• Title/Summary/Keyword: Building Life Cycle

Search Result 530, Processing Time 0.028 seconds

A Study on Data Literacy Competency Building Measures: Focusing on Research Data Management Education (데이터 리터러시 역량 강화 방안에 관한 연구 - 연구데이터 관리 교육을 중심으로 -)

  • Juseop Kim;Suntae Kim
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.57 no.1
    • /
    • pp.115-137
    • /
    • 2023
  • The purpose of this study is to present a guide for the development of research data management education programs for researchers affiliated with domestic universities and research institutions. In order to present the relevant program guide, first, we investigated and analyzed educational programs for overseas research data management. The educational programs studied and analyzed are RDMRose, RDMLA, DataONE, Digital Research Alliance of Canada, NNLM, PARTHENOS and Coursera. In addition, in order to confirm the appropriateness of the education program, it was reviewed through the detailed competency of data literacy researched in Korea. As a result of the review, most of the detailed competencies for data literacy were satisfied. Finally, a program guide for researchers was presented by synthesizing the research data management education programs that were investigated and analyzed. The results of this study will help develop research data management education programs that can systematically support and activate researchers belonging to universities and institutions.

Smart City Framework Based on Geospatial Information Standards (공간정보 표준기반 스마트시티 프레임워크)

  • Eunbi Ko;Guk Sik Jeong;Kyoung Cheol Koo
    • The Transactions of the Korea Information Processing Society
    • /
    • v.13 no.2
    • /
    • pp.1-12
    • /
    • 2024
  • Modern cities are actively adopting smart city services to address various urban challenges. Geospatial information acts as the foundational infrastructure of smart cities, promoting the sustainable development of urban areas. Consequently, as the standardization and utilization of geospatial information increase, the efficiency and sustainability of smart city operations improve. To achieve this, collaboration among diverse stakeholders is crucial for delivering optimal smart city services based on geospatial information. This paper defines smart city services, focusing on transportation and building-energy domains, based on the life cycle of geospatial information technology. Emphasis is placed on the importance of applying and utilizing geospatial information standards. Additionally, this paper proposes the Smart City based on Geospatial Information standards (SCGI) framework to provide insights into standardizing smart city services mapped to geospatial information standards. This research suggests a new paradigm for standardizing smart city services using geospatial information standards to offer customized solutions, thereby discussing the future development possibilities of smart cities.

A Study on Identifying and Utilizing PID-Based Research Entity at a National Level (국가 차원의 PID 기반 연구 개체의 식별 및 활용에 관한 연구)

  • Gyuhwan Kim
    • Journal of Korean Library and Information Science Society
    • /
    • v.55 no.1
    • /
    • pp.215-237
    • /
    • 2024
  • This study proposes a selection plan for research entities and PIDs and a strategy for building and operating a PID consortium based on a survey of advanced cases of research entities and PID operations in major countries such as the United Kingdom, Germany, Canada, Japan, China, and Australia. The criteria for selecting research entities and PIDs are 'research life cycle' and 'PID infrastructure maturity'. Based on the two selection criteria, it is proposed to prioritize research entity-PID pairs such as 'Researcher-ORCID', 'Publication-DOI', 'Data-DOI', 'Institution-ROR', 'Grant-DOI', and 'Project-RAiD' and expand to other research entities and PIDs in the emerging stage. The strategy for establishing and operating a PID consortium should encourage the participation of various PID stakeholders, identify the latest trends through collaborative networks with domestic and international PID organizations, lead education and outreach activities to raise awareness and increase utilization of PID, and secure policy support and financial stability. This is expected to lay the foundation for domestic research entities to gain visibility and accessibility at the global level.

