• Title/Summary/Keyword: Building completion

Search Result 248, Processing Time 0.028 seconds

Simultaneous Optimization of Hybrid Mid-Story Isolation System and Building Structure (하이브리드 중간층 지진 격리 시스템과 빌딩 구조물의 동시 최적화)

  • Kim, Hyun-Su;Kang, Joo-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.19 no.3
    • /
    • pp.51-59
    • /
    • 2019
  • A hybrid mid-story seismic isolation system with a smart damper has been proposed to mitigate seismic responses of tall buildings. Based on previous research, a hybrid mid-story seismic isolation system can provide effective control performance for reduction of seismic responses of tall buildings. Structural design of the hybrid mid-story seismic isolation system is generally performed after completion of structural design of a building structure. This design concept is called as an iterative design which is a general design process for structures and control devices. In the iterative design process, optimal design solution for the structure and control system is changed at each design stage. To solve this problem, the integrated optimal design method for the hybrid mid-story seismic isolation system and building structure was proposed in this study. An existing building with mid-story isolation system, i.e. Shiodome Sumitomo Building, was selected as an example structure for more realistic study. The hybrid mid-story isolation system in this study was composed of MR (magnetorheological) dampers. The stiffnessess and damping coefficients of the example building, maximum capacity of MR damper, and stiffness of isolation bearing were simultaneously optimized. Multi-objective genetic optimization method was employed for the simultaneous optimization of the example structure and the mid-story seismic isolation system. The optimization results show that the simultaneous optimization method can provide better control performance than the passive mid-story isolation system with reduction of structural materials.

Calibration and Verification of Detailed Prototypical Apartment Building Energy Models for Estimation of Green Remodeling Feasibility (그린리모델링 효과평가를 위한 표준공동주택 정밀에너지해석모델 보정과 검증)

  • Donghyun Seo
    • Land and Housing Review
    • /
    • v.15 no.2
    • /
    • pp.9-17
    • /
    • 2024
  • The prototypical building energy model is very useful in building energy policies, research, and technology development. A prototypical apartment model for detailed energy analysis was proposed by Seo et al. in 2014, but sufficient verification was not possible due to the lack of reliable measurement data in predicting the model's energy consumption. However, verification is now possible thanks to a recent study that analyzed the Household Energy Panel Survey (HEPS) data that is released annually by the Korea Energy Economics Institute (KEEI) and published apartment complex benchmark data. The data was used to calibrate the prototypical apartment energy model located in the central region and constructed between 1990 and 1999. The calibrated model was used to verify the other apartment building groups with respect to region and year of completion. Meteorological data for five representative cities each in the central and southern regions were used for the simulation. A majority of the 18 groups produced results that satisfied the MBE and cv(RMSE) criteria.

A Web-based Long-Term Repair Planning System for Apartment House (웹 기반의 공동주택 장기수선계획 시스템)

  • La Hyo-Shin;Kim Tae-Hee;Han Choong-Hee;Kim Sun-kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.495-500
    • /
    • 2001
  • After the completion of an apartment housing project, deterioration of building materials will commence over time. Building maintenance consists of short-time and long-term repair projects. A long-term repair plan for organized maintenance management should be developed and implemented to maintain the longevity of the building. When forming such a plan, one should carefully predict when each part of the building will need repairs and how often subsequent repairs of each part will occur. The plan should be based on these predictions. Many apartment buildings in Korea have poor long-term maintenance management plans. This is because many of these plans are developed as mere legal formalities rather than as serious attempts to maintain the longevity of buildings. In this study, the materials used in the construction of each part of an apartment building we selected are taken into account to predict when the repairs will be required and how frequently subsequent repairs will be required. Furthermore, We suggest a long-term maintenance management plan for elongation so that apartment house managers can use to periodically check, diagnose, and replace old or malfunctioning parts using a web-based maintenance calender.

