대를 갖는 연암 및 경암 지층의 지반 거동분석 사례연구)

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.521-532
    • /
    • 2008
  • Supporting system design and construction management for the soft and hard rock layers with fractured zones are very important theme for the safety of temporary retaining wall, surrounding ground and structures in the urban deep excavation for the construction of subway, railway, building etc. The prevailing design method of supporting system for the soft and hard rock layers in the deep excavation is mostly carrying out by simplification without proper consideration for the characteristic of rock discontinuities. Therefore the behaviors of rock discontinuities and fractured zones dominate the whole safety of excavation work in the real construction stage, serious disaster due to the failure of temporary retaining wall can be induced in the case of developing large deformations in the ground and large axial forces in the supporting system. This paper introduces examples of deep excavation where the soft and hard rock layers with fractured zones were designed to be supported by shotcrete and rock bolt, deformations of corresponding ground and supporting systems in the construction period and increments of axial force in the upper earth anchors and strut due to the these deformations were investigated through detailed analysis of measurement data, the results were so used for the management of consecutive construction that led to the safe and economical completion of excavation work. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

A Decision Making Method between Reconstruction & Remodeling for Improvement of the Apartment Housing (공동주택 개량을 위한 재건축과 리모델링의 사업 추진 결정 방법)

  • Kim Hyung-Man;Yoon Suk-Ho;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.476-479
    • /
    • 2004
  • In the process of industrialization of our country in 1970's, Korea's housing strategy has focused on housing supply. Rapid completion and supply of apartment house buildings have caused a problem of their early deterioration due to their poor quality. In 1987 Housing Construction Promotion Act, therefore, included new regulations on housing re-construction. In July 2001, other new regulations on remodeling apartment buildings were also included in the Act. Reconstruction and remodeling have been considered to deal with such problems. This study suggests an appraisal criteria if they can select reconstruction or remodeling method in conducting their apartment building project. At first, evaluation items should be selected by the criteria of function31ity and economical efficiency. Second, the selected item is screened by AHP and multi-criteria decision-making methods. The result of study shows that the owners of apartment units will be able to select reasonable alternatives through the suggested appraisal method

  • PDF

Constraints to the Transmission and Solutions of the Important Intangible Cultural Properties Related to Dance Successors (중요무형문화재 무용전승자의 이수제약과 극복 방안)

  • Kim, Jeong-Ryeon;Kim, Myong-Ju
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.1
    • /
    • pp.176-183
    • /
    • 2011
  • This paper is intended on providing solutions for overcoming constraints to the transmission of the Important Intangible Cultural Properties related to dance successors. For accommodating this approach, six career dancers, from the Dance Society of the Important Intangible Cultural Properties, were invited as the research participants for this study. The In-Depth Interviews and the classification analysis are used as a way of structuring and understanding my observations about these tasks. These interviews have also been verified by an expert group. In conclusion, this study identifies numerous obstacles which can restrict the transmission of the Important Intangible Cultural Properties are as follows; first, the dance successors are constrained by personal reasons such as physical strength and mutual understanding at home; second, the dance successors are affected by the structural constraint of programs such as required time for the completion of training, efficiency of the training program and the educational environment; third, the dance successors are constrained by personal relations such as the relationship between themselves, or between the dance successors and holders of Important Intangible Cultural Properties. Suggested solutions for overcoming the constraints to training programs are; building small sized training centers throughout the country; making training time realistic for individuals; and making programs to train the dancers as well as making it sociable.

Current Status of Ocean Satellite Remote Sensing Data and Its Distribution (해양의 인공위성 자료 현황과 배포 소개)

  • Yang, Chan-Su
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.11a
    • /
    • pp.51-55
    • /
    • 2007
  • As for satellite programs, the multipurpose satellite 1(KOMPSAT-1) was successfully launched on Dec. 21, 1999 and operated for three years. It is still properly operated even though its life cycle was ended. The development of KOMPSAT-2 (Korea Multipurpose Satellite-2) is near completion and the development of KOMPSAT-3, KOMPSAT-5 and COMS (Communication, Ocean, Meterological Satellite) are proceeding swiftly. In KORDI(Korea Ocean Research and Development Institute), the KOSC (Korea Ocean Satellite Center) construction project is being prepared for acquisition, processing and distribution of sensor data via L-band from GOCI(Geostationary Ocean Color Imager) instrument which is loaded on COMS(Communication, Ocean and Meteorological Satellite); it will be launched in 2000. Ansan(the headquarter of KORDD has been selected for the location of KOSC between 5 proposed sites, because it has the best condition to receive radio wave. The data acquisition system is classified antenna and RF. Antenna is designed to be ${\emptyset}$ 9m cassegrain antenna which has 19.35 $G/T(dB/^{\circ}K)$ at 1.67GHz, RF module, is divided into LNA(Low noise amplifier) and down converter, those are designed to send only horizontal polarization to modem The existing building is re-designed and classified for the KOSC operation concept; computing room, board of electricity, data processing room, operation room Hardware and network facilities have been designed to adapt for efficiency of each functions. The distribution system which is one of the most important systems will be constructed mainly on the internet, and it is also being considered constructing outer data distribution system as a web hosting service for to offering received data to user under an hour.

  • PDF