• Title/Summary/Keyword: Building Project

Search Result 2,461, Processing Time 0.038 seconds

A Basic Study on Optimal Price Estimation Model Development of Residential Officetel Project (주거용 오피스텔의 최적 분양가 산정 모델 개발 연구)

  • Jeon, Sang-Sub;Jang, Jun-Ho;Ha, Sun-Geun;Lee, Joo-Hyeong;Son, Ki-Young;Son, Seung-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.124-125
    • /
    • 2018
  • Recently, risk analysis studies regarding the architecture development project have been carried out by applying probabilistic method. However, it had a limit that this studies was conducted in only an apartment. Therefore, the objective of this study is to develop an optimal price estimation model that can be utilized on residential officetel project by applying Monte Carlo simulation. To achieve the objective, first, the variables are selected affecting the feasibility of an officetel based on literature review. Second, causal loop diagram is constructed by arranging the relationship between variables, then the import and expense model is suggested. Third, to carry out optimized parcel price, the range limits are set for each variables then Monte Carlo simulation is performed. In the future, the developed model is expected to help decision-makers as a tool to determine both risk and feasibility of the officetel development project.

  • PDF

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

A Review on the Decision-making Process for Calculating Land and Construction Costs in the Early Stages of the Project - Focusing on the Housing Vonstruction Project in Jeju Island - (사업초기단계에서 토지비 및 건축공사비 산정을 위한 의사결정프로세스에 관한 고찰 - 제주도 내 주택건설사업 중심으로 -)

  • Jo, Seong-Min;Cho, Sung-Hee;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.321-322
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

LEED PERCEPTION DISPARITIES: DESIGNERS VERSUS NON-DESIGNERS

  • Hyun Woo Lee;Youngchul Kim;Doyoon Kim;Kunhee Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.36-41
    • /
    • 2013
  • With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.

  • PDF

A Study on The Management of A Building by Applying RFID/USN (RFID/USN의 적용을 통한 건축물 관리 방안)

  • Ju, Hyun-Tae;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.331-336
    • /
    • 2007
  • The importance of a building management is embossed at construction industry and the concernment about a lengthening longevity and a efficient management of construction project is concentrated. At present, a study about maintenance management of existing building is progressed and normal papers concentrate in partial construction project for showing management method. This paper proposes Management method that make use of RFID/USN at the whole course of construction project that is composed plan, design, supply, construction, operation, maintenance management and so on. First of all, this paper analyzes process and applicable scope of RFID/USN at construction project. At each step, use scope, location, method and so on are decided at plan, design step and equipment, human power, materials and so on are established at supply step. real time progress, human power, safety, material, equipment management and so on put in operation at construction step and building is managemented real time by established sensor tag and wireless sensor network. This paper want to helps efficient project progress and management and presents convenience of maintenance management.

  • PDF

The Effect of Startup Support Policy on Entrepreneurship: Focusing on TIPS Support Projects by the Ministry of SMEs and Startups (창업지원정책이 기업가정신에 미치는 영향: 중소벤처기업부 팁스(TIPS) 지원사업을 중심으로)

  • Kim, Mijoo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.17 no.3
    • /
    • pp.1-17
    • /
    • 2022
  • This study studied the effect of the TIPS support project of the Ministry of SMEs and Startups on the entrepreneurship of TIPS start-ups. The Tips start-up company, which is the subject of the study, was selected for the TIPS support project, participated in all commercialization funds, incubation facilities, and capacity building programs, and was selected as a company that received private investment. One-on-one in-depth interviews were conducted for about eight weeks from January 14, 2022 to March 11, 2022. For this study, the TIPS support project was subdivided into four categories: commercialization funds, incubation facilities, capacity building programs, and private investment attraction, and entrepreneurship factors were classified into four categories: innovation, challenge spirit, leadership, and risk-taking. As a result of the in-depth interview, the influence of the TIPS support project on entrepreneurship factors was in the order of challenge spirit, innovation, risk-taking, and leadership. Specifically, it was found that commercialization funds influenced innovation and risk-taking, incubation facilities had a challenge spirit and risk-taking, competency-building programs had a challenge spirit and leadership, and attracting private investment had an influence on innovation and challenge spirit. The implications of this study are that the TIPS support project, a private investment-led technology start-up support program, was introduced in 2013 and as of the end of March 2022, and a report was prepared focusing on visible performance such as private investment performance and employment rate. However, through this study, by analyzing whether the TIPS support project contributed to the cultivation of entrepreneurship for TIPS start-ups, it was found that it had a positive influence not only on quantitative growth but also on qualitative growth.

