Deformation characteristics of tunnel bottom after construction under geological conditions of long-term deformation

  • Kim, Nag-Young;Park, Du-Hee;Jung, Hyuk-Sang;Kim, Myoung-Il
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.171-178
    • /
    • 2020
  • Mountainous areas cover more than 70% of Korea. With the rapid increase in tunnel construction, tunnel-collapse incidents and excessive deformation are occurring more frequently. In addition, longer tunnel structures are being constructed, and geologically weaker ground conditions are increasingly being encountered during the construction process. Tunnels constructed under weak ground conditions exhibit long-term deformation behavior that leads to tunnel instability. This study analyzes the behavior of the bottom region of tunnels under geological conditions of long-term deformation. Long-term deformation causes various types of damage, such as cracks and ridges in the packing part of tunnels, as well as cracks and upheavals in the pavement of tunnels. We observed rapid tunnel over-displacement due to the squeezing of a fault rupture zone after the inflow of a large amount of groundwater. Excessive increments in the support member strength resulted in damage to the support and tunnel bottom. In addition, upward infiltration pressure on the tunnel road was found to cause severe pavement damage. Furthermore, smectite (a highly expandable mineral), chlorite, illite, and hematite, were also observed. Soil samples and rock samples containing clay minerals were found to have greater expansibility than general soil samples. Considering these findings, countermeasures against the deformation of tunnel bottoms are required.

Design and Construction of Bottom Drainage Tunnel and the Watertight Tunnel (배수형 터널과 방수형 터널의 설계와 시공)

  • Kim, Seung-Ryeol;Park, Gwang-Jun;Park, Bong-Gi
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.49-58
    • /
    • 1993
  • Reappraisal of the design and the construction concept of the bottom drainage tunnel has been made through the seepage analysis. An appropriate design approach for this tunnel has also been proposed. It was revealed from this study that water pressures acting on the concrete lining in the bottom dralnage tunnel much depend on the permeability of the surrounding ground, the source of water supply and the discharge capacity of dralnage facilities. The full release of these water pressures by the current drainage system could not be expected if this type of tunnel is constructed in the ground including alluvial deposits having a high permeability. The necessity of a proper reinforcement of the concrete lining or a modification of its shapes corresponding to the water pressure has been suggested.

  • PDF

Upheaveal Behaviour of Tunnel Bottom in the Weatherd Fracture Zone under Tunnel Excavation (터널 굴착 중 바닥부 연약대로 인한 터널 융기 거동 사례 분석)

  • Chang, Yongchai;Kim, Nagyoung;Jin, Kyudong;Son, Yongmin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.49-56
    • /
    • 2014
  • The stability of tunnel construction depends entirely on the characteristics of the soil strength. If the soil strength is weak, collapse of tunnel occurs frequently under construction. In general, it copes with collapse by conducting half section excavation or reinforcement in advance under these conditions. Nevertheless, it can be collapsed under upper section excavation in the weathered fracture zone and it can be recovered through the application of reinforcement. As it has a bad influence on the upper section in case of upheaveal of tunnel bottom, it can be adversely affected on the overall stability of the tunnel. Thus, an in-depth review of reinforcement is needed in poor bottom ground. As the practices that has a bad affect on the stability of the tunnel due to upheaveal of tunnel bottom is increasing, research is needed for applicable standards for reinforcement. In this paper, it were investigated at actual field cases of upheaveal of bottom ground and characteristics of behavior and reinforcement measures were analyzed.

Hydraulic behavior of a subsea tunnel in a ground with fractured-zones (파쇄대를 통과하는 해저터널의 수리거동에 관한 연구)

  • Shin, Jong-Ho;Choi, Kyu-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1571-1580
    • /
    • 2008
  • Subsea tunnels that link land to island and among nations for transportation, efficient development of limited surface and pursuit of economic development should be designed to support pore water pressure on the lining. It is generally constructed in the bed rock of the sea bottom. When the tunnel excavation face meets fractured-zones below sea bottom, collapse may occur due to an increase of pore water pressure and large inflow. Such an example can be found in the Norwegian subsea tunnel experiences in 1980's. In this study hydraulic behavior of tunnel heading is investigated using numerical method based on the collapse of Norwegian subsea tunnel. The effect of pore water pressure and inflow rate were mainly concerned. Horse-shoe shaped model tunnel which has 50 m depth from the sea bottom is considered. To evaluate hydraulic performance, parametric study was carried out for varying relative permeability. It is revealed that pore water pressure has increased with an increase of sea depth. Especially, at the fractured-zone, pore water pressure on the lining has increased significantly. Inflow rate into tunnel has also increased correspondingly with an increase in sea depth. S-shaped characteristic relation between relative permeability and normalized pore water pressure was obtained.

