• Title/Summary/Keyword: Building Systems

Search Result 4,153, Processing Time 0.029 seconds

A Study of Permanent Form System by Thin Precast Concrete Panel (II) (박판 프리캐스트 콘크리트 영구거푸집 시스템 연구 (II))

  • 남기룡;정문영;정문열;서치호;김윤일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.749-754
    • /
    • 1997
  • Nowadays domestic building market has undergone several changes. Labor costs are too high and materials are in short supply. These raised building costs and therefore lowered productivity. At this point it is the best way to reduce manual labor and find alternative materials that can improve productivity. In the building process form work take the most part of it. So many formwork systems were developed to reduce the construction period and labor cost. But their technical improvements just limited to adjust form shape-the role of form is not changed. This research developed a new formwork systems that can function to unify or minimze the unit process with cast-in-place type permanent form. In former study (reported in '97 spring seminar), we did the assembling test with column and beam clamps. Furthermore, In this paper, we examined the total systems of form erections and evaluated the structural performances.

  • PDF

Development of Multi-purpose Smart Sensor Using Presence Sensor (재실 감지 센서를 이용한 다용도 스마트 센서 개발)

  • Cha, Joo-Heon;Yong, Heong
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.24 no.1
    • /
    • pp.103-109
    • /
    • 2015
  • This paper introduces a multi-purpose smart fusion sensor. Normally, this type of sensor can contribute to energy savings specifically related to lighting and heating/air conditioning systems by detecting individuals in an office building. If a fire occurs, the sensor can provide information regarding the presence and location of residents in the building to a management center. The system consists of four sensors: a thermopile sensor for detecting heat energy, an ultrasonic sensor for measuring the distance of objects from the sensor, a fire detection sensor, and a passive infrared sensor for detecting temperature change. The system has a wireless communication module to provide the management center with control information for lighting and heating/air conditioning systems. We have also demonstrated the usefulness of the proposed system by applying it to a real environment.

Economic Considerations for Building Automation (건물자동화(建物自動化)를 위한 경제성(經濟性) 고찰(考察))

  • Oh, I.H.;Lee, P.K.;Yoon, K.K.;Han, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.975-979
    • /
    • 1988
  • This paper summarizes economic considerations for building automation. While the market for energy management systems(EMS) has been exploding, there are many indications that the pendulum of hight expectations may have swung too far. This is a very important reason for energy management system in both existing and new buildings. Because facilities continue to expand in size and their operations grow more complex, the use of automated systems to control and monitor both programmable and nonprogrammed function becomes an economic necessity. The following is offered as engineerings of economic consideration for building automation systems. Not only get a complete return on investment but increase profits in a few years through savings incurred in labor, utilities fuel and extended equipment life.

  • PDF

Contribution of Reinforced Concrete Floor Slabs to Lateral Behavior of Tall Buildings

  • Rehmanjee, Yasmin;Leslie, Benjamin;Lamianski, Dmitri;Chafart, Manuel
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.25-29
    • /
    • 2022
  • This paper focuses on how the coupling of the columns and walls through the structural slab contributes to the overall stiffness and strength of lateral systems. The rationale and procedures behind the design approach, which may offer a shift from more conventional assumptions made regarding compatibility and connectivity of gravity and lateral structural systems, will be introduced. The impacts on serviceability and strength design will be discussed, and observations on key design and analysis approaches will be featured. Mass and stiffness assumptions will also be reviewed. A case study on the topic will be presented describing implementation of slab coupling into engineering of a building project.

Economic Analysis of Heat Pump System in Educational Building -Focused on the High School of Twenty Four Classes- (교육용 건축물의 히트펌프 냉난방시스템에 대한 경제성 분석 -24학급 규모의 고등학교를 중심으로-)

  • Park, Ryul;Park, Min-Yong;Kim, Jong-Min
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.15 no.10
    • /
    • pp.879-887
    • /
    • 2003
  • Buildings with heating and cooling systems have been increased, since the requirement of thermal comfort for residents is grown. Heating and cooling systems, have been changed from two separate systems to one multi-function system which includes both heating and cooling. Especially, heat pump heating and cooling system has been adopted for general classrooms in schools since education environment improvement project has been launched. This research suggests the best option for the heat pump heating and cooling system in educational buildings through economic assessments for four alternative systems based on electric heat pump (EHP) and gas engine driven heat pump (GHP), which are most widely used for elementary, middle and high schools. The model buildings are in the Y high school which has 24 classes of new construction building, which will be built soon. Annual energy consumption for alternative systems uses BECS 3.10, which can be used for system simulation.