IFCXML Based Automatic Data Input Approach for Building Energy Performance Analysis

  • Kim, Karam;Yu, Jungho
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.14-21
    • /
    • 2013
  • To analyze building energy consumption, the building description for building energy performance analysis (BEPA) is required. The required data input for subject building is a basic step in the BEPA process. Since building information modeling (BIM) is applied in the construction industry, the required data for BEPA can be gathered from a single international standard file format like IFCXML. However, in most BEPA processes, since the required data cannot be fully used from the IFCXML file, a building description for BEPA must be created again. This paper proposes IFCXML-based automatic data input approach for BEA. After the required data for BEPA has been defined, automatic data input for BEPA is developed by a prototype system. To evaluate the proposed system, a common BIM file from the BuildingSMART website is applied as a sample model. This system can increase the efficiency and reliability of the BEPA process, since the data input is automatically and efficiently improved by directly using the IFCXML file..

IFCXML BASED AUTOMATIC DATA INPUT APPROACH FOR BUILDING ENERGY PERFORMANCE ANALYSIS

  • Ka-Ram Kim;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.173-180
    • /
    • 2013
  • To analyze building energy consumption, the building description for building energy performance analysis (BEPA) is required. The required data input for subject building is a basic step in the BEPA process. Since building information modeling (BIM) is applied in the construction industry, the required data for BEPA can be gathered from a single international standard file format like IFCXML. However, in most BEPA processes, since the required data cannot be fully used from the IFCXML file, a building description for BEPA must be created again. This paper proposes IFCXML-based automatic data input approach for BEA. After the required data for BEPA has been defined, automatic data input for BEPA is developed by a prototype system. To evaluate the proposed system, a common BIM file from the BuildingSMART website is applied as a sample model. This system can increase the efficiency and reliability of the BEPA process, since the data input is automatically and efficiently improved by directly using the IFCXML file.

  • PDF

A Study on the Scheduling of PETRONAS TWIN TOWER 2 PROJECT (PETRONAS TWIN TOWER 2 프로젝트의 공정관리에 관한 고찰)

  • 최순묵
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.3
    • /
    • pp.59-63
    • /
    • 2000
  • The purpose of this study is to understand the method of scheduling of Petronas twin tower project. Petronas twin tower is the highest building in the world today. Kuala Lumpur City Center Berhad which is owner of Petronas twin tower, managed this construction project by use of useful scheduling techniques, that is, milestone, NSC, NS, PDM, rolling wave, hammock. Now we consider this techniques and try to apply to our construction management.

  • PDF

장려상 배충열, 오병현, 주윤미, 박그림_ 강원대-초고층건물

  • Korean Structural Engineers Association
    • 건축구조
    • /
    • v.13 no.3
    • /
    • pp.88-89
    • /
    • 2006
  • Combination Tube System 의 구성으로 횡력을 부담 각각의 Tube System 에 Core 를 형성하여 Building 의 기능 담당 Tube System 사이의 공간은 자유로운 평면이 가능 Void 공간을 통해 Building 의 미를 더하고 횡력을 분담 G5 Project 의 Landmark 로서 수변공간의 새로운 장소성 제공

  • PDF