본 연구에서는 제조업 분야에서 보편적으로 활용되어 온 제약이론을 바탕으로 강교 제작공장의 생산성을 향상시키기 위한 자원할당 방법론을 제안한다. 이를 위해 도장 공정을 병목공정으로 정의한 후, 공정 전용 자원할당(OSRA), 제품 전용 자원할당(PSRA), 범용 자원할당(GRA) 등 3가지의 자원할당 방법론을 개발하였다. 강교 공급사슬 시뮬레이션 모델을 활용한 성능평가 실험 결과, GRA 방법론이 재공재고수(NWIP)와 대기시간(WT) 측면에서 가장 우수한 성능을 보였다. 특히, 강교 제작공장의 부하와 부하 변동성이 증가할수록 다른 두 전용 자원할당 방식과의 성능 격차는 더욱 커졌다. 평균적으로 GRA는 NWIP과 WT를 OSRA 대비 36.2%, 34.6%, PSRA 대비 71.0%, 70.4% 감소시켰다. 재공재고수와 대기시간의 감소는 병목현상의 완화를 의미하며, 이는 결국 강교 제작공장의 생산성이 향상되었음을 의미한다.
This paper gives an attempt to build a decision support tool linked with a simulation software called ARENA for evaluating and comparing the performance of the push and pull material driven strategies operating in the flow shop environment with a bottleneck resource as the shop's constraint. To be fair for such evaluation, the comparison must be made fairly under the optimal setting of both systems' operating parameters. In this study, an optimal-seeking heuristic algorithm, Genetic Algorithm (GA), is employed to suggest a systems' best design based on the economic consideration, which is the profit generated from the system. Results from the study have revealed interesting outcomes, letting us know the strength and weakness of the push and pull mechanisms as well as the effect of each operating parameter to the overall system's financial performance.
All of the machines in a production line can be classified into bottleneck and non-bottleneck machines. A bottleneck is a resource whose capacity limits the throughput of the whole production facility. This paper addresses a batch sizing problem at the bottleneck machine. Traditionally, most batch sizing decisions have been made based on the EOQ (economic order quantity) model where setup and inventory costs are considered while throughput rate is assumed to be given. However, since batch size affects the capacity of the bottleneck machine, the throughput rate may not be constant. As the batch size increases, the frequency of the setup decreases. The saved setup time can be transferred to processing time, which results in higher throughput. But, the larger batch size may also result in longer lead time and larger WIP inventory level. This paper presents an alternative method to determine batch size at the bottleneck machine in a manufacturing line. A linear search algorithm is introduced to find optimal throughput rate and batch size at the same time. Numerical examples are provided to see how the proposed method works and to investigate the effects of some parameters.
This paper addresses an AGV dispatching problem in semiconductor clean-room bays where AGVs move cassettes of wafers between machines or machines and a central buffer. Since each machine in a bay has a local buffer of limited capacity, material flow should be controlled in a careful way to maintain high system performance. It is regarded that two most important performance measures in a semiconductor bay are throughput rate and lead-time. The throughput rate is determined by a bottleneck resource and the lead-time depends on smooth material flow in the system. This paper presents an AGV dispatching procedure based on the concept of theory of constraints (TOC), by which dispatching decisions are made to utilize the bottleneck resource at the maximum level and to smooth the flow of material. The new dispatching procedure is compared with existing dispatching rules through simulation experiments.
In existing wireless ad-hoc networks, how to distribute network resources fairly between many users to optimize data transmission is an important research subject. However, in wireless mesh networks (WMNs), it is one of the research areas to avoid gateway bottleneck more than the fair network resource sharing. It is because WMN traffic are concentrated on the gateway connected to backhaul. To solve this problem, the paper proposes Weighted Fairness Time-sharing Access (WFTA). The proposed WFTA is a priority time scheduling scheme based on Weighted Fair Queuing (WFQ).
