• 제목/요약/키워드: Bored tunnel

검색결과 22건 처리시간 0.023초

Preliminary study on the ground behavior at shore connection of submerged floating tunnel using numerical analysis

  • Kang, Seok-Jun;Kim, Jung-Tae;Cho, Gye-Chun
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.133-142
    • /
    • 2020
  • Submerged floating tunnel (SFT) is a type of tunnel which causes the tunnel segments to float in the water. When the SFTs are connected to the ground, the connection between the SFT and the subsea bored tunnel is fragile due to the difference in behavioral characteristics between the two types of tunnels. Therefore, special design and construction methods are needed to ensure the stability of the area around the connection. However, since previous research on the stability of the connection site has not been undertaken enough, the basic step necessitates the evaluation of ground behavior at the shore connection. In this study, the numerical analysis targeting the shore connection between the subsea bored tunnel and the SFT was simulated. The strain concentration at the shore connection was analyzed by numerical simulation and the effects of several factors were examined. The results showed the instability in the ground close to the shore connection due to the imbalance in the behavior of the two types of tunnels; the location of the strain concentration varies with different environmental and structural conditions. It is expected that the results from this study can be utilized in future studies to determine weak points in the shore connection between the submerged floating tunnel and the subsea bored tunnel, and devise methods to mitigate the risks.

수중터널 지반 접속부 안정성 확보를 위한 터널 설계에 대한 수치해석적 연구 (Numerical study on tunnel design for securing stability at connection between submerged floating tunnel and bored tunnel)

  • 강석준;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제22권1호
    • /
    • pp.77-89
    • /
    • 2020
  • 수중 부유식 터널은 터널 세그먼트가 부력에 의해 수중에 부유하도록 하는 터널의 한 유형으로, 최근 활발히 연구되고 있다. 수중터널이 지면에 연결되면 수중터널과 지반 내부의 지중터널이 연결되어야 하는데, 두 터널의 서로 다른 구속조건과 거동 특성에 의해 두 터널의 연결부위에 응력이 집중될 가능성이 매우 높다. 따라서 연결부 주변의 안정성을 보장하기 위해 특별한 설계 및 시공 방법을 적용해야 한다. 그러나 연결부 안정성에 대한 기존 연구가 충분히 수행되지 않아서 기본적인 단계의 연결부 안정성 검토에 대한 연구가 필요하다. 이 연구에서는 수중터널과 지중터널의 연결부를 수치해석을 통해 모사하여 연결부 주변 지반에서 전단 변형 집중이 발생하는 것을 확인하였고, 시공 시 처리할 수 있는 구조적 인자가 연결부 주변 지반의 안정성 확보에 어떠한 영향을 가지는지에 대해 분석하였다. 수치해석 결과는 두 종류의 터널이 가지는 변위의 불균형으로 인한 위험이 그라우팅 재료 및 조인트 자유도 구성을 통해 완화될 수 있음을 보였다. 이 연구에서 도출된 결과는 비록 수치해석을 통한 정성적인 결과이지만, 향후 연구에서 수중터널과 지중터널의 연결의 설계 시 주요하게 고려해야 하는 구조적 인자 및 위험 지역을 판단하는 것에 기여할 것이라 판단된다.

터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석 (Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria)

  • 박광준;윤경렬
    • 한국터널지하공간학회 논문집
    • /
    • 제20권6호
    • /
    • pp.1073-1090
    • /
    • 2018
  • 국내 공동구는 주로 신도시 개발사업에 포함되어 건설되었기 때문에 모두 개착 BOX 형태를 이루고 있으나 기존 시가지를 대상으로 독자적 공동구를 건설 중인 해외의 경우 터널식 공동구 형태를 주로 채택하고 있다. 공동구의 사회적 요구가 큰 중심가 도심지는 교통량이 많아 장기적으로 차로를 차단하거나 우회 차로 설치가 곤란한 것이 일반적이므로 터널식 공동구 설치가 합리적이라 하겠다. 이러한 터널식 공동구 활성화를 위해 공동구 최적 설계용량 및 수용시설(전력, 통신, 상수도 등)별 상호 영향인자(열간섭 및 전식, 유지관리 효율성 등)를 고려한 최적화된 단면설계 기술력을 확보할 필요가 있다. 터널식 공동구의 최적단면 설계기술이란 결국 공동구내 수용시설의 최적 배치기법을 도출하는 것이라 할 수 있다. 이러한 설계기법 도출을 위해 우선적으로 해외의 터널식 공동구(Shield TBM, Conventional Tunneling) 내공단면 적용 사례를 조사하여, 단면 내 수용시설의 배치현황, 부대시설 설치 등의 특징을 분석하고, 또한 국내 외의 공동구 설계기준 및 지침서에서 제시하고 있는 내공단면 설계(배치)와 관련한 기준사항들을 정리 분석할 필요가 있다.

