• Title/Summary/Keyword: Building Costs

Search Result 809, Processing Time 0.026 seconds

A Study on the Escalation Method for Contract Adjustment Public Construction Project (물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구)

  • Bae Kyoung-Tae;Choi Dong-Soo;Hwang Chi Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

A Study on the Analysis of LCA tools for Eco-Building (친환경 건축물의 LCA 평가도구 비교분석 연구)

  • Son, Woo-Jin;Kang, Hae-Jin;Rhee, Eon-Ku
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.394-399
    • /
    • 2009
  • Since some decades ago, there has been a concern for resource depletion and environmental pollution associated with building properties. In addressing such impact of the built environment, there is a recognition of the existence of alternative building materials, fuels for energy supply as well as technologies for waste handling and disposal. Nevertheless, for long time, the choice between such alternatives was dictated by factors such as differences in prices and aesthetic values. A new important dimension in discriminating between different options is the environmental dimension. This aspect is important since buildings are one of the spatially big new additions to the natural environment that consume a lot of materials and energy during their long lifetime. Thus, with the environmental dimension kept in mind, a existing cost estimation needs to be changed. A new cost assessment method, Life Cycle Cost, should calculate overall costs with dimensional factors: investment and utility costs as well as maintenance costs over the lifetime of the building. Aiming to give an overview of the present status of Building Life Cycle Assessment(LCA) tools as a basis for further research and development including economic performance, this paper describes and compares 3 different tools for Life Cycle Assessment(LCA) and economic analysis of the green buildings. This paper compared these approaches based on various aspects. These include economic analysis method, evaluation duration, data of results(index). Use of the comparison analysis is to produce a better picture and indicate profits and shortcomings for the tools as a group; thus providing important direction improvement of LCA tool as well as further research and development of this group of tools.

  • PDF

Development of maintenance cost estimation method considering bridge performance changes (교량 성능변화를 고려한 유지관리비용 추계분석 방법 개발)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.717-724
    • /
    • 2018
  • To prepare for the explosive increase in maintenance costs of bridges according to the aging of infrastructure, future maintenance costs of bridges should be predicted. For this purpose, the management status of bridges was investigated and modeled as the upper limit of the performance level and the target management level according to the life cycle. This paper proposes methodologies and procedures for estimating the bridge maintenance costs using two models and existing cost and performance prediction models that consist of unit repair cost model according to the safety score, performance degradation model of bridges, unit reconstruction cost, and average reconstruction time. To verify the applicability, future maintenance costs can be forecasted for specific management agency considering the number of bridges, degree of aging, and current management status. As a result, it is possible to obtain the maintenance cost and safety level of an individual bridge level for each year. In addition, by summing them up to the agency level, the average safety score, ratio of the safety level, inspection costs, repair costs, and reconstruction costs can be obtained. In a further study, the changes in maintenance costs can be analyzed according to the changes in the target management levels using the developed method. The optimal management level can be suggested by reviewing the results.

The Life Cycle Cost Optimization Methodology as a Tool for Designing Apartment Units (공동주택 단위세대의 생애 비용 최적화 방법론 연구)

  • Park Tae Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.80-86
    • /
    • 2000
  • The future costs of energy and the cost of the repair of apartment buildings are expected to rise continuously in proportion to the initial costs. Therefore it has become important for these increasing costs to be incorporated and reflected in the design of the building. Systems such as structure and services for the buildings remain constant, but a number of the walls and windows can vary and thus have a major influence on the total construction and running costs of a building. The critical factor in the apartment unit design for the optimization of life cycle cost (LCC) is the ratio of the x and y axis of the walls in the unit plan. This paper demonstrates how to achieve the optimal size and thus optimize the LCC of the building.

  • PDF

Building Information Access on Grid Infrastructure

  • Prestipino, Frank
    • Proceedings of the CALSEC Conference
    • /
    • 2004.02a
    • /
    • pp.37-42
    • /
    • 2004
  • Information Quality Challenge ·Incomplete business process ·Islands of data ·Escalating costs ·No planned information architecture(omitted)

  • PDF

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

A Study on the Life Cycle Cost Analysis of the See-through a-si Building Integrated Photovoltaic System (투광형 비정질 BIPV 시스템의 LCC 평가에 관한 연구)

  • Lee, Han-Myoung;Oh, Min-Seok;Kim, Hway-Suh
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.1
    • /
    • pp.1-10
    • /
    • 2009
  • This study was carried out to evaluate the Life Cycle Cost(LCC) of three types of RTPV(Building Integrated Photovoltaic) systems-Glass plus Granite. Crystalline BIPV and See through Amorphous BIPV-which were vertically installed to generate the same power output(76 kW level). Initial investment costs. cost. savings and maintenance costs had been predicted during the period of analysing the LCC of three types of BIPV(Building Integrated Photovoltaic) systems installed for the purpose of evaluating the LCC. In case of cost savings, it had been analyzed by measuring the amount of electric power generated, reduction in lighting load and heat & cooling loads through simulation. From this analysis, it was predicted that the See-through amorphous BIPV offering cost saving advantages demonstrated the economical efficiency similar to the Class plus Granite when it is backed by more than 20 years of durability.