  • PDF

A Study on the Groundwater Effects in the Design of Tunilel Lining (배수형 터널내 과다유입수가 터널의 안정에 미치는 영향)

  • Cheon, Byeong-Sik;Choe, Song-Am;Nam, Sun-Seong
    • Geotechnical Engineering
    • /
    • v.11 no.4
    • /
    • pp.125-140
    • /
    • 1995
  • Generally, the groundwater pressure is not considered in the design of concrete lining of bottom drainage tunnel. This design method implies that the phreatic surface is drawdown to the bottom of tullnel. When tile groundwater is continually supplied without changing of groundwater table, there is a possibility at which the groundwater pressure acting on the tunnel lining after the completion of tunnel. Therefore, the safety of tunnel lining must be checked in this case. In this paper, the stability of bottom drainage tunnel which is affected by groundwater discharge is analzed by using of the Finite Element Method at the 2 sections of subway where the groundwater level has a tittle change during the construction. As the result of analysis, the grouting for the water tightness and the permanent monitoring system of tunnel are required for maintaining of long-term stability of bottom drainage tunnel for the case of groundwater plassure acting on the tunnel lining is greater than that of design stage.

  • PDF

Analysis of temperature distribution per length in highway tunnel (공용중인 고속도로 터널내 연장별 온도 조사 분석)

  • Hong, Seung-Ho;Lee, Kyung-Ha;Kim, Nag-Young;Yun, Kyong-Ku
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.259-267
    • /
    • 2005
  • This paper analyzed characteristic of temperature change as well as bottom of tunnel with thermometer according to tunnel length and region during one year. And it measured temperature distribution near tunnel portal. In the paper it was known that tunnel entrance and exit have different characteristic temperature distribution in accordiance with bottom of tunnel per tunnel length. Temperature of tunnel changed from tunnel exit to fifty meter and distribution of tunnel temperature was established uniform regardless of tunnel length. But temperature distribution of tunnel changed in tunnel entrance differ from tunnel exit in the location of one hundred twenty five meter and one hundred fifty meter. Cold air inflowed from tunnel entrance have influenced with the location of one hundred twenty five meter and one hundred fifty meter.

  • PDF

Response analysis of tunnel lining considering pore pressure (수압을 고려한 터널 라이닝의 응답 해석)

  • Kim, Ki-Tae;Kim, Young-Jae;Park, Du-Hee
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.541-544
    • /
    • 2008
  • Generally numerical analysis of tunnel lining, under dynamic loading condition, performed not considering pore pressure. But if tunnel excavated under the surface of water, such as bottom of the sea, the river bed, tunnel lining can take pore water pressure. It may be different from evaluated numerical analysis not considering pore pressure. Therefore tunnel design should consider effect of water pressure acting on tunnel lining.

  • PDF

Dielectric Characteristics of Magnetic Tunnel Junction

  • Kim, Hong-Seog
    • The Journal of Engineering Research
    • /
    • v.6 no.2
    • /
    • pp.33-38
    • /
    • 2004
  • To investigate the reliability of the MTJs on the roughness of insulating tunnel barrier, we prepared two MTJs with the different uniformity of barrier thickness. Namely, the one has uniform insulating barrier thickness; the other has non-uniform insulating barrier thickness as compared to different thing. As to depositing amorphous layer CoZrNb under the pinning layer IrMn, we achieved MTJ with uniform barrier thickness. Toinvestigate the reliability of the MTJs dependent on the bottom electrode, time-dependent dielectric breakdown (TDDB) measurements were carried out under constant voltage stress. The Weibull fit of out data shows clearly that $t_{BD}$ scales with the thickness uniformity of MTJs tunnel barrier. Assuming a linear dependence of log($t_{BD}$) on stress voltages, we obtained the lifetime of $10^4$years at a operating voltage of 0.4 V at MTJs comprising CoNbZr layers. This study shows that the reliabilityof new MTJs structure was improved due to the ultra smooth barrier, because the surface roughness of the bottom electrode influenced the uniformity of tunnel barrier.

  • PDF

Prediction of Long-term Behavior of Tunnel in the Presence of Geological Anomalies (지질이상대가 존재하는 구간에서의 터널의 장기거동 예측)

  • Hoki Ban;Heesu Kim;Jungkuk Kim;Donggyou Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.8
    • /
    • pp.13-20
    • /
    • 2023
  • Tunnelling through the geological anomalies has widely known to have many difficulties such as bottom heave, crack of lining, squeezing and so on. To stabilize the tunnel during the construction or after construction, various reinforcing methods have been introduced and applied such as micropiling at the bottom of tunnel to prevent the bottom heave. In this study, long-term behavior of tunnel in the presence of geological anomalies was predicted using numerical analyses. To this end, material properties for swelling rock model capable of representing the rock swelling behavior was obtained using matching process with measured data to validate the adopted model. After the model validation, simulations were performed to predict the long-term behavior of tunnel in the geological anomalies.