• Title/Summary/Keyword: Building Integrated design

Search Result 473, Processing Time 0.025 seconds

The Experimental Study on the Application of the Insulated Glass PV Module in the Curtain Wall (단열 복층유리 PV의 커튼 월 적용 가능성에 관한 실험적 연구)

  • Oh, Min-Seok;Kim, Hway-Suh
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.3
    • /
    • pp.63-69
    • /
    • 2006
  • In order to positively cope with the international environmental regulations like UNFCCC (UN Framework Convention on Climate Change) and to overcome energy crisis Korea, who depends on import for more than 97% of required energy, needs to continuously proceed to development, spread and expansion of alternativeenergy and then, to cultivate the capacity to keep the balance of demand and supply of energy by itself. In this aspect, the technology of BIPV (Building Integrated Photovoltaic) is the field that the world is most interested in. However, at present, this technology is centered on increasing the efficiency of the module itself so it has lots of problems to be applied to buildings. Application of the integrated PV system in building external curtain wall can obtain much more generation of electric power than in roof-types whose area for installation is restricted, so it is excellent in terms of its possibility of application. Therefore, this paper intends to advance its practical use by proposing how to get integrated PV system which can be applied to building external curtain wall, and how to apply it.

Digital Fabrication Integrated Architectural Design Process based on Lean startup (Lean startup 방법을 적용한 디지털 패브리케이션 통합 건축 설계 프로세스)

  • Jung, Jae-hwan;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.8 no.4
    • /
    • pp.23-33
    • /
    • 2018
  • Recently, the industry actively adopts the cutting-edge technologies of the fourth industrial revolution and uses them to enhance the productivity and service of mass-customization. The manufacturing industry is creating new processes and business models by achieving digital transformations through a lean start-up approach aimed at achieving the highest customer satisfaction with minimal resources. Although attempts are made to manufacture the building by introducing the latest technology in architecture, it is applied sporadically, not as an integrated system, in the entire phase of the architectural project. This paper analyzes the changes in the construction industry through the application of core technologies of the fourth industrial revolution. Design processes are analyzed for the digital transformation of the construction industry by case study of advanced architectural design practice. A novel design concept model 'Architectural lean startup' is proposed by combining the architectural process and the lean start up method. Through the design of the bus stop based on the architectural lean startup concept, it is confirmed that the designer repeats the 'Generate-Test-Analysis' to develop the design and generate the final result.

A Study on Building Integrated Design and Commissioning of GHP System (지열히트펌프 시스템의 건물통합설계 및 커미셔닝에 관한 연구)

  • Kim, Ji-Young;Jang, Jea-Chul;Kang, Eun-Chul;Chang, Ki-Chang;Lee, Euy-Joon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.169.1-169.1
    • /
    • 2010
  • Geothermal heat pump(GHP)system has been extensively disseminated due to the recent increasing demand over new and renewable energy. However, the economics and system reliability has been key issues and barriers to insure a better system performance as designed originally. The building integrated designs of geothermal heat pump system are test and optimize GHP system by evaluating its performance in virtual reality. System design is an iterative process that will help optimize the cost efficiency of the system. One of the primary goals is to minimize the energy imbalance between the amount of energy extracted from the ground and the energy reject to it. This will reduce the land area required to install the GHX, reduce the cost of installing it and ensure the long-term efficiency of the system. Commissioning is the process of ensuring that are designed, installed, functionally tested, and capable of being operated and maintained to performance in conformity with design intent. In this paper, Study on introduction of Initial commissioning method of Geothermal Heat Pump(GHP) system using ISO performance data has been introduced. Also KIER GHP Simulator is used to simulate actual heat pimp operating condition and test commissioning method. Result should that the experiment data base could verify the applicability of the commissioning method, and also were able to suggest a better ways to GHP commissioning.

  • PDF

Urban Density and the Porous High-Rise: The Integration of the Tall Building in the City - from China to New York

  • Klemperer, James von
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.2
    • /
    • pp.135-142
    • /
    • 2015
  • As the skyscraper matures as a building type, its role in actively connecting to, and reinforcing, major threads of urban fabric becomes increasingly more important. The creation of public spaces inside of and adjacent to tall buildings allows for significant additions to the public realm, facilitating better connections between varied uses, providing needed access to critical transportation functions. In this more integrated version of the tall building type, the density afforded by a vertical structure is complemented by strategically devised porosity of plan and section. This paper examines three major tower projects which exemplify a progressive approach to permeable design: the recently completed Jingan Kerry Centre in Shanghai, the Lotte Supertower in Seoul, now half completed, and the One Vanderbilt tower being proposed next to Grand Central Terminal in New York City. These projects suggest possibilities for innovative approaches to private development strategies, public planning processes, and architectural design.

Integrated Optimum Design and Cost Effectiveness Evaluation of Viscoelastically Damped Building Structures based on Life-Cycle Cost Minimization (생애주기비용 최소화에 의한 점탄성감쇠기 장착 빌딩구조물의 통합최적설계 및 비용효율성 평가)

  • Park, Kwan-Soon;Hahm, Dae-Gi;Koh, Hyun-Moo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.2 s.42
    • /
    • pp.17-27
    • /
    • 2005
  • This paper presents an integrated optimum design and a cost effectiveness evaluation method of a viscoelastically damped structural system. The criterion selected for the optimization is the minimization of the life?cycle cost which is a function of structural sizing variables and the amount of the viscoelastic damper. A genetic algorithm is used as a numerical searching technique in order to simultaneously find the optimum parameters of the integrated system. Optimal distributions of design variables according to various seismic characteristics are investigated by applying the proposed design method to a numerical example of a 10?story building structure. The cost effectiveness of viscoelastically damped structural system is also evaluated by comparing the life-cycle cost of the structure without viscoelastic dampers. The results show that the viscoelastic damper is effective in a region of low to moderate seismicity.

A Study on the Integrated Design Method of Architecture-Art-Nature found in Foundation Beyeler Museum (바이엘러 미술관에 나타난 건축-미술-자연의 통합 디자인 방법에 관한 연구)

  • Kim, Jong-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.2
    • /
    • pp.81-88
    • /
    • 2013
  • Foundation Beyeler museum located near Basel, Switzerland is one of the most-visited art museum of the world. Although the entire volume of the museum is not huge, its art collection as well as the well-known museum building designed by Renzo Piano deserve to attract many visitors. The initial design was started in 1991 when the city of Basel decided to fund and support the project. Through a couple of design stages, the museum was finally opened to public in 1997. There have been various research papers dealt with general design issues of Beyeler museum such as composition of exhibition spaces, and natural lighting. However, this paper aims to study the design methods and relationship between art, architecture and nature. Although the museum building is located on the site quietly, there are various specific design solutions to create unique spatial experience of art and nature at each parts. This study focuses on 4 parts of the museum that are located on the main circulation. How art, architecture and nature are integrated together is the main target of the analysis. The analysis is based on visual-perceptual experience and spatial configuration. In chapter 2, general background of the project was studied. In chapter 3, characteristics of the site's natural environment and Piano's design concept's were examined. In chapter 4, each parts were analyzed in detail with diagrams. In chapter 5 & 6, the spatial characteristics were compared together and the fundamental role of the museum architecture was concluded.

The Analysis of View and Daylights for the Design of Public Housing Complexes Using a Residential Environment Analysis System Integrated into a CAD System (주거환경분석시스템의 CAD 시스템 통합을 통한 공동주택단지설계 시 일조 및 조망분석에 관한 연구)

