• 제목/요약/키워드: Building Model

검색결과 6,105건 처리시간 0.027초

Canopy Model 적용을 통한 도심지 풍환경 예측 CFD 시뮬레이션 결과의 보정 (Modification of CFD results for Wind Environment in Urban area with Tree Canopy Model)

  • 정수현;홍인표;최종규;송두삼
    • 한국태양에너지학회 논문집
    • /
    • 제32권spc3호
    • /
    • pp.185-193
    • /
    • 2012
  • Recently rapid urbanization facilitates development of high-rise building complex including apartment and office building in urban area. Many problems related with high -rise building are reported. Especially, unpleasant strong winds in pedestrian area are frequently encountered around the high-rise building. CFD simulation methods are used to analyze the wind environment of pedestrian level in high-rise building block. However, the results show differences between CFD and measurement. This difference is attributed to improper use of CFD. Conventional CFD simulation for wind environment around high-rise building does not describe the effect of trees, shrubs and plants near ground which affect the wind environment of pedestrian level. Canopy model can be used to reproduce the aerodynamic effects of trees, shrubs and plants near ground. In this paper, CFD simulation methods coupled with the tree canopy model to predict wind environment of pedestrian level in high-rise residential building block were suggested and the validity was analyzed by comparison between measurement and CFD results.

Theoretical and experimental dynamic characteristics of a RC building model for construction stages

  • Turker, Temel;Bayraktar, Alemdar
    • Computers and Concrete
    • /
    • 제17권4호
    • /
    • pp.455-475
    • /
    • 2016
  • Dynamic characteristics, named as natural frequencies, damping ratios and mode shapes, affect the dynamic behavior of buildings and they vary depending on the construction stages. It is aimed to present the effects of construction stages on the dynamic characteristics of reinforced concrete (RC) buildings considering theoretical and experimental investigations. For this purpose, a three-storey RC building model with a 1/2 scale was constructed in the laboratory of Civil Engineering Department at Karadeniz Technical University. The modal testing measurements were performed by using Operational Modal Analysis (OMA) method for the bare frame, brick walled and coated cases of the building model. Randomly generated loads by impact hammer were used to vibrate the building model; the responses were measured by uni-axial seismic accelerometers as acceleration. The building's modal parameters at these construction stages were extracted from the processed signals using the Enhanced Frequency Domain Decomposition (EFDD) technique. Also, the finite element models of each case were developed and modal analyses were performed. It was observed from the experimental and theoretical investigations that the natural frequencies of the building model varied depending on the construction stages considerably.

열화 및 공극을 고려한 원전 격납건물의 다층쉘요소모델과 내진성능 한계상태 (Multi-Layered Shell Model and Seismic Limit States of a Containment Building in Nuclear Power Plant Considering Deterioration and Voids)

  • 남현웅;홍기증
    • 한국지진공학회논문집
    • /
    • 제28권4호
    • /
    • pp.223-231
    • /
    • 2024
  • For the OPR1000, a standard power plant in Korea, an analytical model of the containment building considering voids and deterioration was built with multilayer shell elements. Voids were placed in the vulnerable parts of the analysis model, and the deterioration effects of concrete and rebar were reflected in the material model. To check the impact of voids and deterioration on the seismic performance of the containment building, iterative push-over analysis was performed on four cases of the analytical model with and without voids and deterioration. It was found that the effect of voids with a volume ratio of 0.6% on the seismic performance of the containment building was insignificant. The effect of strength reduction and cross-sectional area loss of reinforcement due to deterioration and the impact of strength increase of concrete due to long-term hardening offset each other, resulting in a slight increase in the lateral resistance of the containment building. To determine the limit state that adequately represents the seismic performance of the containment building considering voids and deterioration, the Ogaki shear strength equation, ASCE 43-05 low shear wall allowable lateral displacement ratio, and JEAC 4601 shear strain limit were compared and examined with the analytically derived failure point (ultimate point) in this study.

고층건물에 작용하는 풍하중에 관한 수치 해석적 연구 (Numerical study of wind load on the high-rise building)

  • 송지수;박승오;김동우;하영철
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.205-208
    • /
    • 2008
  • The wind load on building surface is numerically investigated. The geometry of target building is a square cross section and aspect ratio (height (H) to width (d)) is 6. On building surface, the pressure was measured, compared to obtained value from numerical simulation. The numerical simulations were done using URANS with three different turbulence models such as v2-f model, k-${\omega}$model, and k-${\varepsilon}$ model, respectively. The v2-f model showed the best agreement with experimental data in simulating mean pressure coefficients on front, rear and side surface. But unsteady characteristics of pressure history measured on surface is shown a discrepancy between experiment and numerical simulation.

  • PDF

계획설계 단계에서의 개방형 BIM 기반 초고층건축물 수직동선 계획 및 검증모듈 개발 (Open BIM-based Vertical Circulation Planning and Verifying Modules for Super-Tall Building at the Schematic Design Phase)

  • 김인한;조근하;최중식;천의영
    • 한국CDE학회논문집
    • /
    • 제16권2호
    • /
    • pp.156-164
    • /
    • 2011
  • The automation technology is able to enhance the business process more rapidly and effective. Open BIM technology which supports automation technology of building overcomes the limitations of two dimensions drawings system. The purpose of this study is on the development of open BIM based modules for creating and verifying the core model for super-tall building in the schematic design phase. The module is expected to create cases of core models automatically and it is expected to verify the requirement of building model. This module is anticipated to utilize for creating the core model rapidly in order to create the alternative plan and to make the model accurate by its verification.

