• Title/Summary/Keyword: Box-Culvert

Search Result 74, Processing Time 0.016 seconds

Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings (국가 표준도를 이용한 토목 구조물 BIM 파라메트릭 라이브러리 구축에 관한 연구)

  • Kim, Cheong-Woon;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.128-138
    • /
    • 2014
  • Development of infrastructure component libraries is a critical requirement for the accelerated adoption of BIM in the civil engineering sector. Libraries reduce the time for BIM model creation, allows accurate quantity take offs, and shared use of standard models in a project. However, such libraries are currently in very short supply in the domestic infrastructure domain. This research introduces library components for retaining walls and box culverts generated from 2D standard drawings made publicly available by MOLIT. Commercial BIM software was used to create the concrete geometry and rebar, and dimensional/volumetric parameters were defined to maximize the reuse and generality of the libraries. Use of the these libraries in a project context demonstrates that they allow accurate and quick quantity take offs, and easier management of geometric information through the use of a single library as to numerous 2D drawings. It also demonstrates the easy modification of the geometries of the components if and when they need to changed. However, the application also showed that some of the rebar components (stirrups and length wise rebars) do not get properly updated when concrete geometries are changed, demonstrating the limits of current software applications. The research provides evidence of the many advantages of using BIM libraries in the civil engineering, thus providing the incentive for further development of standard libraries and promoting the use of BIM in infrastructure projects.

An Experimental Study on the Estimation of Optimum Length of Soil Flow Protector with Wall Stiffness (벽체 강성에 따른 토사유입차단판의 최적 길이 산정에 관한 실험적 연구)

  • Yoo, Jae-Won;Seo, Min-Su;Son, Su-Won;Im, Jong-Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.789-799
    • /
    • 2019
  • The settlement hardly occurs in structures supported by pile foundation such as abutment, culvert but a cavity is formed in the lower part of a structure. As a result, soil discharged from the lateral ground to the cavity accelerates the settlement of the lateral ground of the structure, resulting in a larger settlement. Therefore, in order to prevent problems caused by cavity under the structure supported by pile foundation, soil Flow Protector (briefly called 'FLP'), which can be easily installed on the side of structure, was developed. In this study, an laboratory model test was carried out to prove the reduction effect of settlement and to estimate the optimal installation length of the FLP. As a result, the installation of the FLP reduced the settlement of the lateral ground and prevented the leakage of lateral ground soil into the cavity. If the stiffness of the FLP is small, the state or active earth pressure is generated in the upper part, which is not favorable for stability. But if the stiffness of the FLP is high enough, the passive earth pressure area is generated in the upper part, which will be advantageous for the stability. Also, the increased installation length of FLP is effective to reduce the settlement. And the ratio of the optimal length of the FLP to the box structure height (H = 250 mm) are flexible FLP 1.38, stiff FLP 0.73.

Investigation of Microorganism-Based Autonomous Crack Healing Agent and Full-scale Verification of Crack Healing (미생물 기반 자발적 콘크리트 균열치유제 성능 분석 및 실스케일 균열치유성능 검증)

  • Yeon-Jun Yoo;Byung-Jae Lee;Joo-Kyoung Yang;Yun Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.138-143
    • /
    • 2023
  • In this study, the crack healing performance of each crack healing agent manufacturing method was analyzed by adding crack healing agents in the form of alginate gel and spore suspension inoculated with endospores of calcium carbonate-forming bacteria to mortar. In addition, by applying it to an full-scale structure in the form of a box-type culvert, we attempted to create an environment in which the developed crack healing agent can be applied not only to a laboratory environment but also to an actual field. The crack healing agent using the dry heat drying method showed crack healing performance, but in the case of the freeze drying method, many spores were killed by freeze hardening and therefore the crack healing performance was lost. As a result of SEM and XRD pattern analysis of the presumed crack healing material extracted from the crack of a full-scale structure, it was found to be calcite, one of the calcium carbonate crystals produced by microorganisms applied to the crack healing agent. In conclusion, it was found that the crack healing by microorganisms can be implemented in a real structure.

The Efficiency and Improvement of the Highway Wild-Life Fences for Decrease of Mammals Road-kill - In Case of Manjong~Hongchun Section on Jungang Highway - (포유류 로드킬 저감을 위한 고속도로 유도울타리 효율성 및 개선방안 연구 - 중앙고속도로 만종~홍천 구간을 사례로 -)

  • Song, Jeong-Seok;Lee, Kyong-Jae;Ki, Kyong-Seok;Jun, Ik-Yo
    • Korean Journal of Environment and Ecology
    • /
    • v.25 no.5
    • /
    • pp.649-657
    • /
    • 2011
  • This study had targeted the Manjong Junction~Hongchun interchange section of Jungang highway in order to analyze the efficiency and improvement of the highway wild-life fences. Being analyzed wild-life fence as an effective facility for the prevention of road-kill, it had founded that the wild animals did not jump over even the two layer guardrail, concrete barrier and noise barrier, fence for rock fall. For the section with high road-kill decrease effect after installing the wild-life fence, the effect was higher at wild-life fence with the height of 1.0m where the door had not been installed and the well connected points of road facility than the area with fence height of 1.5m. The road-kill decrease effect was also high at the well managed areas even if the door has not been installed. Also, road-kill had occurred by concentrating around the end of wild-life fence after installing the fence, Moreover road-kill had also occurred around the cutting section. The door of wild-life fence had higher amount of road-kill occurrence as the installation interval was closer. it was analyzed that the door management has a lot of effect on road-kill decrease. The fence for rock fall, two layer guardrail and concrete barrier having the effect of wild-life fence installed on the road would have to be installed by connecting with wild-life fences through proper facility improvement. Although the door should not be installed if possible, it should be installed as automatic door or gravity door to prevent the door from leaving the door open. An escape route has to be formed for the prompt escape away from the road for the animals entered through the ending section of the fence. The eco-corridor has to be made by restoring the soil layer of dual purpose eco-corridor forming a planting area. Also, the dead body after the accident has to be disposed to the outer section of the road immediately in order to prevent the secondary road-kill by the predator from the road-kill. The fence has to be installed as 500m or longer in both ways, in other words 1,000m or longer, from the targeted spot of minimum accident prevention while connecting up to the bridge or box culvert, etc that are next road facilities if possible to guide wild animals safely to the eco-corridor.