• 제목/요약/키워드: Boulder Obstruction

검색결과 1건 처리시간 0.012초

연약지반 쉴드 터널 굴착시 전석장애물 탐지방법 및 보상문제 (Boulder Detection Methods and its Compensation for Obstruction in sonft Ground Tunnels by Shielded TBM)

  • 지왕률;하상귀
    • 한국철도학회논문집
    • /
    • 제9권1호
    • /
    • pp.110-117
    • /
    • 2006
  • Boulder detection methods and its compensation is discussed with consideration of boulder conditions in soft ground tunneling by shielded TBM. For analysis of proper compensation methods for boulder obstruction, its removal costs and cases on eight projects are presented. Compensation for boulder obstruction removal by volume or weight is not practical for most tunneling situation, but compensation by crew time is probably the most equitable method. If boulders are anticipated on project, boulder removal plan must be considered with proper equipment selection.