CHOBUN, Understanding the Double Burial Custom in Korea from a Jungian Perspective : Focusing on Putrefaction and Reduction to Bones (초분, 한국 이중장제의 분석심리학적 고찰 : 부패와 뼈로의 환원을 중심으로)

  • Jahyeon Cho
    • Sim-seong Yeon-gu
    • /
    • v.31 no.2
    • /
    • pp.113-150
    • /
    • 2016
  • Chobun refers to a temporary grave covered with straw thatch that contains a corpse until its flesh is gone. When all the flesh has rotted away, the straw grave is disassembled and only the bones are retrieved. Therefore, Chobun is an example of a secondary burial custom (German : Doppel Bestattung) that is composed of a first temporary funeral for processing the corpse's flesh, and a second permanent burial of the final remains (bones or ashes). The duration of the temporary burial is determined by the time needed for decomposing the flesh of the deceased. Building a Chobun progresses putrefaction and reduction to bone. In the literature of alchemy, putrefaction and new life occur simultaneously. The purpose of rotting is to make the flesh disappear, leaving only its essence. It is making the physical body enter a spiritual state, so that the dead can enter into a different world. One must endure the unstable rotting process until the smell of flesh has faded. The rotting process is the attitude of accepting the terrible, polluted aspect of the corpse, while maintaining a helpless, passive posture, in order to allow new possibilities. When we try to approach an archetypal aspect of the unconscious, it is often experienced in threatening, aggressive ways. In the individuation process, the unconscious offers us the blessing of a new spiritual awakening and renewed sense of life, only when we have the courage to see this terrifying and contaminated side of our psyche. This is exactly what putrefaction means. Bone and skeleton symbolize the indestructible, imperishable, and essential elements of life. Bone is the minimum unit and foundation for regeneration, where new life can grow. Reduction to bone is moving back to the origin of life, to the womb. Psychologically, it means discarding one's ego-centeredness and allowing the Self to lead the entire process of individuation. Going through the painful process of reduction to a skeleton for the purpose of further development is a declaration of the death of the ego, aiming at the liberation from perishable flesh and acquisition of the spiritual, regenerative, and immortal elements of life. Chobun also denotes the yearly decay and revival of life, especially of vegetal life. In Chobun, this symbolic meaning of the vegetal cycle of life is emphasized to represent the part of life that survives even after death. Vegetation related to Chobun deals with the continuity of life and psychologically with the Self. Images of vegetation are closely related to the existence of life beyond death, which is the existence of the Self, the source of energy that constantly renews and rejuvenates the consciousness.

Light Conditions for Suitable Growth of Urban Interior Plants - In Case of Green House within Kyobo Building, Seoul - (도심 실내조경 식물의 적절한 생육에 필요한 광조건 - 서울시 광화문 교보생명빌딩 그린하우스를 대상으로 -)

  • Lee, Kyong-Jae;Choi, Jin-Woo;Pae, Ho-Bong;Kang, Hyun-Kyoung
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.3
    • /
    • pp.113-124
    • /
    • 2009
  • This study has attempted to calculate the intensity of illumination for the optimal growth environment of indoor plants after analyzing both damage to plant species and growth conditions as impacted by light conditions for the Kyobo Life Insurance greenhouse. The optical intensity of illumination has been estimated after investigating the problems of growth conditions based on an analysis of illumination by light condition, dead tree replacement cycle(weeks) and rate of damage of plant species. According to the investigation of illumination, the lowest difference was observed between the shaded spot in the south(531lux) and the sunny spot(602lux) while the largest difference(nearly 500lux) was detected between the shaded spot in the central area(210lux) and the sunny spot(782lux). According to an analysis of dead trees from 1990 to 2004, in terms of dead tree replacement cycle, Viburnum awabuki was the highest(161weeks), followed by Phyllostachys spp.(84weeks), Camellia japonica and Ternstroemia japonica(40weeks). Regardless of plant species, damage rate of plant were lower in the shaded spot and higher in the sunny spot. According to correlation and regression analyses with the intensity of illumination as an independent variable and the damage rate of plant species as a dependent variable, the damage rate of plant species increased as the intensity of illumination decreased. A dramatic decline in the rate of damage was observed at $500{\sim}600lux$. At 700lux, it reached the lowest level.

