• Title/Summary/Keyword: Bridge Road

Search Result 435, Processing Time 0.033 seconds

Application of Horizontal Subgrade Reaction Modulus to Bridge Abutment Design after Soil Improvement (연약지반 개량후 교대구간 수평지반반력계수 적용 사례)

  • Kim, Kyung-Tae;Park, See-Boum;Kim, Chang-Hyun;Lee, Jong-Bum;Yoon, Yea-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1228-1236
    • /
    • 2006
  • In soft ground, There are many case that Bridge Abutment is constructed after soil improvement in order to reduce the Negative Friction and prevent from Lateral Soil movements of Bridge Abutment. That section of Horizontal Subgrade Reaction $Modulus(K_h)$ derivation has much important mean due to Horizontal Stability of Abutment. It is come from behavior of Pile and Soil within depth of $1/\beta$. After Soil Improvement, however, If Bridge Abutment was construction, It's not impossible to carry out Field Investigation After Ground of Improved at design stage. Therefore, It's not able to derivate Horizontal Subgrade Reaction $Modulus(K_h)$. Therefore, in this case of study compare with Field Construction Test Data in order to derivation of Horizontal Subgrade Reaction $Modulus(K_h)$ and Reliability in terms of ground of Bridge Abutment by Sand Compaction Pile(SCP) during design of The 2nd Bridge Connection Road of Incheon International Airport. In this paper determine, Soil Property(The rate of strength increase, $c_u$ so on) and Horizontal Subgrade Reaction $Modulus(K_h)$ after soil improvement at design stage.

  • PDF

Performance Evaluation of Bridge Deck Materials based on Ordinary Portland Cement Concrete (보통 포틀랜드 콘크리트 기반 교면포장 재료 성능 평가)

  • Nam, Jeong-Hee;Jeon, Seong Il;Kwon, Soo Ahn
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.129-137
    • /
    • 2017
  • PURPOSES : The purpose of this study is to develop bridge deck concrete materials based on ordinary Portland cement concrete, and to evaluate the applicability of the developed materials through material properties tests. METHODS : For field implementation, raw material (cement, fine aggregate, and coarse aggregate) properties, fresh concrete properties (slump and air content), strength (compressive, flexural and bond strength) gain, and durability (freeze-thaw resistance, scaling resistance, and rapid chloride penetrating resistance) performance were evaluated in the laboratory. RESULTS : For the selected binder content of $410kg/m^3$, W/B = 0.42, and S/a = 0.48, the following material performance results were obtained. Considering the capacity of the deck finisher, a minimum slump of 150 mm was required. At least 6 % of air content was obtained to resist freeze-thaw damage. In terms of strength, 51.28 MPa of compressive strength, 7.41 MPa of flexural strength, and 2.56 MPa of bond strength at 28 days after construction were obtained. A total of 94.9 % of the relative dynamic modulus of elasticity after 300 cycles of freeze-thaw resistance testing and $0.0056kg/m^2$ of weight loss in a scaling resistance test were measured. However, in a chloride ion penetration resistance test, the result of 3,356 Coulomb, which exceeds the threshold value of the standard specification (1000 Coulomb at 56 days) was observed. CONCLUSIONS : Instead of using high-performance modified bridge deck materials such as latex or silica fume, we developed an optimum mix design based on ordinary Portland cement concrete. A test construction was carried out at ramp bridge B (bridge length = 111 m) in Gim Jai City. Immediately after the concrete was poured, the curing compound was applied, and then wet mat curing was applied for 28 days. Considering the fact that cracks did not occur during the monitoring period, the applicability of the developed material is considered to be high.

