• Title/Summary/Keyword: Building Life Cycle

Search Result 530, Processing Time 0.027 seconds

An Analysis of Local Quantity of Carbon Absorption, Fixation and Emission by Using GIS

  • Kim, Hyeon-Tae;Moon, Byeong-Eun;Choi, Eun-Gyu;Kim, Chi-Ho;Ryou, Young-Sun;Kim, Jong-Goo
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.22 no.1
    • /
    • pp.40-48
    • /
    • 2014
  • Due to increasing greenhouse gas emissions, global warming and abnormal weather phenomena it has become important on a national level to keep a count of greenhouse gases being emitted. We want to take advantage of any selected area, as the basic data for the calculation of greenhouse gas emissions, Forest and Grassland, Paddy fields, and Fields(crops), Greenhouse(crops), Pig farm, Cattle farm, Farm household(populations, agricultural machinery) and Vehicle, the basic building blocks shots with a small amount of per-unit basis, the statistics calculated based on regional carbon emissions through the literature and experimental. Carbon absorption 772,960 ton C/year, amount of fixation 487,477 ton C/year, amount of emission 1,112,607 ton C/year were noted in Gimje-si, and amount of carbon absorption 55,559 ton C/year, amount of fixation 25,864 ton C/year, amount of emissions 58,355 ton C/year in Gongdeok-myeon, respectively. The carbon absorption at Hwangsan-ri is 25,107 ton C/year, fixation 4,301 ton C/year, and emission 20,330 ton C/year respectively. We were able to estimate the amount of carbon according to the specific characteristics of each unit village, then expanding it to a large-scale and comparative analysis, therefore we were able to obtain basic data on the national levels of carbon absorption.

Corrosion Fatigue Cracking Propagation Characteristics and its Protection for the AL-Alloys of Shipbuilding (선박용 알루미늄 합금재의 부식피로균열 진전특성과 그 억제에 관한 연구)

  • Lim, Uh-Joh;Kim, Soo-Byung;Lee, Jin-Yel
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.25 no.2
    • /
    • pp.87-104
    • /
    • 1989
  • Recently, with the tendency of more lightening, high-strength and high-speed in the marine industries such as marine structures, ships and chemical plants, the use of the aluminium Alloy is rapidly enlarge and there occurs much interest in the study of corrosion fatigue crack characteristics. In this paper, the initiation of surface crack and the propagation characteristics on the base metal and weld zone of 5086-H116 Aluminium Alloy Plate which is one of the Al-Mg serious alloy(A5000serious) used most when building the special vessels, were investigated by the plane bending corrosion fatigue under the environments of marine, air and applying cathodic protection. The effects of various specific resistances on the initiation, propagation behavior of corrosion fatigue crack and corrosion fatigue life in the base metal and heat affected zone were examined and its corrosion sensitivity was quantitatively obtained. The effects of corrosion on the crack depth in relation to the uniform surface crack length were also investigated. Also, the structural, mechanical and electro-chemical characteristics of the metal at the weld zone were inspected to verify the reasons of crack propagation behavior in the corrosion fatigue fracture. In addition, the effect of cathodic protection in the fracture surface of weld zone was examined fractographically by Scanning Electron Microscope(S.E.M.). The main results obtained are as follows; (1) The initial corrosion fatigue crack sensitibity under specific resistance of 25Ω.cm% show 2.22 in the base metal and 19.6 in the HEZ, and the sensitivity decreases as specific resistance increases (2) By removing reinforcement of weldment, the initiation and propagation of corrosion crack in the HAZ are delayed, and corrosion fatigue life increases. (3) As specific resistance decreases, the sensitivity difference of corrosion fatigue life in the base metal and HAZ is more susceptible than that of intial corrosion fatigue crack. (4) Experimental constant, m(Paris' rule) in the marine environment is in the range of about 3.69 to 4.26, and as specific resistance increases, thje magnitude of experimental constant, also increases and the effect by corrosion decreases. (5) Comparing surface crack length with crack depth, the crack depth toward the thickness of specimen in air is more deeply propagated than that in corrosion environment. (6) The propagation particulars of corrosion fatigue crack for HAZ under initial stress intensity factor range of $\Delta$k sub(li) =27.2kgf.mm super(-3/2) and stress ratio of R=0 shows the retardative phenomenon of crack propagation by the plastic deformation at crack tip. (7) Number of stress cycles to corrosion fatigue crack initiation of the base metal and the welding heat affected zone are delayed by the cathodic protection under the natural sea water. The cathodic protection effect for corrosion fatigue crack initiation is eminent when the protection potential is -1100 mV(SCE). (8) When the protection potential E=-1100 mV(SCE), the corrosion fatigue crack propagation of welding heat affected zone is more rapid than that of the case without protection, because of the microfissure caused by welding heat cycle.

