• 제목/요약/키워드: Building Costs

검색결과 809건 처리시간 0.029초

PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구 (A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members)

  • 손승현;김기호;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF

아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구 (A Basic Study on the Development of Profit Risk Management Model for Apartment Projects)

  • 손승현;이성호;한범진;나영주;김지명
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF

Development of a Descriptive Cost Effectiveness Model for a Subcontractor with Limited Resources

  • 김대영
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.40-48
    • /
    • 2017
  • It only takes one failed project to wipe out an entire year's profit, when the projects are not managed efficiently. Additionally, escalating costs of materials and a competitive local construction market make subcontractors a challenge. Subcontractors have finite resources that should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. The objective of this thesis is to identify the effect of productivity changes on the total cost resulting from shifting crews across projects using a descriptive model. To effectively achieve the objective, this study has developed a descriptive cost model for a subcontractor with multi-resources and multi-projects. The model was designed for a subcontractor to use as a decision-making tool for resources allocation and scheduling. The model identified several factors affecting productivity. Moreover, when the model was tested using hypothetical data, it produced some effective combinations of resource allocation with associated total costs. Furthermore, a subcontractor minimizes total costs by balancing overtime costs, tardiness penalties, and incentive bonus, while satisfying available processing time constraints.

Comparative investigation of the costs and performances of torsional irregularity structures under seismic loading according to TEC

  • Gursoy, Senol
    • Computers and Concrete
    • /
    • 제14권4호
    • /
    • pp.405-417
    • /
    • 2014
  • The poor seismic performance of reinforced concrete buildings during the latest earthquakes has become a serious issue in the building industry in Turkey. This case, designing new buildings without structural irregularities against earthquake loads reveals to be quite significant. This study mainly is focused on the effects of different torsional irregularities on construction costs and earthquakes performance of reinforced concrete buildings. In that respect, structural torsional irregularities are investigated based on the Turkish Earthquake Code. The study consists of major eight main parametric models. In this models consist of totally 49 models together with the variations in the number of storey. With this purpose, the earthquake performances and construction costs (especially steel quantities) of reinforced concrete buildings which having different structural torsional irregularities were obtained with the help of Sta4-CAD program. Each model has been analyzed by both the methods of equivalent earthquake loading and dynamic analysis. The obtained results reveal that the model-1 which has lower torsional irregularity coefficient shows the best earthquake performance owing to its regular plan geometry. Also, economical comparisons on costs of the torsional irregularity are performed, and results-recommendations are given.

송전요금을 고려한 게임이론적 전력거래분석 (A Cooperative Game Embedding Transmission Pricing in the Competitive Electricity Market)

  • 강동주;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.3-5
    • /
    • 2000
  • It has been the paradigm of game theory that more than two utilities compete and determine the price and amount of dispatch. In order for this theory to be available on real power system, it is necessary to consider the transmission costs as well as the generation costs. In addition Independent System Operator(ISO) should be able to mitigate the congestion, recover the transmission costs and provide information for long-term capacity investment by devising reasonable pricing schemes for the transmission services. Generators also have to take the transmission costs into account when building the bidding strategies. This paper proposes an approach to analyzing the profit maximizing game considering the transmission cost in a competitive electricity market.

  • PDF

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

도시 빅데이터: 모바일 센싱 데이터를 활용한 도시 계획을 위한 사회 비용 분석 (Urban Big Data: Social Costs Analysis for Urban Planning with Crowd-sourced Mobile Sensing Data)

  • 신동윤
    • 한국BIM학회 논문집
    • /
    • 제13권4호
    • /
    • pp.106-114
    • /
    • 2023
  • In this study, we developed a method to quantify urban social costs using mobile sensing data, providing a novel approach to urban planning. By collecting and analyzing extensive mobile data over time, we transformed travel patterns into measurable social costs. Our findings highlight the effectiveness of big data in urban planning, revealing key correlations between transportation modes and their associated social costs. This research not only advances the use of mobile data in urban planning but also suggests new directions for future studies to enhance data collection and analysis methods.

의류쇼핑 웹사이트 전환비용과 사이트 유지의 구조모델 (A Structural Modeling for Switching Costs and Site Retention in Apparel Shopping Website)

  • 김은영
    • 한국생활과학회지
    • /
    • 제21권6호
    • /
    • pp.1173-1184
    • /
    • 2012
  • This study estimates a structural model to examine the causal relationships among web browsing, switching cost, and site retention in the context of apparel shopping website. A total of 499 usable questionnaires were obtained from consumers aged from 20 to 49 years. For data analysis, exploratory factor analysis, confirmatory factor analysis and structural model were used. The result showed that consumer's perceived switching costs consisted of three factors: relationship cost, search cost and benefit loss cost. In estimated structural model, the relationship cost was influenced by leisure browsing; the search cost was influenced by informational browsing and leisure browsing; the benefit loss cost was influenced by leisure browsing. Especially, the leisure browsing was the most highly related to the benefit loss cost, and followed by relationship cost and search cost. However, hedonic browsing was not significantly related the factors of switching costs. The search costs significantly affected customer's intentions for site retention. A managerial implication was discussed for e-retailers in order to develop strategic switching costs in building long-term relationships with web browsers on the apparel shopping websites.

국내 전기공사 분야 실적공사비 적산제도 도입시 간접공사경비의 산정방안 (Estimation method of Overhead Costs for Historical Costs Estimation System of the Electrical Construction Works in Korea)

  • 손홍관;이형권;박민영;박인표;권용만;서순석;김광곤;김재현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.148-151
    • /
    • 2004
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system fur building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is supposed to reasonable estimation methods of overhead costs and profits.

  • PDF

A Neural Network Model for Building Construction Projects Cost Estimating

  • El-Sawalhi, Nabil Ibrahim;Shehatto, Omar
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.9-16
    • /
    • 2014
  • The purpose of this paper is to develop a model for forecasting early design construction cost of building projects using Artificial Neural Network (ANN). Eighty questionnaires distributed among construction organizations were utilized to identify significant parameters for the building project costs. 169 case studies of building projects were collected from the construction industry in Gaza Strip. The case studies were used to develop ANN model. Eleven significant parameters were considered as independent input variables affected on "project cost". The neural network model reasonably succeeded in estimating building projects cost without the need for more detailed drawings. The average percentage error of tested dataset for the adapted model was largely acceptable (less than 6%). Sensitivity analysis showed that the area of typical floor and number of floors are the most influential parameters in building cost.