• Title/Summary/Keyword: Building Integrated design

Search Result 473, Processing Time 0.026 seconds

Application of Lightself to Buildings as a Integrated Daylighting System (건축물 일체형으로서 광선반형 자연채광시스템의 건축물 적용기법에 관한 연구)

  • Kim, Jeong-Tai;Chung, Yu-Gun
    • KIEAE Journal
    • /
    • v.2 no.3
    • /
    • pp.17-24
    • /
    • 2002
  • For sustainable building design, using day lighting is considered a variable technique to save energy and create comfort indoor environments. Specially, the lightself as a integrated daylighting system is one of the most important techniques due to it's durability, availability and lighting performance. This paper aims to analyze the development and architectural application of a lightself system to buildings as a integrated day lighting system. For the study, advanced lightself systems developed in abroad such as "Integrated Enveloped and Lighting System", "Anidolic Daylighting System" and etc. are analyzed. Also, the architectural examples are investigated. As results, the new technologies such as optically treated reflective and sun-tracking are adopted to improve daylight performance. And, lots of environmentally friendly buildings are installed on integrated lightself system.

Study on the Optimal Capacity Design for Tri-generation System using PVT and GSHP (태양광열-지열 이용 Tri-generation 시스템의 적정 용량 설계를 위한 해석 연구)

  • Bae, Sangmu;Nam, Yujin
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.15 no.4
    • /
    • pp.16-23
    • /
    • 2019
  • Renewable energy systems are essential for the realization of zero energy building (ZEB). Moreover, the integrated system using solar and geothermal energy has been developed for heating, cooling and power of the building. However, there are few studies considering various design factors for system design. In this study, in order to develop the optimal design method for the system, the performance of the system was quantitatively compared and analyzed through dynamic simulation. Moreover, economic analysis was conducted based on the results of system performance. Through the performance and economic analysis results, the optimal design method of the tri-generation system was proposed.

Case Studies of Precast Facade Digital Design and Fabrication Strategies (사례 분석을 통한 프리캐스트 입면 디지털 설계 및 패브리케이션 전략)

  • Kim, Jin-Ho
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.8-18
    • /
    • 2019
  • Precast concrete manufacturing has proved economies of scale through the repetitive production by means of standardization, automation, and prefabrication. Advanced digital design and fabrication technologies can empower its benefits by enabling mass customization in the building design and construction. This study analyzed five case studies in terms of 1) design intent and background, 2) module development and facade construction, 3) integrated process among project stakeholder. This article has attempted to establish the following three points in conclusion: 1) Form generating digital design tools such as Rhino, CATIA, Generative Component, and Digital Project were implemented to produce parametric surface pattern and rationalization to maximize existing precast manufacturing benefits. Also, BIM program has been used to promote coordination and communication among engineering consultants and contractors, 2) In addition to traditional precast concrete materials, GFRC, RFP, brick cladding precast and 3D printed mould have been introduced to reduce the weight and cost and to comply the code from the zoning, seismic, and fireproof requirements, 3) Design-assist contract, design-assist financial support, and co-location measures have been introduced to facilitate collaboration between architect, fabricator, and contractor from the beginning of the project.

Prototyping-based Design Process Integrated with Digital-Twin: A Fundamental Study (디지털 트윈 개념을 적용한 프로토타이핑 기반 디자인 프로세스: 기초연구)

  • Kim, Jin-Wooung;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.9 no.4
    • /
    • pp.51-61
    • /
    • 2019
  • In the general manufacturing sector, prototyping used to reduce the risks that can arise with new conceptual products. However, in AEC area, it does not mass-produce a building, so the prototype itself becomes a building. Therefore, it is challenging to have prototyping of the same scale as the real thing, and the prototyping process in architecture is very inefficient. The prototyping process in the design stage typically assumes making a scaled model, partial model, or digital model. However, it is difficult for these models to correspond to the actual building and the environment of time and space such as scale, material, environment, load, physical properties and deformation, corrosion, etc., unlike the actual building. When using the digital twin concept in the prototyping process, it is possible to measure performance from the design stage to the operation stage. The digital twin was found by a method for monitoring based on physical twins and real-time linkage in the operation stage. Therefore, if the digital twin concept is applied at the design stage, it is possible to predict performance using not only current performance but also history information using real-time information. In order to apply the digital twin concept to the prototyping design process, we analyze the theoretical considerations and the prototyping design process of the digital twin, analyze the cases and research results where the prototyping design was applied, Provide an applied prototyping design process. The proposed process is tested through a pilot project and analyzed for potential use.