Prioritizing of Civil-BIM DB Construction based on Geo-Spatial Information System (지형공간정보체계 기반의 토목-BIM DB구축 우선순위 선정)

  • Park, Dong Hyun;Kang, In Joon;Jang, Yong Gu;Lee, Byung Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.23 no.1
    • /
    • pp.73-79
    • /
    • 2015
  • Recently, BIM proliferates at high speeds so that BIM planning is trying to be used in various kinds of engineering. However, when using different software during design phase and construction phase, the problem of mutual compatibility is coming out. Even the BIM technology has been used or the practical applicability has been made into result, it would be fair to say that BIM has limitations in the visual level. In this research, it is meaningless to obtain the BIM result as the primary purpose. As the usefulness of it is judged incomplete, we committed to master the trend and problems of terrain spatial information systems and BIM. Furthermore, the plan of building the BIM in the civil field, especially the civil-BIM based on the technology ofterrain spatial information has been presented. It can be judged through this research that the high-capacity DB of BIM occurred during the whole process may cause poor performance of the following stage the structure system which connects the terrain spatial information and civil-BIM. In order to manage the optimal full cycle, the spatial analysis technology of the stages after choosing the DB has been described.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Study of Establishing the Development Strategy of Construction Project Management System Using SWOT Analysis (SWOT분석을 통한 건설사업관리시스템 개발전략 수립에 관한 연구)

  • Kim, SeongJin;Ok, Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.86-93
    • /
    • 2016
  • Information technology, such as IoT, Big Data, Drone, Cloud etc., is evolving every year. Information Society is changing Intelligence Society and Creative Society. A new Construction Projects Management System Roadmap is required because it is difficult to reflect the current IT environments based on the CALS(Continuous Acquisition & Life-cycle Support) master plan, which is performed to establish every five years since 1998. This study was prepared for the Roadmap with a focus on Construction Management System based on the 4th CALS master plan, which was performed to establish the 2012 year. To this end, the construction environment and several information systems were investigated and analyzed. The problems of the construction project information system were derived using SWOT analysis, the vision, goal, direction, strategy, main tasks, specific tasks, and timetable of the Construction Project Management System are presented. This roadmap is designed to be used as operational indicators of a future construction project management system.

Development of LCC-LCA Integrated Analysis Model for Efficiency (경제성 평가를 위한 LCC-LCA 종합분석 모델 개발 및 사례적용)

  • Ahn, Hye-Ryeon;Lim, Jin Ho;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.585-593
    • /
    • 2013
  • For a successful construction project, systematic and objective decision-making is a prerequisite from the planning and designing stages. However, previous LCC analysis methods have focused only on simple cost savings and the accompanying economic efficacy while missing the environmental aspects of a structure. Although recently, a new approach of integrated $CO_2$ analysis has been introduced, which is more advanced than the existing simple LCC methods, it is difficult to collect all of the data necessary for each evaluation item since the product-specific cost is not presented under the LCC. In this research, cost evaluation items were selected by relatively high weights and items with heavy influence over a decision-making process in order to suggest an LCC-LCA integrated analysis model that is useful in comprehensively assessing the economic cost and environmental cost throughout the whole life cycle of a structure. The developed LCC-LCA integrated analysis model was applied to actual practices and compared with previous methods to test the model's effectiveness.

Application of Data Dictionary to BIM for Small and Medium Project (중소규모 사업용 BIM을 위한 데이터 사전의 활용)

  • Lee, Hwan Woo;Lee, Kyung Sub;Kim, Kwang Yang
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.6
    • /
    • pp.431-438
    • /
    • 2013
  • The systemization of construction information is required over whole life cycle of facilities to improve productivity of construction industry. BIM(Building Information Modeling) is a technology to manage information based on 3D information model. It has been actively suggested as one of the alternatives. However, it may be currently concentrated on the large project while the small and medium project based on BIM are slightly treated in indifference. In the case of small and medium project, the loss of information has been occurred more seriously than large project. However, it is hard to introduce BIM to the small and medium companies due to the lack of investment resources. This study has been performed to set up information management system based on BIM considering characteristics of small and medium project without excessive investment. In this study, pseudo BIM is defined as BIM for small and medium project. The concept of pseudo BIM has been suggested. The PLIB of ISO and construction information classification system of MOLIT in Korea are used to construct data dictionary for pseudo BIM. A pilot test is performed to verify the effectiveness of pseudo BIM.