  • PDF

Improving on Planting in Small Scale Development - The Case of Seoul - (소규모 대지의 조경 개선방안에 관한 연구 - 서울시를 사례로 -)

  • Cho, Yong-Hyeon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.5
    • /
    • pp.31-41
    • /
    • 2009
  • Under the Korea Building Act, anyone planning to build a building or buildings on a site over $200m^2$ must plant plants over a specific area. In large scale development this rule is adhered to well, but such is not the case in small scale development. Therefore, special attention must be given to small scale development. Thus, the purpose of this research is to analyze the current situation and practice of planting at small scale development sites in Seoul, and then suggest policies for improving them. In this study using the data covering Seongbuk-Gu and Gangnam-Gu, which was surveyed in 2002, the current situation and practice of planting at small scale development sites was analyzed. After a questionnaire survey was conducted with government officers and building owners, the same analysis was made. Then the policies for improvement were extracted. The results are as follows: 1. In superordinate planning stage, because the minimum standards are too low, those must be strengthened. Any district plan does not control planting in private building lots. This requests active application of planting in private building lots as a design control measure in district planning. 2. In the building design stage, there are no guidelines. The obligation of building set-back between adjacent buildings by the Korean Building Act produces mass shaded and inferior planting beds. The act also is blocking landscape architects' participation in small scale development. And wall installations deteriorate the streetscape and growth of plants with shading. Therefore guidelines must be made. 3. In each stage of the building permit, the permit for building completion, and maintenance the Korean Building Act is blocking landscape architects' participation in small scale development, so the planting plan is completely handled by nonprofessional persons. Therefore, the act should be amended in order to make way for landscape architects' participation in each stage of the small scale development process.

Structural Design and Performance Evaluation of a Mid-story Seismic Isolated High-Rise Building

  • Tamari, Masatoshi;Yoshihara, Tadashi;Miyashita, Masato;Ariyama, Nobuyuki;Nonoyama, Masataka
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.227-235
    • /
    • 2017
  • This paper describes some of the challenges for structural design of a mid-story seismic isolated high-rise building, which is located near Tokyo station, completed in 2015. The building is a mixed-use complex and encompasses three volumes: one substructure including basement and lower floors, and a pair of seismic isolated superstructures on the substructure. One is a 136.5m high Main Tower (office use), and the other is a 98.5 m high South Tower (hotel use). The seismic isolation systems are arranged in the $3^{rd}$ floor of the Main Tower and $5^{th}$ floor of the South Tower, so that we call this isolation system as the mid-story seismic isolation. The primary goal of the structural design of this building was to secure high seismic safety against the largest earthquake expected in Tokyo. We adopted optimal seismic isolation equipment simulated by dynamic analysis to minimize building damage. On the other hand, wind-induced vibration of a seismic isolated high-rise building tends to be excited. To reduce the vibration, the following strategies were adopted respectively. In the Main Tower with a large wind receiving area, we adopted a mechanism that locks oil dampers at the isolation level during strong wind. In the South Tower, two tuned mass dampers (TMDs) are installed at the top of the building to control the vibration. In addition, our paper will also report the building performance evaluated for wind and seismic observation after completion of the building. In 2016, an earthquake of seismic intensity 3 (JMA scale) occurred twice in Tokyo. The acceleration reduction rate of the seismic isolation level due to these earthquakes was approximately 30 to 60%. These are also verified by dynamic analysis using observed acceleration data. Also, in April 2016, a strong wind exceeding the speed of 25m/s occurred in Tokyo. On the basis of the record at the strong wind, we confirmed that the locking mechanism of oil damper worked as designed.

A Study on Improving Architect Property Insurance for Safety Accidents of Building (건축물 안전사고에 대비한 건축사 손해보험 개선 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.32-40
    • /
    • 2019
  • This study analyzed operating condition and the problems of damage compensation insunace (property insurance) for qualified architect and derived some suggsetions for improvement. The Certified Architects Act requires all building design and construction supervision to buy property insurance. This study proposes following suggestions to solve problems of current architect property insurance. Firstly, we need to increase the insurance purchasing rate of damage compensation insurance for qualified architect. It is necessary to clearly specify the matters concerning the submission of insurance policies by the architects, which is currently carried out by the Minister's official letter, in the form of official announcement. Secondly, proper insured amount should be adjusted. In order to insured substantial compensation capacity, total amount of insurance should be enlarged. Thirdly, the insurance period should be extended to one year after completion of building to allow compensation for accidents due to design negligence. Generally, the design defect can mostly be identified within one year after completion. Fourthly, insurance coverage should be extended. In the long run, it is essential to enlarge the scope of the security not only to property damage but also to human losses. Finally, an accident record sharing system should be established among insurance companies, so that proper insurance premiums or discounts can be made based on the system.

Improvement of Elevator Management System after Completion (준공 이후 승강기 관리체계 개선에 관한 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.455-461
    • /
    • 2016
  • To operate a large structure or a high-rise building, elevator is essential. Nevertheless, elevator breakdowns or accidents have been consistently reported. When the accidents are not serious, the records are not reported and cumulated in the Korea Elevator Safety Agency. Additionally, in case of replacement or repair of the parts of elevator, conflicts about the person responsible for the expense of the replacement or repair are frequently occurred. However the record of accidents is not decreasing and the conflict about the fund of elevator repair is serious. So, it is needed to reduce the elevator accidents or malfunction, the operation stop of the elevator, the conflict between building owners and users. Therefore, in this study, the elevator maintenance procedures during defect liability period, the notification procedure in case of breakdown or accident elevator, the direction of elevator maintenance contracts, the direction of the elevator inspection were suggested.

Study of Energy Cost for Performing Flush-out in Newly Constructed Multi-residential Buildings during Winter Season (겨울철 신축 공동주택의 플러쉬아웃 시행 시 난방비용에 관한 연구)

  • Lee, Ki Yong;Kim, Kee Han;Park, Jun-Seok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.110-114
    • /
    • 2016
  • Newly constructed multi-residential buildings with more than 500 households should be flushed out indoor contaminants using a mechanical ventilation system or large fans after the completion of construction and prior to occupancy by the Heath-friendly Housing Construction Standards since 2014. In addition, the standard recommends to maintain indoor temperature over $16^{\circ}C$ and relative humidity below 60% while performing the flush-out. However, it is difficult to maintain these recommended indoor conditions, especially during winter season because additional energy cost is needed for space heating. Therefore, in this study, additional energy cost including heating and ventilation energy cost in multi-residential household for flush-out during winter season was estimated using building energy simulation program called EnergyPlus. Additional energy cost according to various conditions for performing flush-out (such as performance period, ventilation rate, and heating set-point temperature) was analyzed. Based on the results of the energy simulation, the energy cost was estimated to be ranged from 14,625 to 29,452\/household in Incheon city and from 3,521 to 26,268\/household in Gwangju City. There was no significant change in energy cost according to the performing terms of flush-out between Incheon and Gwangju City.

A Study on the Transition of the Building of Daegu City Library During the Japanese Colonial Period (일제강점기 대구부립도서관 건물의 변천과정에 관한 연구)

  • Cho, Yong-Wan;Kim, Jong-Sung
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.31 no.4
    • /
    • pp.145-168
    • /
    • 2020
  • The aim of this study is to analyze the transition of the building of Daegu City Library during the Japanese Colonial Period. To do this, the articles of newspaper and periodicals, books, official documents, official gazettes, statistics, publications of official history of Daegu City Library and research papers were widely collected and cross-checked with each others. As the result of this study, the precedent researches and official history publications related to Daegu City Library had some important errors including the date of the municipal ordinance for Daegu City Library, the first building of Daegu City Library and the date of the breaking-ground, completion and opening for the new building. It is assumed that these errors were generated from the shortage of bibliographic information and full-text databases at those time. At the end of this study, additional research about the history of Daegu City libraries during the Japanese Colonial Period were suggested.

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF