• Title/Summary/Keyword: Building Outline

검색결과 72건 처리시간 0.024초

Structural Design of High-Rise Building in Toranomon-Azabudai Project (A Block)

  • Kazumasa, Okabe;Kai, Toyama;Takuya, Furuta;Jyunichi, Yamashita;Hiroki, Mukai;Takahiro, Goseki;Shingo, Masuda;Dai, Shimazaki;Yusuke, Miyagi;Yuji, Ozawa
    • 국제초고층학회논문집
    • /
    • 제11권3호
    • /
    • pp.157-170
    • /
    • 2022
  • This paper explains about structural planning and structural design of the high-rise building in Toranomon-Azabudai Project (A Block) which is now under construction. The building is about 330 meters high, has 4.2 aspect ratio, and the outline of the building has shallow curve. We adopted seismic response control structure. The building is a steel rigid frame structure with braces, and it has enough stiffness to obtain its primary natural period to be less than about seven seconds, in consideration of wind response, seismic response and inhabitability for the wind shaking. In terms of business continuity plan, the building has a high seismic performance; value of story drift angle shall be 1/150 or less and members of the building remain almost undamaged while or after a large earthquake. Active mass dumper shall be installed at the top of the building to improve inhabitability while strong wind is blowing.

중국 건설업 BIM 활용 장애요인 (Barriers to the use of BIM in the Chinese construction industry)

  • 송경욱;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.267-268
    • /
    • 2021
  • Since the first BIM development outline was issued in 2011, China has initially tried to adopt BIM in the construction industry. After the BIM guide was issued in 2017, China has officially entered the era of building informatization in the construction industry. Through the statistical data of BIM application reports in China's construction industry from 2014 to 2020, this paper concludes that China has made great progress in the popularization rate of BIM, but has little effect in the adoption in actual projects. Through the reading and analysis of relevant documents in China, 13 obstacle factors for BIM technology adoption in construction enterprises are preliminarily defined.

  • PDF

Wilson's Demarcation of Field: Outline for Reconsideration

  • 최정열;최호택
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2009년도 춘계 종합학술대회 논문집
    • /
    • pp.584-586
    • /
    • 2009
  • Dualized program for building Public Administration scholarship in Korea has been, in a sense, a result of theoretical tension between the two positions, politics/administration dualism vs. politics/administration monism. The program has maintained its integrity by its dependence on a foundational question, "Is administration a different field of action from politics?" Korean community for the study of public administration has maintained its oneness by internally asking this question even though the two external philosophical positions were relatively indubitable. Strating from the well-known changes in the community, this brief outline for the future full exegesis tries to read carefully one point shown in the second chapter of one of the most seminal proposals for foundation of modern Public Administration, one paragrahp in the second chapter of "The Study of Administration" by Woodrow Wilson. What was the contemporary meaning of Wilson's classic distinction made in 1887? Keeping this research question in our mind, we will attempt to prepare for the full understanding of a kind of internal distinction Wilson explicitly draws between the constitutional and the administrative.

  • PDF

해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조 (Outline of Standard Classifications for International Power Plant Construction)

  • 강미연;하지원;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF

Monitoring a steel building using GPS sensors

  • Casciati, Fabio;Fuggini, Clemente
    • Smart Structures and Systems
    • /
    • 제7권5호
    • /
    • pp.349-363
    • /
    • 2011
  • To assess the performance of a structure requires the measurement of global and relative displacements at critical points across the structure. They should be obtained in real time and in all weather condition. A Global Navigation Satellite System (GNSS) could satisfy the last two requirements. The American Global Position System (GPS) provides long term acquisitions with sampling rates sufficient to track the displacement of long period structures. The accuracy is of the order of sub-centimetres. The steel building which hosts the authors' laboratory is the reference case-study within this paper. First a comparison of data collected by GPS sensor units with data recorded by tri-axial accelerometers is carried out when dynamic vibrations are induced in the structure by movements of the internal bridge-crane. The elaborations from the GPS position readings are then compared with the results obtained by a Finite Element (FE) numerical simulation. The purposes are: i) to realize a refinement of the structural parameters which characterize the building and ii) to outline a suitable way for processing GPS data toward structural monitoring.

LCA개념을 도입한 학교시설 녹색건축인증기준 개선방향에 관한 연구 (A Study on the Improvement of the School Green Building Certification System based on Life Cycle Assessment Methodology)

  • 이재옥;김성중;이상민;이승민
    • 교육시설 논문지
    • /
    • 제20권3호
    • /
    • pp.53-61
    • /
    • 2013
  • The purpose of this study is to suggest the way how to improve the school green building certification system based on life cycle assessment methodology and to assess $LCCO_2$ in outline. Green Building Certification System for School is comprised of 7 categories and 39 items. 7 categories include Land use and Transport, Energy and Atmosphere, Materials and Resources, Water, Management, Ecology, Indoor environmental quality. School is a public facility for students. So Green Building Certification System for School must have educational point of view adding to energy saving, reduction of greenhouse gas emission, etc. Also it needs to be classified into three categories ; kindergarten, elementar/middl/high school and university. Improvement plans for items are as follows ; energy consumption and $LCCO_2$ assessment considering life cycle, deletion or integration of duplicate items by comparing other systems, application of passive solar systems, consideration of the law and standards change, and selection of items considering specific building use.

Structural Design of an Ultra High-rise Building Using Concrete Filled Tubular Column with 780 N/㎟ Class High-strength Steel and Fc150 N/㎟ High-strength Concrete

  • Matsumoto, Shuichi;Hosozawa, Osamu;Narihara, Hiroyuki;Komuro, Tsutomu;Kawamoto, Shin-ichiro
    • 국제초고층학회논문집
    • /
    • 제3권1호
    • /
    • pp.73-79
    • /
    • 2014
  • In recent years, the performance requested for which an ultra-high rise buildings is diversified. Large spans are designed in order to gain wide workspace. Column positions are shifted in middle stories to provide space different from neighboring floors. Moreover, in the bottom layers of the building, it is becoming more important to expand freedom to plan flexibility such as creating publically opened wide atria that gives attractive free space. Earthquake-proof criteria is also changing not only human life protection deign but also a design that allows functional continuity. In order to achieve thee needs, as one of technology, we have developed ultra-high strength concrete filled tubular (CFT) columns of the box section that combine ultra-high strength concrete with specified strength of $150N/mm^2$ and ultra-high strength steel material with tensile strength of $780N/mm^2$. In this paper, the outline of development of an ultra-high strength CFT column is reported. Also, the structural design of the ultra-high-rise building using the CFT columns is reported.

Rudder Horn 최적화 설계 방안 (Optimizing Design for Rudder Horn)

  • 박성근
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2006년도 특별논문집
    • /
    • pp.77-80
    • /
    • 2006
  • In recent booming up of the ship building market, the supplying of large scale casting is difficult to keep the delivery schedule for ship yard because of the restrict manufacturer in Korea. And also, it is main cause to rise-up the cost of castings. This paper describes the outline of guidance of optimizing design for Rudder Horn Casting to reduce the risk of the delivery problem to ship yard.

  • PDF

Deep Lexical Semantics: The Ontological Ascent

  • Hobbs, Jerry R.
    • 한국언어정보학회:학술대회논문집
    • /
    • 한국언어정보학회 2007년도 정기학술대회
    • /
    • pp.29-41
    • /
    • 2007
  • Concepts of greater and greater complexity can be constructed by building systems of entities, by relating other entities to that system with a figure-ground relation, by embedding concepts of figure-ground in the concept of change, by embedding that in causality, and by coarsening the granularity and beginning the process over again. This process can be called the Ontological Ascent. It pervades natural language discourse, and suggests that to do lexical semantics properly, we must carefully axiomatize abstract theories of systems of entities, the figure-ground relation, change, causality, and granularity. In this paper, I outline what these theories should look like.

  • PDF

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • 한국건축시공학회지
    • /
    • 제13권5호
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.