Development of Road Bridge Information Management System based on Internet (교량 현황정보 관리를 위한 인터넷 기반 정보시스템 개발)

  • Park, Kyung-Hoon;Sun, Jong-Wan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.716-723
    • /
    • 2016
  • A computerized information management system of road bridges as a national key infrastructure is needed to effectively collect data of the current status, improve the reliability of data, and use the results from the analysis of the accumulated data as fundamental resources for supporting the establishment of policies. The Internet-based Bridge Information System (BIS), including a database and geographic information systems (GIS), was designed, and the data items were comprised of essential information, such as GIS-based location coordinates, bridge condition grade information and so on. The BIS was developed to be connected with a related information system, and it is possible to make the current information of traffic volume, address and so on by adopting the GIS. To enhance the reliability of the information of current bridge status, it is also possible to improve the accuracy of data through an information verifying function to prevent entry errors. In addition, the BIS can easily support the establishment of policies offering various types of knowledge information that were available in the past based on an analysis of the accumulated data. The intuitive identification and analysis of the current status is to be feasible through a GIS screen. Improvement of the business efficiency and data accuracy and time-series information analysis are available by managing the information of current status through BIS. In the future, it is expected that BIS can be used effectively for the establishment of reasonable maintenance policies of the nation.

Characteristics of Non-point Pollutants from the Road Runoff (1): Water Quality (도로노면 유출수의 비점오염원 배출 특성(1): 기본 수질 항목)

  • Park, Sangwoo;Oh, Jeill;Choi, Younghwa;Seo, Jeongwoo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.2
    • /
    • pp.225-233
    • /
    • 2007
  • Road runoff water is one of the non-point sources (NPSs) of pollution negatively influencing drinking water source. Numerous road runoff NPS waters have been studied for over the last decade. However, the sources of pollution can be conditional, seasonal, or accidental. Therefore, measurement of pollutant loadings in different site is necessary to estimate the effect of road runoff water. The objective of this study was to examine the quality of road runoff water from a city bridge in Seoul, Korea. This study was conducted for two years to assess annual discharge pollution loads. In this study, key water quality parameters including chemical oxygen demand ($COD_{Cr}$), biochemcial oxygen demand ($BOD_5$), total nitrogen (T-N), total phosphorus (T-P), and suspended solid (SS) were measured at 18 different events. The results showed that typically the pollutant concentrations are higher at the beginning of each event and decrease afterwards. The first 20% of the volume of the runoff from each event is transporting 46% ($COD_{Cr}$), 48% ($BOD_5$), 50% (T-N), 34% (T-P), 30% (SS), respectively. The event mean concentrations (EMCs) were $COD_{Cr}$ (199 mg/L), $BOD_5$ (41.2 mg/L), T-N (7.97 mg/L), T-P (0.42 mg/L) and SS (113 mg/L). Although the results were consistent with the previous study (Barbosa and Hvitved-Jacobsen, 1999), $COD_{Cr}$, $BOD_5$, T-N exhibit a stronger first flush effect compared to the other contaminants.

Analysis of Environment Emission Characteristics Each Construction Type for Road Field (국도건설공사 도로분야의 공종별 환경부하량 특성분석)

  • Kim, Sang-Ryong;Lee, Dong-Eun;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.143-151
    • /
    • 2017
  • Recently Korea has presented carbon emission reduce goal of 37% compare to BAU until 2030 according to Paris Agreement in order to correspond to climate change. For this, researchers need to study positively on construction industry that emit $CO_2$ of $3^{rd}$ volume of 28 industry classification. This study calculated environmental load by LCA using the road part except tunnel and bridge among national road cases completed already. After selecting representative type of large construction type based on environmental emission, earth works, drainage works and paving works took up 84%. And this study analyzed the environmental emission feature of each detail construction type after selecting representative type each detail construction type. Utilization of each construction type emission attribute to environmental load during national road construction, will be helpful in making decision of eco-friendly national road construction based on environmental emission.

A Research for the Determinant Factors of Safety Ratings in Road-Bridge (도로교량의 안전등급 결정요인에 관한 연구)

  • Hur, Youn-Kyoung;Lee, Hong-Il;Shin, Ju-Yeoul;Park, Cheol-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.229-237
    • /
    • 2010
  • This study analyzes the factors that affect the safety condition level of road-bridges, one of the important infrastructures. Utilizing Binary Logit model, this report empirically identifies the key factors that has influenced the recent assessed safety condition level of the first and the second major types of road-bridges, managed by public agencies, and the changes of the safety level for last six years. As a result of the analysis, the most important factor that influences the safety condition level is not the physical characteristics, but the management quality. As road-bridges are getting older and older, the management quality tends to bring about more differentials in assessing the safety condition level. The safety condition level, C or D, is likely to be improved the level, A or B, is likely to become degraded. To achieve the goal that keep the safety condition level, A and B, more than 90%, it should be considered to make the degrading rate from B to C lower. However, this study includes the limitation on data. It is essential to collect structure data that are spread out in many agencies to complement the limitation for further research.

A Study on the Head of PHC Repair Applying the Reinforcement of Bending the Rebar (절곡보강철근을 적용한 PHC말뚝의 머리보강에 관한 연구)

  • Hong, Suk-Hee;Park, Hong-Sick;Kim, Eun-Kyum
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2450-2455
    • /
    • 2011
  • The importance for the department combined is increased concerning structures and pile foundation with the introduction of structures in sesmic design of structures. Therefore, the railway bridge and the road bridge standards approach for the earthquake about above the department combined by using strong coupling. Also, mechanical interpretation is performed as foundation combined with the head of pile foundation assuming the pillars. Accordingly, this study suggests the head of PHC repair can enhance the load carrying capacity and constructability of the department combined after bending, pulling, shear and compressive tests by appling the reinforcement of bending the rebar, the reinforcement of pulling the rebar.

  • PDF

A Study on the Seisemic Performance Method for R.C bridge by using the Finite Element Analysis Program (유한요소해석 프로그램를 이용한 R.C교각의 내진성능 평가 기법 연구)

  • Park, Yeoun-Soo;Choi, Sun-Min;Lee, Byung-Geun;Seo, Byung-Chul;Park, Sun-Joon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.301-306
    • /
    • 2008
  • The present seismic analysis of Road-Bridge Design Standard is on a basis of load-vased analysis which lets structures have the strength over load. In this study, the capacity spectrum method, a kind of displacement based method, which is evaluated by displacement of structure, is presented as an alternative to the analysis method based on load. Seismic capacity is performed about the existing reinforced concrete pier which has already secured seismic design by capacity spectrum method. As a result, capacity spectrum method could realistically evaluate the non-elastic behavior of structures easilly and quickly and the displacement of structures for variable ground motion level. And it could efficiently apply to an evaluation of seismic capacity about the existing structures and a verification of design for capacity target of the structure. We propose the seisemic performance method by using the Finite Element Analysis Program.

  • PDF

A Study on the development of GEOCON for the Geometry Control of Precast Segmetnal Bridges (II) (프리캐스트 세그멘탈 교량의 선형관리를 위한 GEOCON의 개발에 관한 연구(II))

  • 이환우;김종수;곽효경
    • Magazine of the Korea Concrete Institute
    • /
    • v.10 no.2
    • /
    • pp.127-135
    • /
    • 1998
  • 프리캐스트 세그멘탈 교량의 3차원적인 선형관리를 수행할 수 있는 S/W로서 GEOCON이 개발되었다. GEOCON은 기본적으로 제작장에서 세그멘트 제작관리를 통한 선형관리를 실시하고, 그 결과로서 자동적으로 계산되는 제작선형은 가설시 선형관리에 활용된다. 본 논문에서는 실제 현장에서 나타날 수 있는 검측오차등으로 인하여 수치계산상으로는 마치 정확한 선형관리가 이루어지는 것으로 나타날 수 있는 상황들을 방지하기 위해 GEOCON에서 채택하고 있는 기술적인 특징들에 대하여 논하고 있다. 또한 실제 현장적용을 통하여 GEOCON의 효용성을 검증하였다. GEOCON을 통하여 선형관리된 부산항 배후도로 현장은 총 길이 2109m의 프리캐스트 세그멘탈 교량구간을 포함하고 있으며 고임판의 사용없이 허용 관리치 내에서 매우 정확한 선형관리가 이루어졌다.

A Case Study Of Stability Examination About Slope Under Pier (교각 하부사면에 대한 안정성 검토 사례연구)

  • Bae, Sung-Woo;Shin, Chang-Gun;Seo, Jeong-You
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.712-721
    • /
    • 2010
  • Our country is composed of about 70% mountain district. Therefore the tunnel and the bridge are used plentifully in the road. The bridge the establishment location of the pier according to ground condition and the route is executed from various condition. this study leads and stability investigation and reinforcement instance there is a goal which presents an example about investigation.

  • PDF