The Work Scope of Remodelling for the Intelligent Office Building (기존 사무소건축의 IB화를 위한 리모델링 작업범위)

  • Park, Keun-Joon;Koo, Soo-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.75-83
    • /
    • 2004
  • The IB is normally defined in terms of BA, OA, security system, information processing and telecommunications services However, the buildings being already in existence are deficient in two areas. One of these areas is building envelope and plan. The other area is mechanical, electrical and structural systems which do not provide the environmental quality required by IB. Existing technology and design knowledge are available to address these deficiencies. Especially, the office buildings being already in existence must meet IB requirement in order to achieve desirable office environment. They are a building envelope, moisture control, properly-located windows, shafts for duct, telephone and electric closets and acoustical environments. In this paper, a new approach to construct the work scope of remodelling the office building being already existence is described by contrasting the building performance criteria of IB. It concludes by speculating on the consequences of extrapolating the results of study to remodelling the office building being already existence.

Thailand's Innovative Strategy on ICT for Nation-Building

  • Chareonwongsak, Kriengsak
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.4
    • /
    • pp.221-227
    • /
    • 2018
  • Nation-building comprises activities related to creating good, smart and courageous people, building a system that supports the nation's people to live together in an orderly way and building a context that facilitates the nation's people and the nation's system to undertake its duties to the fullest capacity, under the agreed ideology. The process of nation-building is complex and there are many components that contribute to the success of nation-building. As the world is developing towards the knowledge society in the present time, ICT is one tool that will help make the process of nation-building, easier, faster and more successful. Therefore, this article aims to analyze how ICT is important to nation-building covering all aspects of economics, politics and society and involving, people, systems and contexts of Thai society, to explain the present ICT situation in Thailand; and to recommend Thailand's innovative strategy on ICT for nation-building.

An Efficient Local Map Building Scheme based on Data Fusion via V2V Communications

  • Yoo, Seung-Ho;Choi, Yoon-Ho;Seo, Seung-Woo
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.2 no.2
    • /
    • pp.45-56
    • /
    • 2013
  • The precise identification of vehicle positions, known as the vehicle localization problem, is an important requirement for building intelligent vehicle ad-hoc networks (VANETs). To solve this problem, two categories of solutions are proposed: stand-alone and data fusion approaches. Compared to stand-alone approaches, which use single information including the global positioning system (GPS) and sensor-based navigation systems with differential corrections, data fusion approaches analyze the position information of several vehicles from GPS and sensor-based navigation systems, etc. Therefore, data fusion approaches show high accuracy. With the position information on a set of vehicles in the preprocessing stage, data fusion approaches is used to estimate the precise vehicular location in the local map building stage. This paper proposes an efficient local map building scheme, which increases the accuracy of the estimated vehicle positions via V2V communications. Even under the low ratio of vehicles with communication modules on the road, the proposed local map building scheme showed high accuracy when estimating the vehicle positions. From the experimental results based on the parameters of the practical vehicular environments, the accuracy of the proposed localization system approached the single lane-level.

  • PDF

A Development of the On-line Maintenance and Management System for the HVAC Systems and the Evaluation of Its Effects (공조설비 온라인 유지관리시스템 개발 및 효과분석)

  • Lee, Tae-Won;Kim, Yong-Ki;Woo, Nam-Sub
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.21 no.11
    • /
    • pp.591-598
    • /
    • 2009
  • The service quality with the various building equipments tends to depend on the individual superintendent's capability and efforts generally and this often lead to poor maintenances and managements of them. N-BMS(Networked Building Management System), proposed in this study, is a new type of building management method, which links principal equipments within many buildings into a communication network and carries out several significant missions such as fault detection, deterioration diagnosis and control the equipments and so on, as well as monitoring which is the main and unique purpose of the conventional BMS. How to construct the N-BMS was considered to keep performance of equipments high and thus to save energy and resource. LCC(Life Cycle Cost) based analysis was also performed in order to verify the effects of some maintenance and management works for the building HVAC systems.

Study on construction method of horizontal ground heat pump system using the building structure (건물구조체를 이용한 수평형 지열시스템의 시공법에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.139-140
    • /
    • 2013
  • Ground source heat pump systems can achieve the energy saving of building and reduce CO2 emission by utilizing stable ground temperature. However, they have many barriers such as high cost of installation, incompletion of design tool, lack of recognition as heating and cooling systems. In order to solve the problems, the building integrated geothermal system (BIGS) developed by several researches which use building foundation as a heat exchanger. In order to establish the optimum design tool of BIGS with the horizontal heat exchanger, the prediction method of ground heat exchange rate developed with numerical simulation model. In this study, the economic analysis for BIGS was conducted based on simulation results and the optimal design method was suggested. As a result, it was found that the case of 32 A, piping space 0.3 m, piping deep 0.5 m and flow rate 9.52 L/min was the best case as 50.1 W/m2 of heat exchange rate. In this case the initial cost was reduced to 115 million won.

  • PDF