BIM Model 기반 철근 수량산출 시 고려사항 (Considerations When Quantity Take-Off of Rebar Based on the BIM Model)

  • 정서희;김주용;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.73-74
    • /
    • 2023
  • The purpose of this study is to derive the cause of the quantity difference and present the considerations when take-off rebar quantity based on BIM model by comparing the quantity of rebar based on BIM model with 2D drawing. This research was limited to take-off the quantity of rebars in the building frame work, and after take-off the quantity of rebars by 3D modeling the 2D drawing of the target building with Revit, the quantity difference was compared with 2D-based software. Therefore, when take-off the quantity of rebars based on the BIM model, instead of take-off the existing 2D-based quantity premium proportion, according to general structural consider development length, lap splice length, covering thickness, reinforcing bars and spacing. In the future, this study is expected to contribute to improving the accuracy of BIM-based frame construction quantity take-off.

  • PDF

THE FINANCING MODEL FOR GREEN BUILDING PROJECTS WITH THE GOVERNMENTAL GUARANTEE BASED ON CER (Certified Emission Reduction)

  • Sang-Hyo Lee;Se-Woong Jang;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.368-375
    • /
    • 2011
  • Along with the growing interest in greenhouse gas reduction, the effect of energy reduction from green buildings is gaining interest as well. However, green buildings may have difficulties in financing due to their high initial construction costs. With this in mind, the objective of this study is to suggest a financing model for green building projects with a governmental guarantee based on CER (Certified Emission Reduction). In other words, in the financing model, the government provides a guarantee for the increased costs of a green building project in return for CER. The suggested financing model was tested and found feasible for implementing green building projects. In addition, the model in this study is applicable to private projects because guarantee has its return. To utilize CER as a return for a financial guarantee, however, certification of CDMs (Clean Development Mechanism) for green buildings must be vitalized.

  • PDF

Verification of a tree canopy model and an example of its application in wind environment optimization

  • Yang, Yi;Xie, Zhuangning;Tse, Tim K.T.;Jin, Xinyang;Gu, Ming
    • Wind and Structures
    • /
    • 제15권5호
    • /
    • pp.409-421
    • /
    • 2012
  • In this paper, the method of introducing additional source/sink terms in the turbulence and momentum transport equations was applied to appropriately model the effect of the tree canopy. At first, the new additional source term for the turbulence frequency ${\omega}$ equation in the SST k-${\omega}$ model was proposed through theoretical analogy. Then the new source/sink term model for the SST k-${\omega}$ model was numerically verified. At last, the proposed source term model was adopted in the wind environment optimal design of the twin high-rise buildings of CABR (China Academy of Building Research). Based on the numerical simulations, the technical measure to ameliorate the wind environment was proposed. Using the new inflow boundary conditions developed in the previous studies, it was concluded that the theoretically reasonable source term model of the SST k-${\omega}$ model was applicable for modeling the tree canopy flow and accurate numerical results are obtained.

Investigation of the SHM-oriented model and dynamic characteristics of a super-tall building

  • Xiong, Hai-Bei;Cao, Ji-Xing;Zhang, Feng-Liang;Ou, Xiang;Chen, Chen-Jie
    • Smart Structures and Systems
    • /
    • 제23권3호
    • /
    • pp.295-306
    • /
    • 2019
  • Shanghai Tower is a 632-meter super high-rise building located in an area with wind and active earthquake. A sophisticated structural health monitoring (SHM) system consisting of more than 400 sensors has been built to carry out a long-term monitoring for its operational safety. In this paper, a reduced-order model including 31 elements was generated from a full model of this super tall building. An iterative regularized matrix method was proposed to tune the system parameters, making the dynamic characteristic of the reduced-order model be consistent with those in the full model. The updating reduced-order model can be regarded as a benchmark model for further analysis. A long-term monitoring for structural dynamic characteristics of Shanghai Tower under different construction stages was also investigated. The identified results, including natural frequency and damping ratio, were discussed. Based on the data collected from the SHM system, the dynamic characteristics of the whole structure was investigated. Compared with the result of the finite element model, a good agreement can be observed. The result provides a valuable reference for examining the evolution of future dynamic characteristics of this super tall building.

Modeling of a Building System and its Parameter Identification

  • Park, Herie;Martaj, Nadia;Ruellan, Marie;Bennacer, Rachid;Monmasson, Eric
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권5호
    • /
    • pp.975-983
    • /
    • 2013
  • This study proposes a low order dynamic model of a building system in order to predict thermal behavior within a building and its energy consumption. The building system includes a thermally well-insulated room and an electric heater. It is modeled by a second order lumped RC thermal network based on the thermal-electrical analogy. In order to identify unknown parameters of the model, an experimental procedure is firstly detailed. Then, the different linear parametric models (ARMA, ARX, ARMAX, BJ, and OE models) are recalled. The parameters of the parametric models are obtained by the least square approach. The obtained parameters are interpreted to the parameters of the physically based model in accordance with their relationship. Afterwards, the obtained models are implemented in Matlab/Simulink(R) and are evaluated by the mean of the sum of absolute error (MAE) and the mean of the sum of square error (MSE) with the variable of indoor temperature of the room. Quantities of electrical energy and converted thermal energy are also compared. This study will permit a further study on Model Predictive Control adapting to the proposed model in order to reduce energy consumption of the building.