공동주택 바닥의 구법 변화에 따른 충격음 차단성능에 관한 연구 (A Study on Impact Sound Performance accoring to Variation of Floor Construction Method in Apartment Building)

  • 김순만;지남용;김재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.97-101
    • /
    • 2003
  • Currently, it is increasing the importance of floor impact sound performance in apartment building due to users' various needs for comfortable residential environments. However, there are little date on floor impact sound performance because Korean apartment building floor is an ON-DOL which is made of several elements. In this study, floor impact sound performance according to variation of floor construction method were investigated. And based on these investigated results, datas can be used to supply constructor and comsumer basis data to estimate floor impact sound performance.

  • PDF

공동주택 바닥의 구법 변화에 따른 충격음 차단성능에 관한 연구 (A Study on Impact Sound Performance according to Variation of Floor Construction Method in Apartment Building)

  • 김순만;지남용;김재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.97-101
    • /
    • 2003
  • Currently, it is increasing the importance of floor impact sound performance in apartment building due to users' various needs for comfortable residential environments. However, there are little data on floor impact sound performance because Korean apartment building floor is an ON-DOL which is made of several elements. In this study, floor impact sound performance according to variation of floor construction method were investigated. And based on these investigated results, datas can be used to supply constructor and comsumer basis data to estimate floor impact sound performance

  • PDF

시공단계 탄소배출량의 건축물 용도별 차이 검정: 아파트와 학교를 중심으로 (Comparative study of the carbon emissions in the construction phase for different building usages: a case study of apartments and schools)

  • 강서경;강고운;유위성;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.221-222
    • /
    • 2015
  • Since the input data such as types and quantities of materials cannot be acquired during the planning and designing phases, it is difficult to estimate the carbon emissions from the construction phase. As the materials are closely related to the building usages, an approximate estimation by the usages can be suggested. However, before confirming the estimation, the difference test among the carbon emissions of the building usages should be implemented. This study executed t-test or Mann-Whitney test between apartments and schools. The result of the study statistically verified the significant difference between the carbon emissions of apartments and schools.

  • PDF

Construction of a 300-Meter Vertical City: Abeno Harukas

  • Mizutani, Kenichi;Hirakawa, Kiyoaki;Nakashima, Masato
    • 국제초고층학회논문집
    • /
    • 제4권3호
    • /
    • pp.199-207
    • /
    • 2015
  • Abeno Harukas is the tallest building in Japan and is located in Abeno, which is one of the three main railway transport nodes in Osaka. This building has a height of 300 meters, and its lowest levels are 30 meters below ground. It contains a department store, museum, offices, a hotel, and an observatory. In this urban renewal project, a section of the department store that encloses the station was dismantled and replaced by a supertall building complex, while infrastructure was simultaneously constructed, including: upgrades to the station and the existing department store, improved connections to the subway and pedestrian bridges, and a new pedestrian walkway over the road. In this paper, the ingenious erection processes, newly developed technologies, and precise construction management techniques are introduced for Japan's tallest building.

마감공사 생산성 향상을 위한 리프트 카 최적배치 모델 (Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

CRITICAL SUCCESS FACTORS OF A BUILDING DESIGN TEAM

  • T.H. Nguyen;M. Diab
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.9-18
    • /
    • 2007
  • The success of a building design team is achieved as a result of a combination of multiple events/factors and interactions, and has a great impact on the quality of the building construction process. While most of previous studies have focused on quality of the construction process, the success of a design team has not been completely investigated. This paper presents the critical factors that impact the success of a building design team and describes an assessment tool to measure the successful performance of the design team with respect to the critical factors. The development of the assessment tool employs the concept of quality function deployment (QFD), a technique to measure the service quality of an organization.

  • PDF

건축인허가 법규에 따른 BIM 정보 관리 방안 연구 (A Study on the Additional Properties Management Method for Building Code Automated Checking by BIM)

  • 김병주;김규용
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.211-212
    • /
    • 2023
  • Building Information Modeling (BIM) design has been mandatory in Korea since 2016, and it has been gradually expanding in the industry, with a slow attempt to apply it in remodeling constructions. This is because Korea is facing a situation where many buildings are over 30 years old and require remodeling or reconstruction. The remodeling industry is also a growing market, as it saves construction time and cost compared to reconstruction. BIM is an ideal technology element for a competitive remodeling construction, as remodeling constructions face a complicated construction process from the start, including demolition, maintenance, and reinforcement to save the change process. However, there are still limitations in applying BIM to remodeling constructions, due to considerations of the existing building and the complicated requests of the inhabitants. BIM still has technical and environmental limitations for general use. In this study, I analyzed BIM application cases from existing studies and suggest what improvement points should be strengthened.

  • PDF

READINESS OF NIGERIAN BUILDING DESIGN FIRMS TO ADOPT BUILDING INFORMATION MODELLING (BIM) TECHNOLOGIES

  • Mu'awiya Abubakar;Yahaya Makarfi Ibrahim;Kabir Bala
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.640-647
    • /
    • 2013
  • Building Information Modelling (BIM) has become the new international benchmark for efficiency in design, construction and maintenance of buildings. It is the platform that brings about collaboration between project stakeholders and improvement of project outcomes. With all its potentials, not much of the impact of BIM technologies has been felt in the Nigerian construction industry. This research aimed at assessing the readiness of the Nigerian building design firms to adopt BIM technologies. The research was exploratory in nature. A field survey was conducted with the use of structured questionnaire, self administered to a sample of building design consultancy firms (architectural, structural, M&E, quantity surveying, and multi-disciplinary design firms) within Abuja and Kaduna. The questionnaire sought the perception of the responding firms on the factors affecting BIM adoption in the Nigerian construction industry, and their level of readiness to adopt BIM technologies in their practices based on the four categories of readiness-management, people, process and technology. 42.26% response rate was achieved and used for analysis. ANOVA and DUNCAN post-hoc tests were used to establish the differences between the responses of the groups of firms, while means and standard deviations were obtained to establish the important factors affecting BIM adoption in Nigeria. The survey revealed that all the groups of Nigerian design firms are appreciably ready for the adoption of BIM technologies in their practice, with slight variations in their respective levels of readiness. 'Lack of awareness of BIM technology among professionals' and clients and 'lack of knowledgeable and experienced partners' were identified as the most important barriers of BIM adoption in Nigeria; while the most significant drivers are 'availability of well trained professionals' and 'cooperation and commitment of professional bodies to the adoption'. Education and training of building design professionals and cooperation of all stakeholders in the design and construction supply chain were recommended as part of measures to ensure successful adoption of BIM in the Nigerian construction industry.

  • PDF

건축공사 공종별 기후요소 영향도 분석 (An Analysis of the Effect of Weather Condition with Work Sections in Building Construction)

  • 김백중;서장우;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.141-144
    • /
    • 2006
  • The building construction is an essential field to consider weather condition because construction works are performed in a site. From this reason, this study evaluated the effect of weather condition with work sections in building construction by Analytic Hierarchy Proces (AHP) method. The results of this study as follows : (1) The effect of weather condition with work sections is affected by rainfall in summer season, and by a low temperature in winter season (2) The effect of weather condition with work sections is 0.235 for mold work, 0.210 for concrete work, 0.181 for steel-frame work.

  • PDF

초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델 (Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction)

  • 남철우;권재범;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF