• Title/Summary/Keyword: Building Project

Search Result 2,461, Processing Time 0.028 seconds

Architects' PLAZA - overseas journal (건축마당 - 해외잡지동향)

  • Choi, Hyun-Ah
    • Korean Architects
    • /
    • s.487
    • /
    • pp.94-98
    • /
    • 2009
  • 이번 호의 Project 섹션에서는 Bernard Tschumi Architects의 Acropolis Museum, High Standard라는 주제 아래에서 James Corner Field Operation의 High Line, Polsh다 Partnership의 Standard New York을, 그리고 UNStudio의 MUMUTH Music Theater가 소개되고 있다. Building Type Study에서는 '도심의 녹색 건축(Green Civie Building)'이라는 주제로 Anmahian Winton Architects의 Community Rowing Boathouse, Safdie Rabines Architecs의 Baldwin Hills Scenic Overlook, 그리고, Jane F. Kolleny의 Whistler Public Library에 대해 소개하고 있다.

  • PDF

A Multi-Level Digital Twin for Optimising Demand Response at the Local Level without Compromising the Well-being of Consumers

  • Byrne, Niall;Chassiakos, Athanassios;Karatzas, Stylianos;Sweeney, David;Lazari, Vassiliki;Karameros, Anastasios;Tardioli, Giovanni;Cabrera, Adalberto Guerra
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.408-417
    • /
    • 2022
  • Although traditionally perceived as being a visualization and asset management resource, the relatively rapid rate of improvement of computing power, coupled with the proliferation of cloud and edge computing and the IoT has seen the expanded functionality of modern Digital Twins (DTs). These technologies, when applied to buildings, are now providing users with the ability to analyse and predict their energy consumption, implement building controls and identify faults quickly and efficiently, while preserving acceptable comfort and well-being levels. Furthermore, when these building DTs are linked together to form a community DT, entirely new and novel energy management techniques, such as demand side management, demand response, flexibility and local energy markets can be unlocked and analysed in detail, creating circularity in the economy and making ordinary building occupants active participants in the energy market. Through the EU Horizon 2020 funded TwinERGY project, three different levels of DT (consumer - building - community) are being created to support the creation of local energy markets while optimising building performance for real-time occupant preferences and requirements for their building and community. The aim of this research work is to demonstrate the development of this new, interrelated, multi-level DT that can be used as a decision-making tool, helping to determine optimal scenarios simultaneously at consumer, building and community level, while enhancing and successfully supporting the community's management plan implementation.

  • PDF

Otemachi(大手町) Sequential Urban Redevelopment Project

  • Itoh, Toshio
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.83-89
    • /
    • 2017
  • Otemachi(大手町) is the region where it plays a pivotal role in Japanese economy as representative head offices of companies including financial insurance, general trading, information and communication newspaper media are concentrated. However, regenerating the entire region from worn-out infrastructures of buildings and city into the fresh and vibrant foothold in international business was the problem to be solved. In this situation, was examined on the basis of administrative agencies and relevant enterprises to reconstruct office buildings in phases without ceasing business functions and activities by utilizing the large-scale vacant land occurred from the relocation of the national public institutions. The independent administrative institution 'Urban Renaissance Agency(UR)' has completed the examination of industrialization and participation request for the commencement of the project. In this article, The overview of , the new form of project promoted and cooperated by officials and people, is introduced by UR (Urban Renaissance Agency) reorganizing the land exchange and infrastructure through the land readjustment project, and at the same time, procuring capital and building office buildings in solidarity with private development enterprises and financial institutions.

Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF

Effects of Community Health Promotion Project for Garlic Cultivating Farmers Based on Self-efficacy Theory and Community Capacity Building Framework (마늘재배 농업인을 위한 지역사회 건강증진사업 개발 및 효과 검증 - 자기효능 이론과 지역사회역량 이론의 적용 -)

  • Kim, Hyang-Sook;Gu, Mee-Ock
    • Journal of Korean Academy of Nursing
    • /
    • v.41 no.1
    • /
    • pp.80-91
    • /
    • 2011
  • Purpose: This study was conducted to test the effects of a community health promotion project for farmers cultivating garlic. Bandura's self-efficacy theory (1986) and Chaskin's community capacity framework (2001) were used as the theoretical framework. Methods: A nonequivalent control group pretest-posttest design was used. Study participants were 72 garlic farmers (intervention: 36, control: 36). The community health promotion project consisted of health promotion program and community capacity building strategies and was provided for 12 weeks (8 during farming off-season and 4 during farming season). Data were collected between February 23 and May 31, 2009 and were analyzed using chi-square test, Fisher's exact test, t-test, and repeated measure ANOVA using SPSS/WIN 12.0. Results: For the experimental group, significant improvement was found for self-efficacy, farming related health behavior, physical fitness (muscle strength, muscle endurance, upper body flexibility, lower body flexibility, cardiovascular endurance, balance, agility), farmer's syndrome, and health related quality of life as compared to the control group. Conclusion: The findings of the study indicate that the community health promotion project for garlic farmers is effective and can be recommended as a nursing intervention for health promotion of garlic cultivating farmers.

A Study on the Improving the Accuracy of Cost Estimating through Analyzing Influence Factors in Apartment (공동주택 공사비 영향요인 분석을 통한 개산견적의 정확성 향상방안 연구)

  • Yun, Ji-Yeong;Jeong, Kyeong-Tae;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.183-190
    • /
    • 2020
  • Currently, the multi-unit houses are the largest in the ratio of housing types, and the number of households in multi-unit houses is steadily increasing. As the multi-family housing project continues, the accuracy of estimates for decision-making and feasibility assessment are required in the early stages of the project. Therefore, this study selected the influential factors affecting the estimated estimate and showed the relative importance of each factor through weight analysis and suggested the method of calculating the estimated estimate to improve the accuracy. The calculation plan presented through this study will be used as a useful data for project feasibility review and is expected to make a great contribution in preventing the economic loss of the client.

BSC Based Measurement of Satisfaction Degree For Based BIM Construction Projets (BSC를 기반으로 한 BIM프로젝트의 만족도 측정에 관한 연구)

  • Song, Mi-Rim;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.117-129
    • /
    • 2011
  • Building Information Modeling technology (BIM) is one of the most effective solutions to deal with the trend that buildings are getting more and more complicated, large-scaled, and multiple-purposed. BIM in the construction industry is increasingly adopted since the Korea Public Procurement Service announced that BIM would be obligated in a construction project whose total cost is over 50 billion won from 2012. This fact has boosted BIM related research projects as well. However, the majority of the studies have been focusing on the solutions with technological points of view and there has been lack of research on how much degree project stakeholders are satisfied with the BIM adoption in their projects. Therefore, the objective of this study is to investigate the current status and satisfaction degree of stakeholders in a synthesized point of view in BIM-based projects in order to identify critical factors and weak points in the BIM adoption process. The results of this study would greatly help to improve the strategies and processes in BIM-based projects as well as to increase the satisfaction degree of BIM utilization in a project.

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • Kim, Hyunjung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.5
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.