• Title/Summary/Keyword: Bogie roller rig

Search Result 31, Processing Time 0.043 seconds

A Study on the Wheelset Behavior on the Roller Rig for Railway Bogie Testing (대차 주행시험대상에서의 윤축 거동에 대한 연구)

  • Hur, Hyun-Moo;Park, Joon-Hyuk;You, Won-Hee;Park, Tae-Won
    • Proceedings of the KSME Conference
    • /
    • 2007.05a
    • /
    • pp.1207-1212
    • /
    • 2007
  • The critical speed of railway bogie related to the stability of the railway rolling-stock is important. Testing of the dynamic performance of bogie is conducted using a roller rig in a laboratory in place of field testing on track. This roller rig is composed of two rollers equivalent to track and used to test the dynamic characteristics of vehicle. But, the geometrical characteristics of the wheel/roller contact on the roller rig are different from those of the wheel/rail contact because the longitudinal radius of roller is not infinite compared with rail. This difference has influence on the wheelset behavior and the critical speed of bogie. Therefore in this paper, we have studied the behavior of wheelset and bogie on the roller rig for railway bogie testing with the purpose of developing the scaled roller rig. As an analysis results, it has been shown that the critical speed of bogie on the roller rig is slightly lower than that of bogie on track.

  • PDF

The Running Test of the Developed Bogie on the Roller Rig for Korean High Speed Train (한국형 고속전철용 개발대차의 주행시험대에서 주행성능평가)

  • 정훈;김진태
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.218-221
    • /
    • 2004
  • This Research is to test the running stability of the developed bogie with 350km/h of which conventional speed is faster than Korea TGV 300Km/h. The running stability test has been executed in status of a car with the developed bogie on the roller rigger to adjust similar to the actual condition. And the test has been done in the two rail conditions, i.e. excitation and non-excitation, respectively. Running speed of bogie increased by the roller step by step. In consequence, the developed bogie in the non-excitation has run without any unstable point for 400kn0h. Vibration characteristics of carbody also was within the value specified on the UIC 518.

  • PDF

A Study on the Critical Speed of 1/5 Scaled Bogie Model (1/5 스케일 축소대차 모델 임계속도에 관한 연구)

  • Hur, Hyun-Moo;Park, Joon-Hyuk;Kim, Min-Soo;You, Won-Hee;Park, Tae-Won
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.800-805
    • /
    • 2007
  • The critical speed of railway bogie is very important in terms of the verification of the vehicle design procedure and safety. The dynamic performance of bogie is tested on the railway roller rig in a laboratory in place of field testing on track. But, the testing on the full scale roller rig caused many problems relating to test costs, test time and has the difficulty in test condition setup. To overcome these problems, scaled models were used in the filed of railway vehicle design and test. In this paper, we have studied the critical speed of scaled bogie model. We have made the 1/5 scaled bogie, the scaled roller rig and analyzed the critical speed of the scaled bogie through the numerical simulation and running test of the scaled bogie. We have confirmed that the analysis results of the critical speed correspond with the test results.

Running Stability Test of Developed Bogie for High Speed Train on the Roller Rig (주행 시험대에서의 고속전철 개발대차의 주행안정성 평가)

  • Kim, Jin-Tae;Oh, Hyeong-Sik;Jung, Hoon
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.839-844
    • /
    • 2002
  • This research aims to test the running stability of the developed bogie with maximum operating speed of 350km/h, which of Korea TGV was 300km/h. The running stability test has been executed in status of a dummy car with one developed bogie and one dummy bogie on the roller rig to embody similar operation condition. The test has been done in the two rail conditions, i.e. excitation and non-excitation, respectively. Running speed has been increased by the roller step by step. In consequence, the developed bogie was proven to be able to run upto 400 Km/h without any unstable point in the non-excitation. Vibration characteristics of carbody also was within the value specified on the UIC 515.

  • PDF

A Study on the Characteristics of the Wheel/Roller Contact Geometry (차륜/궤조륜 기하학적 접촉특성에 관한 연구)

  • Hur, Hyun-Moo
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.618-623
    • /
    • 2006
  • Understanding the contact between wheel and rail is a starting point in railway vehicle dynamic research area and especially analysis for the contact geometry between wheel and rail is important. On the one hand, the critical speed as the natural characteristics of rolling-stock is generally tested on the roller rig. The geometrical characteristics of the wheel/roller contact on the roller rig are different from these of the general wheel/rail contact because the longitudinal radius of roller is not infinite compared with rail. Thus, in this paper we developed the algorithm to analyze the wheel/roller contact geometry of our roller rig which is constructed now and analyzed the difference between whee/roller contact and wheel/rail contact. In conclusion, we found that the yaw motion of wheelset and the roller radius influence the geometrical contact parameters in wheel flange contact area.

Development of the Scale Track to Test Bogie Steering Performance (대차 조향 특성 시험을 위한 축소 트랙 개발)

  • Hur, Hyun-Moo;Park, Jun-Hyuk;You, Won-Hee;Park, Tae-Won
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.301-305
    • /
    • 2007
  • The performance of the railway bogie is classified into the stability and the steering performance. Testing for the bogie stability is conducted on the roller rig. But testing for the bogie steering performance on test facility is very difficult, so the testing for the vehicle curving performance is conducted on the real curve track. And it is desirable to test on the full scale test rig, but it caused many problems relating to test costs, test time. To overcome these problems, the small scale test rig is actively used in the field of bogie stability. Thus, in this paper, we have studied the scale track to test the bogie steering performance. For this, we designed the 1/5 scale test track equivalent to radius 200 curve and confirmed the validity of the testing for the bogie steering performance on the scale curve track through the testing using 1/5 scale bogie.

  • PDF