정량적 위험도 분석을 이용한 복선철도터널에서의 적정 대피통로 간격 산정을 위한 연구 (A Study of Proper Escape way interval by QRA on Single bored double track tunnel)

  • 노병국;이호석;송명규;추석연
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.371-376
    • /
    • 2007
  • This paper describes a study to determine proper escape way interval for the design phase of single bored double track tunnel. Among many methods which determine escape way interval, we choose a QRA(Quantitative Risk Analysis) method. But a different method must be chosen differ from other country because of special design situation of Korea. So, it is necessary to develop a method which considers a special design condition of Korea. Because fire accidents of railway tunnel are a rare event, simulated situation can be produced by CFD simulation and evacuation analysis simulation. However, it is generally difficult to estimate of fatalities from these methods, so a concept of FED is introduced to estimate of fatalities. Quantification process provides effective results for practical design stage and the result were employed in design.

  • PDF

Numerical analysis on stability of express railway tunnel portal

  • Zhou, Xiaojun;Hu, Hongyun;Jiang, Bo;Zhou, Yuefeng;Zhu, Yong
    • Structural Engineering and Mechanics
    • /
    • 제57권1호
    • /
    • pp.1-20
    • /
    • 2016
  • On the basis of the geological conditions of high and steep mountainous slope on which an exit portal of an express railway tunnel with a bridge-tunnel combination is to be built, the composite structure of the exit portal with a bridge abutment of the bridge-tunnel combination is presented and the stability of the slope on which the express railway portal is to be built is analyzed using three dimensional (3D) numerical simulation in the paper. Comparison of the practicability for the reinforcement of slope with in-situ bored piles and diaphragm walls are performed so as to enhance the stability of the high and steep slope. The safety factor of the slope due to rockmass excavation both inside the exit portal and beneath the bridge abutment of the bridge-tunnel combination has been also derived using strength reduction technique. The obtained results show that post tunnel portal is a preferred structure to fit high and steep slope, and the surrounding rock around the exit portal of the tunnel on the high and steep mountainous slope remains stable when rockmass is excavated both from the inside of the exit portal and underneath the bridge abutment after the slope is reinforced with both bored piles and diaphragm walls. The stability of the high and steep slope is principally dominated by the shear stress state of the rockmass at the toe of the slope; the procedure of excavating rockmass in the foundation pit of the bridge abutment does not obviously affect the slope stability. In-situ bored piles are more effective in controlling the deformation of the abutment foundation pit in comparison with diaphragm walls and are used as a preferred retaining structure to uphold the stability of slope in respect of the lesser time, easier procedure and lower cost in the construction of the exit portal with bridge-tunnel combination on the high and steep mountainous slope. The results obtained from the numerical analysis in the paper can be used to guide the structural design and construction of express railway tunnel portal with bridge-tunnel combination on high and abrupt mountainous slope under similar situations.

국내 TBM굴진속도 산정을 위한 경험적 방법들의 적용성 분석 (Applicability Analysis of Empirical Methods for the Calculation of TBM Advance Rate)

  • 조만섭;우동찬;김경곤;이진무
    • 터널과지하공간
    • /
    • 제13권4호
    • /
    • pp.260-269
    • /
    • 2003
  • In order to introduce to engineers the suitable calculation techniques of TBM advance rate (ad.) and ultimately promote to understand the designing process, this study was carried out. We analyzed the 17 bored data of TBM which applied to the roadway and water supply tunnels in Korea. From this analysis, it was able to how that the average utilization is 30.83% md the correlation equation of Ad and TBM´s diameter (D) is Ad(m/month) = 506.05ㆍ $e^{-0.1162}$$\times$D than the correlation coefficient ($R^2$) is 0.76. In the object of the W tunnel of Seoul-Busan highspeed railway, the Ad of TBM 5.0mø was analyzed by the variety of empirical models and upper correlation equation. Average Ad of the empirical models was calculated to be larger than one of the upper equations. But considering only the results of 3.0~5.0mø TBM in the 17 bored data, the average Ad by the models belongs to the similar range of bored data. Therefore, when the reliability and representative of parameters are decreased, a reliability test should be carried out through the comparison a variety of empirical models with the upper correlation equation.

