• Title/Summary/Keyword: Building Project

Search Result 2,461, Processing Time 0.027 seconds

Analysis of Relationship between Teamwork Attitude and the Job Satisfaction of Project Participants

  • Acharya Nirmal Kumar;Kim Hyung-Soo;Lee Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.164-176
    • /
    • 2006
  • Conflict may occur during teamwork activities. Conflict is the incompatibility of interest of participants; hence, it is more common in a wide varied activities involved construction field. Goals and values involve positive or negative features and are therefore common sources of conflict in construction field. Excessive conflict is a major hindrance to the effective operation of a team. If the conflict is not managed timely and properly, it could be transformed into a big dispute, thus to avoid these situation, it is necessary to augment working together culture. This paper aims to identify project team working factors and to uncover underlying relationships between these factors. A questionnaire survey was used to collect data from professionals. Factor analysis was employed to categorize twenty-one teamwork items evaluated by 169 respondents working in three major construction parties namely, owners, consultants and contractors. Factor analysis uncover that these team work factors can be grouped under three categories titled as: integrative working culture, relationship building and trust building. Multiple regression analysis however, showed that relationship building factor does not influence job satisfaction of project participants. Results of this study can be used as a tool to strengthening relationship between project participants in the construction industry.

A Study on Building Strategy of Comprehensive System (도시재생사업을 위한 종합시스템 구축 전략에 관한 연구)

  • Han, In Goo;Lim, Young Taek;Choi, Bong Moon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2008.05a
    • /
    • pp.458-461
    • /
    • 2008
  • For achieving urban regeneration project, systematic research and analysis about various urban activities are developed urban area. On the based of the research and analysis, a comprehensive regeneration system should be approached to support and manage of an urban regeneration project. This system can be utilized all phase of an urban regeneration project, and it is important link-up and utilization the related GIS. This study will offer that basic strategies of building a comprehensive system for urban regeneration project, and contribute to building a system to support all phase of an urban regeneration project. Also, this study will provide a opportunity to local gov. and central gov. that improve utilize built system.

  • PDF

Effectiveness Analysis of the Use of Smart Technology on Construction Project Performance (스마트 건설기술의 활용이 프로젝트 성과에 미치는 효과성 분석)

  • Lim, Hyunsu;Cha, Minsu;Yoo, Wi Sung;Kim, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.227-228
    • /
    • 2022
  • The slowdown of the global economic market due to the pandemic is causing the global construction market to stagnate, and the use of smart construction technology is drawing attention as one of the main alternatives to overcome this problem. In fact, a number of previous studies have been published that smart construction technologies such as building information modeling and drones can contribute to project performance improvement, such as productivity improvement and cost reduction. However, previous studies focus on the application direction and technical effectiveness of smart construction technology, so the analysis in terms of the contribution that the application of the technology has to the project performance is insufficient. Therefore, the purpose of this study is to focus on the effectiveness aspect of the application of smart construction technology on the project performance. The results of this study are expected to be able to be used as basic data for establishing policies related to the activation of smart construction technology promoted by the government and setting the direction for the use of smart construction technology by stakeholders.

  • PDF

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

Site Analysis and Improvements on Pilot Project of Core-Based Residential Environment Improvement (거점확산형 주거환경개선 시범사업 실태조사 및 개선방향 연구)

  • Paik, Hae-Sun;Lee, Young-Hwan;Kim, Jae-Seung
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.1-11
    • /
    • 2016
  • This study aims to find out the cause of delay by analyzing the process of 12 Core-based Improvement pilot projects, especially focused on lands, buildings, population status. For this purpose, it performed a literature research on maintenance plan reports, various statistics of building and population status analysis, a field research and an individual interview with public officials in charge at local governments of 12 project districts. The findings are as follows; 1) it was difficult to cope flexibly to environmental changes because the core sector was so large that the plan was led to areal improvement. 2) the project was selected without reflecting the characteristics of the core sector and the area of residents-led renovation properly in terms of building status such as building density and old buildings ratio, 3) the coordinator group for socially disadvantaged class in the district was not operated and thus foundation for residents-led renovation was not set up. In conclusion, it should be presented the proper size of the core sector when the core-based residential environment improvement project is initiated in the future. In addition, building status is taken into consideration when designating the core sector and the area of residents-led renovation. The coordinator group needs to be operated from the early stage of the project as well.

Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측)

  • Yun, Seok-Heon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.103-111
    • /
    • 2023
  • Accurate cost estimation in the early stages of a construction project is critical to the successful execution of the project. In this study, an ANFIS model was presented to predict construction costs in the early stages of a construction project. To increase the usability of the model, open construction cost data was used, and a model using limited information in the early stage of the project was presented. We analyzed existing studies related to ANFIS to identify recent trends, and after reviewing the basic structure of ANFIS, presented an ANFIS model for predicting conceptual construction costs. The variation in prediction performance depending on the type and number of membership functions of the ANFIS model was analyzed, the model with the best performance was presented, and the prediction accuracy of representative machine learning models was compared and analyzed. Through comparing the ANFIS model with other machine learning models, it was found to show equal or better performance, and it is concluded that it can be applied to predicting construction costs in the early stage of a project.

Structural Design of High-Rise Building in Toranomon-Azabudai Project (A Block)

  • Kazumasa, Okabe;Kai, Toyama;Takuya, Furuta;Jyunichi, Yamashita;Hiroki, Mukai;Takahiro, Goseki;Shingo, Masuda;Dai, Shimazaki;Yusuke, Miyagi;Yuji, Ozawa
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.3
    • /
    • pp.157-170
    • /
    • 2022
  • This paper explains about structural planning and structural design of the high-rise building in Toranomon-Azabudai Project (A Block) which is now under construction. The building is about 330 meters high, has 4.2 aspect ratio, and the outline of the building has shallow curve. We adopted seismic response control structure. The building is a steel rigid frame structure with braces, and it has enough stiffness to obtain its primary natural period to be less than about seven seconds, in consideration of wind response, seismic response and inhabitability for the wind shaking. In terms of business continuity plan, the building has a high seismic performance; value of story drift angle shall be 1/150 or less and members of the building remain almost undamaged while or after a large earthquake. Active mass dumper shall be installed at the top of the building to improve inhabitability while strong wind is blowing.

A Study of Improvement Factors in the Construction Phase of the Building Project (건축프로젝트의 질 관리에 있어서 시공분야 개선요소에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.4
    • /
    • pp.293-300
    • /
    • 2006
  • Utilizing a building model design of the investigation factors and structured questionnaire, the results of an investigation concerning the improvement factors in the construction phase, as perceived by academic staffs including graduate students, designers, contractors and property management teams, are presented. Findings reveal that management commitment dominate improvement factors for building projects, although construction firms frequently mentioned the team work in design firms. Significant improvements in building projects are obtained when college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs cover quality training. Eighteen predominant selection factors are identified, ranked and correlated.

  • PDF

Comparative Study of Strength and Weakness of System Form in High-rise Building Project (초고층빌딩 거푸집 공사의 장단점 비교에 관한 연구)

  • Park, Byung-Joo;You, Seong-Kue;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.9-10
    • /
    • 2012
  • According to the recent trends in the construction business have been actively booming both overseas plant orders and high-rise buildings orders. In addition high-rise building projects have being promoted or is actually under construction in Korea. Frame structure review which is the most consuming period on high-rise building is essential on that project. In this study looks for the currently form system and compares to those large system used in high-rise buildings.

  • PDF

A Study about Restoration to the Original State Modern Building in Incheon Public Garden(Jayu Park) (인천만국공원 내 근대건축물 복원사업연구)

  • Shon, Jang-Won
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.7 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • Incheon City move onward re-modeling about Jayu Park(public park) in Incheon city. The building restoration must equip all data which are necessary to a restoration and it must be advanced and, currently the project which is advanced is not like that. The place objective which evaluates the restoration possibility of the modern time building where this dissertation is included consequently in project contents it is letting. The evaluation result data is not secured not to be, the restoration is impossible. Also simplicity reappearance of the building where the function disappears without being true feelings characteristic is there is not a possibility of having a construction value. The modern time building restoration which Incheon City it propels consequently it is right to be discontinued.

  • PDF