최근 GPU가 그래픽 처리뿐 아니라 다양한 분야의 병렬 처리로 그 영역을 넓혀가고 있다. 그러나, 현재 GPU는 워크로드의 다양성을 반영하기보다 간결한 제어 구조를 통한 개별 워크로드의 병렬성 극대화에 초점을 맞추고 있다. 본 논문은 워크로드 특성을 반영한 GPU 작업 배치를 위해 GPU에서 수행되는 워크로드의 자원 사용 특성을 컴퓨팅 바운드형, 메모리 바운드형, 실행종속 지연형으로 분류한 후, 각 분류에서 병목점이 되는 세부 자원을 규명한다. 예를 들어 컴퓨팅 바운드형의 경우 단정밀도 연산장치, 배정밀도 연산장치, 특수함수 연산장치 등 병목 자원이 무엇인지 분석한다. 본 논문의 분석 결과는 동일한 컴퓨팅 바운드형 워크로드라도 병목이 되는 세부 자원이 다를 경우 함께 배치하는 것이 성능 충돌을 일으키지 않는다는 점을 규명하여 GPU 작업배치의 효율화에 기여할 것으로 기대된다.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.201-208
/
2011
Today's highly competitive construction scenario forces all the major players in the field to take up multiple projects which have put an undue pressure on the resources available within the organization. Under such a situation, there are many instances where in the resource requirement exceeds its availability due to multiple activities (with same resource requirement) which are scheduled to start simultaneously and thus results in the constrained resource becoming a bottleneck of the project. As a consequence of sharing resources, this paper studies the impact on the completion date of two similar projects under two different conditions, the first one resulting in a postponed end date and the second without any postponement. The resource utilization, the possibility of substitution of a resource and its subsequent impact on the deadline of the project is analyzed under these two circumstances. The study is done on a Critical Chain Project Management (CCPM) platform instead of leaving the schedule with a traditional Critical Path Method (CPM) finish, which gives an added advantage of validating the robustness of the emerging CCPM trend in the field of resource management.
Kim, Hyun-Chul;Lee, Dong-Man;Chon, Kil-Nam;Jang, Beak-Cheol;Kwon, Tae-Kyoung;Choi, Yang-Hee
Journal of Communications and Networks
/
제12권1호
/
pp.52-66
/
2010
Since large objects consume substantial resources, web proxy caching incurs a fundamental trade-off between performance (i.e., hit-ratio and latency) and overhead (i.e., resource usage), in terms of caching and relaying large objects to users. This paper investigates how and to what extent the current dedicated-server based web proxy caching scheme is affected by large file transfers in a high bandwidth campus network environment. We use a series of trace-based performance analyses and profiling of various resource components in our experimental squid proxy cache server. Large file transfers often overwhelm our cache server. This causes a bottleneck in a web network, by saturating the network bandwidth of the cache server. Due to the requests for large objects, response times required for delivery of concurrently requested small objects increase, by a factor as high as a few million, in the worst cases. We argue that this cache bandwidth bottleneck problem is due to the fundamental limitations of the current centralized web proxy caching model that scales poorly when there are a limited amount of dedicated resources. This is a serious threat to the viability of the current web proxy caching model, particularly in a high bandwidth access network, since it leads to sporadic disconnections of the downstream access network from the global web network. We propose a peer-to-peer cooperative web caching scheme to address the cache bandwidth bottleneck problem. We show that it performs the task of caching and delivery of large objects in an efficient and cost-effective manner, without generating significant overheads for participating peers.
Digital Manufacturing-based production could be very effective in shipbuilding in order to save costs and time, to increase safety for workers, and to prevent bottleneck processes in advance. Digital shipbuilding system, a simulation-based production tool, is being developed to achieve such aspects in Korea. To simulate material flow in a subassembly line at a shipyard, the product, process and resources was modeled for the subassembly process which consisted of several sub-processes such as tack welding, piece alignment, tack welding, and robot welding processes. The analysis and modeling were carried out by using the UML(Unified Modeling Language), an object-oriented modeling method as well as IDEF(Integration DEFinition), a functional modeling tool. Initially, the characteristics of the shop resources were analyzed using the shipyard data, and the layout of the subassembly line was designed with the resources. The production process modeling of the subassembly lines was performed using the discrete event simulation method. Using the constructed resource and process model, the productivity and efficiency of the line were investigated. The number of workers and the variations In the resource performance such as that of a new welding robot were examined to simulate the changes in productivity. The bottleneck process floated according to the performance of the new resources. The proposed model was viewed three-dimensionally in a digital environment so that interferences among objects and space allocations for the resources could be easily investigated
Many of Korea major companies have appled as strategy of management innovation Six Sigma, Lean and Theory of Constraints. Six Sigma has mainly focused to reduce variation. Lean has mainly focused to reduce wastes and Theory of Constraints has mainly focused that bottleneck of constrains production and sales. This bottleneck is caused by constraint resources and it should be the main role of manager to explore constraint resource. Although their mainly focus are different, they are used to improve productivity and quality. In this paper, as strategy of management innovation, study on analysis and comparison plan of Six Sigma, Lean and Theory of Constraints. From the literature survey and application cases, it is suggested and discussed that how to plan of application as strategy of management innovation successfully. The suggested plan of application could be a good guideline that it could be a apply of companies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.