  • PDF

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

Prediction Model of Software Size for 4GL and Database Projects

  • Yoon, myoung-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.3
    • /
    • pp.1-7
    • /
    • 1999
  • An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building prediction methods for software size in fourth-generation languages and database projects. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset Ⅰ and Ⅱ, respectively. For the data set Ⅰ and Ⅱ, our proposed prediction method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.

  • PDF

A Study of Optimal Effort Allocation over Software Development Phase (소프트웨어 개발노력 치적 분배에 관한 연구)

  • Lee, Sang-Un;Kim, Young-Soo;Han, Pan-Am
    • The KIPS Transactions:PartD
    • /
    • v.9D no.5
    • /
    • pp.865-876
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.

Characteristics of Mechanical Properties at Elevated Temperatures and Residual Stresses in Welded joint of SM570-TMC Steel (SM570-TMC 강의 고온 시 기계적 성질 및 용접접합부의 잔류응력 특징)

  • Lee, Chin Hyunng;Chang, Kyong Ho;Park, Hyun Chan;Lee, Jin Hee
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.3
    • /
    • pp.395-403
    • /
    • 2006
  • Recently constructed bridges often have long spans and simple structure details considering not only the function but other important factors such as aesthetics, maintenance, construction duration and life cycle cost. Therefore, bridges require high-performance steels like extra-thick plate steels and thermo-mechanical control process (TMCP) steels. TMCP stels are now gaining wide attention due to their weldability improved strength and toughness. Recently, SM570-TMC steel, which is a high-strength TMCP steel with a tensile strength of 600 MPa, has been developed and applied to steel structures. However, using this steel in building steel structures requires the elucidation of not only material characteristics but also the mechanical characteristic of welded joints. In this study, high-temperature tensile properties of SM570-TMC steel were investigated through the elevated temperature welded joints of SM570-TMC steel were studied through the three-dimensional thermal elasticplastic analyses on the basis of mechanical properties at high temperatures obtained from the experiment.

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.

A Stduy on the Development of XML Schemata and STEP Model for Sharing Construction Drawings Information (건설도면정보 공유를 위한 XML 스키마 개발 및 STEP 연계기술에 관한 연구)

  • Kim, In-Han;Choi, Jung-Sik;Jo, Chan-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.9 no.3
    • /
    • pp.57-77
    • /
    • 2004
  • The main purpose of this study is to develop XML schemata and related STEP model for sharing construction drawings information. To achieve this purpose, the authors have developed a drawing information model based on STEP/AP202, the data searching mechanism based on STEP, and XML schemata for sharing and exchanging information between vector data and non-shape attribute information. Finally, the authors have suggested the way of sharing drawing information through linked STEP data and a XML schema using test cases of construction material information and code checking. The study shows a way of optimized managing and sharing construction information through the drawing information and external data for the whole building life-cycle, from early design stage to the construction stage.

  • PDF

A Building Method of Designing National Cyber Security Governance Model Through Diagnosis of Operational Experience (정보보안체계 운영경험 진단을 통한 국가 사이버보안 거버넌스 모델 연구 방법)

  • Bang, Kee-Chun
    • Journal of Digital Convergence
    • /
    • v.16 no.6
    • /
    • pp.205-212
    • /
    • 2018
  • This Study aims to propose a new information security governance model design method for streamlining security governance at national strategic level. The research method of this study is to diagnose our operational experience and to derive a new model design method. In the meantime, national information security activities were perceived to be focused on knowledge transfer, and motivation of activities and securing of executive power were weak. As a result, security blind spots and frequent occurrence of large security incidents have become unresolved challenges. National cyber security governance should be grouped together as a whole systematically from the upper policy to the lower level of performance under the responsibility of the national leader. Based on this approach, this study presented the comprehensive framework of Korean security governance model and embodied it into four architectural designs such as vision, goal, process, and performance, thus deriving the foundation for future national governance model design. Further research is needed to diagnose problems in life cycle flow, security policies based on environmental changes, and new frameworks in which all subjects participate.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.