• 제목/요약/키워드: Building completion

검색결과 248건 처리시간 0.024초

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제18권2호
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.

Support Vector Machine Model to Select Exterior Materials

  • Kim, Sang-Yong
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.238-246
    • /
    • 2011
  • Choosing the best-performance materials is a crucial task for the successful completion of a project in the construction field. In general, the process of material selection is performed through the use of information by a highly experienced expert and the purchasing agent, without the assistance of logical decision-making techniques. For this reason, the construction field has considered various artificial intelligence (AI) techniques to support decision systems as their own selection method. This study proposes the application of a systematic and efficient support vector machine (SVM) model to select optimal exterior materials. The dataset of the study is 120 completed construction projects in South Korea. A total of 8 input determinants were identified and verified from the literature review and interviews with experts. Using data classification and normalization, these 120 sets were divided into 3 groups, and then 5 binary classification models were constructed in a one-against-all (OAA) multi classification method. The SVM model, based on the kernel radical basis function, yielded a prediction accuracy rate of 87.5%. This study indicates that the SVM model appears to be feasible as a decision support system for selecting an optimal construction method.

Who Should Control the Integrated Management System for Sewerage Facilities in the Upper Reaches of Multi-Purpose Dams in Korea?

  • Park, Kyoo-Hong;Kim, Hyung-Joon
    • Environmental Engineering Research
    • /
    • 제15권2호
    • /
    • pp.99-103
    • /
    • 2010
  • Integrated management systems (IMS) that control entire sewerage facilities in the upper reaches of multi-purpose dams are being constructed for their efficient operation and management. However, because the IMS installed in a watershed belong to several local government bodies, significant conflict would be expected between stakeholders in the process of deciding who should control the IMS after completion of the construction that was initially implemented under the support of central government. The objective of this study was to suggest a decision making to determine who should control the IMS for sewerage facilities in the upper reaches of multipurpose dams in Korea, using the analytic hierarchy process (AHP). Three alternatives were selected to determine who should control the IMS for sewerage facilities: commissioning to public corporations, commissioning to private corporations, and a role-sharing partnership. In using the AHP technique, the emphasis was on comparing public interests, economics, efficiency, sustainability, specialty, grievance mediation and receptiveness. As a result, building a role-sharing partnership received the highest score. Commissioning to a special institute was also suggested as an alternative as this showed a score similar to that of building a role-sharing partnership.

Variation of Energy Consumption in Barracks through Simulation by Year of Completion

  • Choi, Doo-Sung;Jeon, Hung-Chan;Cho, Kyun-Hyong;Yoo, Jeong-Seong
    • KIEAE Journal
    • /
    • 제16권1호
    • /
    • pp.21-28
    • /
    • 2016
  • Purpose: The purpose of this study is to analyze & suggest the variation of energy consumption consequent on thermal insulation performance strengthening from early 2000s when modernization of barracks began until the present targeting a large barracks. Method: To carry out this research, this study surveyed the standard of thermal insulation by year, which is being applied to a barracks by conducting literature search, and selected the standard model for a barracks. Also, this study analyzed energy consumption by year & region by performing simulation(ECO2)of the selected standard model. Result: As a result, it was analyzed that in case of a building which was completed in 2015, the energy consumption for air-conditioning & heating, lighting, and hot water supply over the year 2000 reduced by 11% on the average in central district, 10% on the average in southern district, and 17% on the average in Jeju, respectively.

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

농촌지역 아파트 공사 설계VE의 공간별 적용방법 분석 연구 (A study of analysis about application of design value engineering in the rural apartment building)

  • 민경석
    • 한국농촌건축학회논문집
    • /
    • 제8권1호
    • /
    • pp.17-24
    • /
    • 2006
  • The purpose of this study is to provide the systematic report and analysis about Apartment VE application in Design Phase. In this study, the method of VE application is classified into foure groups-changing materials, changing a method of construction, acceptance of new technology, and use of new device. The facts found in this study can be summarized as follows. Application rate of VE is highest in building circumference parts. The main reason would be that there are many applicable factors according to locations, types of work, etc. Parking lots also show similar results with the same reason. It means there are a lot of possibility to adapt value engineering in these steps during the work. So far application of value engineering has been so limited that just small changes of process or method have been tried. One reason is the lack of challenging and the other is some characteristics of construction work which is very difficult to fix after completion. In the future, it would be more efficient to apply new technology and new device in construction work. Though these attempts have been ignored in Korea so far, there are still lots of possibilities to be developed in value engineering.