  • Park, Soo-Hoon;Ryu, Jeong-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.2
    • /
    • pp.137-145
    • /
    • 2007
  • This paper concerns about residential environment analysis program implementation for design and analysis on public housing complexes such that view and daylight analysis processes are automated and integrated into existing design routine to achieve better design efficiency. Considering the architectural design trends this paper chooses ArchiCAD as a platform for a CAD system, which contains the concepts such as integrated object-oriented CAD, virtual building and BIM. Residential environment analysis system consists of three components. The first component is the 3D modeling part defining 3D form information for external geographic contour models, site models and interior/exterior of apartment buildings. The second is the parametric library part handling the design parameters for view and daylight analysis. The last is the user interface for the input/output and integration of data for the environment analysis. Daylight analysis shows rendered images as well as results of daylight reports and grades per time and performs the calculations for floor shadow. It separates the site-only analysis from the analysis of site and exterior environmental parameters. View analysis considers horizontal and vertical view angles to produce view image from each unit and uses the bitmap analysis method to determine opening ratio, scenery ratio and void ratio. We could expect better performance and precision from this residential environment analysis system than the existing 2D drawing based view and daylight analysis methods and overcome the existing one-way flow of design information from 3D form to analysis reports so that site design modifications are automatically reflected on analysis results. Each part is developed in a module so that further integration and extension into other related estimation and construction management systems are made possible.

Characteristics Analysis of Evaluation Measures and Submission Requirements of Sustainable Design Awards -Comparison between AIA COTE Top 10 and Korea Green Building Awards- (완공작 친환경 건축물 공모전의 평가기준 및 제출요구자료 특성 분석 - AIA COTE TOP 10 공모전과 녹색건축대전의 비교를 중심으로 -)

  • Kim, Jin-Ho;Lee, Do-Gyun
    • KIEAE Journal
    • /
    • v.17 no.3
    • /
    • pp.59-67
    • /
    • 2017
  • Purpose: As we are facing the global crisis from the climate change and energy depletion, urgent actions are needed to design a integrated sustainable building. This paper suggests that a sustainable design awards can stimulate for architects to bring the cutting-edge ideas into a realized building in comparison to green building certification system. AIA COTE Top 10 design awards, organized and run by AIA(American Institute of Architects) COTE(Committee on the Environment) from 1997, is analyzed as a case study. By researching the core of the AIA COTE Top 10 design awards system in terms of evaluation measures and submission requirements, meaningful suggestions were drawn to supplement Korea Green Building Awards system and to design and realize leading green buildings in Korea. Method: The comparison between AIA COTE Top 10 and Korea Green Building Design Awards was made in terms of evaluation measures, submission requirements, and green building certification systems. Result: This paper finally suggests the following three points in conclusion: 1) Set the standards of evaluation measures reflecting the three aspects(economy, environment, social) of sustainability, 2) Set the qualitative evaluation measures and corresponding submission requirements that can apply in the design awards in comparison to green building certification system, 3) Develop and balance submission requirements in response to evaluation measures to proceed systematic evaluation of the green buildings.

Developing Intelligent Control Modules with LonTalk Protocol for Intelligent Building System & Home Automation

  • Hong, Won-Pyo;Kim, Dong-Hwa;Lee, Sung-Hak
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.355-361
    • /
    • 2002
  • There are many economic and operational reasons to integrate fire alarm signaling system with other building automation system. Integration of this requires open network with for the standard communication protocol and careful design practices. The important point for this is also the development of intelligent control modules for replacing the conventional zone adapter in fire system. Therefore, this paper proposes an new conceptual design of the open distributed fire alarm signaling system for the integration of BAS, a new intelligent control modules with LonTalk protocol and a new control modules for power line communication. Newly proposed additions to LonWorks network make it very well suited for integrating fire systems with other building automation sub-systems and another BAS with low cost. Additionally, it is very important that best design practices, test procedures and building codes need to be modernized to accommodate integrated building systems.

  • PDF

Serviceability Evaluation in Integrated Design System for Tall Building (초고층건물의 통합설계시스템에서 사용성 평가기법 개발)

  • Cho Yong-Soo;Kim Soo-Hwan;Song Hwa-Cheol
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.711-718
    • /
    • 2006
  • This paper aims to introduce a concept of the integrated structural design for the tall building using STEP(Standard for the Exchange of Product Model Data). STEP(ISO 10303) is an international standard for the computer-interpretable representation and exchange of product data and it provides a consistent data exchange format and application interfaces between different application systems. The structural systems for tall buildings are often controlled by the need to restrict wind responses at serviceability levels. In this study. the STEP entities for serviceability evaluation are proposed.

  • PDF