Development of Construction Cost Analysis Process Based on Structural Building Information Modeling (구조BIM기반 공사비 상세분석 프로세스 구축)

  • Lee, Seung-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF

The Spiral - 66 Hudson Blvd Supertall

  • Smilow, Jeffery;Chan, Patrick
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.1
    • /
    • pp.41-50
    • /
    • 2022
  • The Spiral, a supertall tower at the Hudson Yards Zoning District of NYC is an new iconic commercial office tower. The spiraling terraces throughout the height of the building creates unique outdoor spaces at each level for its occupants while introduces structural challenges unlike common office towers. Innovative structural solutions and an integrated connection design and steel detailing delivery process proved to be a key factor in the success of the project.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Freeform 3D Coordinate Control Technology using CNC Twisted Tube Method -Focused on The ARC in DaeGu- (CNC Twisted Tube공법을 이용한 비정형 3차원 좌표제어 기술 -대구 대표물문화관(디아크)를 중심으로-)

  • Kim, Sung-Jin;Ryu, Geun-seok;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.227-228
    • /
    • 2012
  • In contemporary architectural practice, flat sections and plan drawings are no longer a primary means of representation and communication with participants. A typical building design has an ornamental exterior wall system and a roof system that should have water-proof quality and drainage function. By comparison, distinction between exterior wall and roof are unclear in freeform buildings, and they are integrated into a concept of a building envelope. This study is to propose 3D coordinate control technology for freeform structure by CNC curved tube method in order to develop a BIM-based envelope design and construction method for freeform building. Because a much wider freeform building construction can be achieved with correct 3D data and easy-to-implement in construction field, the proposed 3D coordinate control technology is highly recommended for practical use instead of the conventional CAD system.

  • PDF

Rapid construction delivery of COVID-19 special hospital: Case study on Wuhan Huoshenshan hospital

  • Wang, Chen;Yu, Liangcheng;Kassem, Mukhtar A.;Li, Heng;Wang, Ziming
    • Advances in Computational Design
    • /
    • v.7 no.4
    • /
    • pp.345-369
    • /
    • 2022
  • Infectious disease emergency hospitals are usually temporarily built during the pneumonia epidemic with higher requirements regarding diagnosis and treatment efficiency, hygiene and safety, and infection control.This study aims to identify how the Building Information Modeling (BIM) + Industrialized Building System (IBS) approach could rapidly deliver an infectious disease hospital and develop site epidemic spreading algorithms. Coronavirus-19 pneumonia construction site spreading algorithm model mind map and block diagram of the construction site epidemic spreading algorithm model were developed. BIM+IBS approach could maximize the repetition of reinforced components and reduce the number of particular components. Huoshenshan Hospital adopted IBS and BIM in the construction, which reduced the workload of on-site operations and avoided later rectification. BIM+IBS integrated information on building materials, building planning, building participants, and construction machinery, and realized construction visualization control and parametric design. The delivery of Huoshenshan Hospital was during the most critical period of the Coronavirus-19 pneumonia epidemic. The development of a construction site epidemic spreading algorithm provided theoretical and numerical support for prevention. The agent-based analysis on hospital evacuation observed "arched" congestion formed at the evacuation exit, indicating behavioral blindness caused by fear in emergencies.

Conceptual Structural Design Method in Integrated Design System for Tall Buildings (초고층건물의 통합설계시스템에서 개념구조설계법 개발)

  • Song, Hwa-Cheol;Cho, Yong-Soo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.5 no.3 s.17
    • /
    • pp.75-82
    • /
    • 2005
  • The conceptual structural design consists of selecting structural material and form of the building, producing a preliminary dimensional layout. The information such as height of the building use, typical live load, wind velocity, design acceleration, maximum lateral deflection, span, story height is a important factor in conceptual design phase. In this case, the knowledge solutions for past similar problems cam be used in the process of defining and finding a solution to the design problems. In this paper, the conceptual structural design method using case-based reasoning which is intended to assist engineers in the conceptual phase of the structural design of tall buildings is introduced. Inductive retrieval method and nearest-neighbor retrieval method are used for selecting structural system and similar design case, respectively.

  • PDF