  • PDF

Performance Based Seismic Design State of Practice, 2012 Manila, Philippines

  • Sy, Jose A.;Anwar, Naveed;HtutAung, Thaung;Rayamajhi, Deepak
    • 국제초고층학회논문집
    • /
    • 제1권3호
    • /
    • pp.203-209
    • /
    • 2012
  • The purpose of this paper is to present the state of practice being used in the Philippines for the performance-based seismic design of reinforced concrete tall buildings. Initially, the overall methodology follows "An Alternative Procedure for Seismic Analysis and Design of Tall Buildings Located in the Los Angeles Region, 2008", which was developed by Los Angeles Tall Buildings Structural Design Council. After 2010, the design procedure follows "Tall Buildings Initiative, Guidelines for Performance-Based Seismic Design of Tall Buildings, 2010" developed by Pacific Earthquake Engineering Research Center (PEER). After the completion of preliminary design in accordance with code-based design procedures, the performance of the building is checked for serviceable behaviour for frequent earthquakes (50% probability of exceedance in 30 years, i.e,, with 43-year return period) and very low probability of collapse under extremely rare earthquakes (2% of probability of exceedance in 50 years, i.e., 2475-year return period). In the analysis, finite element models with various complexity and refinements are used in different types of analyses using, linear-static, multi-mode pushover, and nonlinear-dynamic analyses, as appropriate. Site-specific seismic input ground motions are used to check the level of performance under the potential hazard, which is likely to be experienced. Sample project conducted using performance-based seismic design procedures is also briefly presented.

BPR과 정보시스템 구축을 동시 병행 수행하는 방법론 (The Concurrent Processing Methodology of BPR and Information System Building)

  • 한광신;박만곤
    • 한국멀티미디어학회논문지
    • /
    • 제20권7호
    • /
    • pp.1073-1089
    • /
    • 2017
  • Changes in the business environment and increased competitiveness have led many companies to consider Business Process Reengineering(BPR) as a means to improve performance. However, while some BPR projects have been successful among the many companies that have performed BPR, most of the reengineering efforts have been deemed unsuccessful as the project failed. There are many answers to this, but the most important point is that the effective linkage between process innovation and information system construction is insufficient. Even if the reform of consciousness is carried out through the promotion of management innovation activities such as BPR, and the process is improved, management infrastructure can not be continuously maintained if infrastructure, especially information system, is not built up to support it. In this paper, we propose BPR and information system combining methodology for successful BPR execution and information system construction, and describe the result of BPR consulting performance when constructing information system and compare the improvement of failure risk factor. In addition, we present the case through the case of K company, and finally present customer satisfaction through post evaluation after completion of K company information system construction project implementation.

GPS를 이용한 초고층 시공 측량 기술 (A case study of the technology of measurement system using Global Positioning System(GPS) for high-rise buildings)

  • 강선종;강경태
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.187-193
    • /
    • 2006
  • 최근의 과학기술의 발전과 더불어 인공위성을 이용한 GPS 측량시스템의 실용화가 토목을 중심으로 한 건설현장에서도 두드러지고 있다. 특히 측량기준점을 확인하기 어려운 토목현장의 경우에는 GPS 측량의 유용성이 적극적으로 도입되어 실용화 단계에 이르렀다. 그러나 mm단위의 정밀성이 요구되는 건축현장의 경우에는 GPS가 가지는 오차의 크기로 인하여 적용되어 오지 못하다가 최근에 정밀도를 향상시킨 새로운 측량 기술이 개발되어 초고층 건물을 중심으로 적용되고 있다. 본 논문에서는 정확성과 편리성을 획기적으로 개선한 GPS 측량시스템을 세계초고층 건물인 버즈 두바이 현장에 적용한 사례를 소개하고자 한다.

  • PDF

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • 한국건축시공학회지
    • /
    • 제12권2호
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.