• Title/Summary/Keyword: Building Construction Factors

Search Result 1,140, Processing Time 0.03 seconds

Analysis of Cost-Increasing Factors in High-rise Building Construction Projects Using Delphi Method (델파이 기법을 이용한 초고층 건축시공의 공사비 상승요인 분석방법에 관한 연구)

  • Lee, Byeong-Hun;Jin, Hyun-Soo;Kim, Kyong-Hoon;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.105-109
    • /
    • 2010
  • Nowadays, the construction of high-rise building is rapidly increasing. There are many cost-increasing factors to the management in the high-rise building construction. For large and complex projects like the high-rise building construction, the more systematic methods and tools are needed for cost control. It is important to identify major cost control items and to manage them for effective cost management in the high-rise building construction. This study proposes a method of identifying major cost-increasing factors in the high-rise building construction based on the Delphi method.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

CRITICAL SUCCESS FACTORS OF A BUILDING DESIGN TEAM

  • T.H. Nguyen;M. Diab
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.9-18
    • /
    • 2007
  • The success of a building design team is achieved as a result of a combination of multiple events/factors and interactions, and has a great impact on the quality of the building construction process. While most of previous studies have focused on quality of the construction process, the success of a design team has not been completely investigated. This paper presents the critical factors that impact the success of a building design team and describes an assessment tool to measure the successful performance of the design team with respect to the critical factors. The development of the assessment tool employs the concept of quality function deployment (QFD), a technique to measure the service quality of an organization.

  • PDF

Identifying Potential Opportunities of BIM for Construction Risk Management (BIM을 이용한 건설리스크 해결 가능성 도출)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.201-202
    • /
    • 2019
  • This paper aimed to identify potential opportunities of building information modeling (BIM) utilization for construction risk management. Construction risk factors and BIM functions were derived through conducting in-depth literature review. Nineteen construction risk factors could be resolved by various BIM functions. Phase planning, site analysis, design authoring, and 3D design coordination were identified as the most efficient BIM functions for construction risk management.

  • PDF

A Study of Improvement Factors in the Construction Phase of the Building Project (건축프로젝트의 질 관리에 있어서 시공분야 개선요소에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.4
    • /
    • pp.293-300
    • /
    • 2006
  • Utilizing a building model design of the investigation factors and structured questionnaire, the results of an investigation concerning the improvement factors in the construction phase, as perceived by academic staffs including graduate students, designers, contractors and property management teams, are presented. Findings reveal that management commitment dominate improvement factors for building projects, although construction firms frequently mentioned the team work in design firms. Significant improvements in building projects are obtained when college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs cover quality training. Eighteen predominant selection factors are identified, ranked and correlated.

  • PDF

Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant (원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

Delay Factors in Building Construction Projects in Rwanda

  • Umuhoza, Esperance;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.5
    • /
    • pp.467-475
    • /
    • 2019
  • Delay is one of the most critical issues for construction projects and leads to huge losses in both developing and industrialized countries. The construction sector in Rwanda, a rapidly-developing nation, is no exception. Delays can be mitigated only once we have identify their primary causes, and these may not be the same in each region. This study aims to ascertain the main critical factors responsible for delays in building construction in Rwanda through an intensive literature review and questionnaire survey. A total of 40 delay causative factors were obtained from a literature review and were further classified into nine major categories. The questionnaire survey was distributed to about 80 respondents from clients, contractors, and consultants. From the list of 40 different factors, the top twelve most critical causes were identified as stoppage of work due to cash flow constraints, delay in approving design documents, confidentiality of physical plan, price fluctuations and delay in approving significant change, change orders, delay in performing inspections, Ineffective project planning, inadequate drawing details, unqualified labor, lack of materials on the market and dishonesty.

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects (건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구)

  • An, Sung-Hoon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

The Productivity and Importance Factors of Workers in Construction Site (국내 건설근로자의 생산성 관련 중요 요인 도출 및 중요도 조사)

  • Jung, Young-Chul;Moon, Joon-ho;Kim, Jin-Dong;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.73-74
    • /
    • 2011
  • Compared to the other industries, construction industry depends many parts of production activities on manpower. And also 3D perception on construction industry and the shortage of motivation in construction workers are the biggest reason to reduce construction productivity. So to solve this problem, the research of factors which affect more to improve the construction workers attitude in construction site will be needed. This research has investigated that the productivity and important factors was divided to economic factors, social factors, psychological factors. The result show that economic factors remain pre-eminent in influencing productivity, but that social factors and psychological factors appear to be of increasing importance in this construction industry.

  • PDF