방콕의 터널공사 - 두 개의 사례연구 (Tunnelling in Bangkok - Two Case Studies)

  • 테브라스카 완차이;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제7권2호
    • /
    • pp.153-163
    • /
    • 2005
  • 본 논문에서는 타이 방콕의 지하철 터널현장과 홍수방지용 터널현장에 대한 사례연구를 수행하였다. 첫 번째 사례연구는 복식터널인 방콕 MRT 지하철 현장으로써 터널연장이 대략 20 km이고 18개의 정거장으로 구성되어져 있다. 터널은 지표면으로부터 15~20m 깊이에 위치하는 첫 번째 단단한 실트성 점토층에 위치한다. 현장계측으로부터 얻어진 굴착에 의한 지반의 변위거동이 제시되었다. 평면변형율 유한요소해석을 통하여 역해석을 수행하였으며, 이로부터 나온 결과는 현장에서 계측된 결과와 일치하였다. 유한요소해석으로부터 산정된 전단변형율은 0.1~1.0%의 범위내에 존재하였으며, 자동보링 프래셔미터 시험으로부터 나온 결과와 비슷하였다. 한편, 두 번째 사례연구는 지하 장애물 밑으로 관통하는 EPB타입의 터널공사 현장과 관련이 있다. Premprachakorn 홍수방지용 터널은 장마시기에 홍수를 Choapraya강으로 전환하기 위한 지름길의 터널이다. 터널은 대략 지하 20~24m에 위치한 매우 단단한 실트성 점토층에 EPB타입 쉴드터널공법에 의하여 건설되었다. 터널이 이미 존재하고 있는 방콕의 주된 용수터널과 다리의 기초 아래에서 시공되는 동안에 현장계측이 수행되었으며, 이 계측결과를 유한요소해석으로부터 산정된 결과와 비교하였다. 또한 손상평가를 예측하기 위한 수단으로 방지 리스크 포텐셜 방법을 제시하고 논의하였다.

  • PDF

기 개발된 굴착식 터널의 지진취약도 모델 적용성 평가 (Evaluation of pre-developed seismic fragility models of bored tunnels)

  • 양승훈;곽동엽
    • 한국터널지하공간학회 논문집
    • /
    • 제25권3호
    • /
    • pp.187-200
    • /
    • 2023
  • 본 연구에서는 주변 환경에 따른 굴착식 터널의 지진취약도 변화에 대한 분석을 진행하고 대표 지진취약도 모델을 제시하였다. 기 개발된 굴착식 터널의 지진취약도 모델들에 대한 분석을 진행한 후 각 모델들에 가중치를 부여하여 주변 환경에 맞게 새로 가중조합한 모델을 개발하였다. 주변 환경은 굴착식 터널 주변의 지반조건과 매설 깊이를 고려하였다. 지진취약도 곡선의 피해 발생 확률은 최대지반가속도(PGA)를 매개변수로 하여 결정된다. PGA가 0.3 g일 때 매설 깊이가 50 m이하의 조건에서는 경미한 손상을 초과하는 피해 확률이 20%, 매설 깊이가 50 m 이상 100 m 이하의 조건에서는 피해 확률이 10%, 매설 깊이 100 m 이상의 조건에서는 피해 확률이 3% 이하로 매설 깊이에 따라 피해 확률이 점차 낮아지는 것을 확인하였다. 또한 주변 지반이 토양으로 되어있을 때보다 암반으로 되어있을 때 동일한 지표의 PGA에 대해 같은 매설 깊이에서 피해 확률이 크게 나타나며, 매설 깊이가 깊어질수록 피해 확률이 작아진다. 이 연구는 향후 터널의 종합적 지진취약도 함수 개발에 유용하게 사용될 것으로 기대된다.

국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례 (A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea)

  • 김경훈;최준동;전덕찬;신일재;심동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

도심지 대심도 복층터널의 환기 및 방재계획 (A Case Study on M & E Design for Double-Deck Tunnel in Urban Area)

  • 변상훈;정재호;전덕찬;신일재;심동현
    • 터널과지하공간
    • /
    • 제21권4호
    • /
    • pp.281-286
    • /
    • 2011
  • 최근, 서울시는 기존 서부간선도로의 극심한 교통정체 문제 해결을 위하여 연장 10.91 km에 달하는 새로운 소형차 전용 지하도로를 계획하였으며, 국내최초로 복층터널 형식을 적용하였다. 새로 건설될 서부간선 지하도로가 밀집한 도심지의 대심도 지하공간에 계획되므로, 인명피해 최소화를 위한 환기 및 방재계획이 중요한 문제로 대두되었으며, 본 고에서는 도심지 대심도 초장대 터널내 설비 및 안전시설에 관한 주요계획을 소개하고자 한다.