• Title/Summary/Keyword: Blocking Monitoring System

Search Result 27, Processing Time 0.025 seconds

A Study on the Smart Outlet and Gateway Using Power Line Communication (전력선통신(PLC) 방식을 이용한 스마트콘센트와 게이트웨이에 관한 연구)

  • Park, Sung Jin;Kim, Yu Jin;Park, In Ji;Kim, Jin Young;Lim, Chang Gyoon
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.33 no.4
    • /
    • pp.331-335
    • /
    • 2020
  • In this study, through the accumulated technologies such as real-time monitoring of power consumption using power line communication (PLC) method, power control, and automatic blocking of standby power, to commercialize them, we developed the hardware design, algorithm, protocol and module along with data transmission using PLC. We conducted the study to develop advanced products. We also proposed cloud-based smart outlet products with a novel type of outlet. These products can measure the internal power consumption through the H/W modules and the modules that control the power of household appliances connected to the smart outlets and smart plugs. Subsequently, they transmit the measurements to the energy saving system server via a communication module. This system can control the terminal device connected to the Gateway (G/W) server through a mobile phone. This will allow the customer to check the power consumption of the building at any given time, to turn the terminal on/off, and to maximize the energy efficiency during the construction of new apartments or multi-family housing in an area.

Artificial Intelligence-based Security Control Construction and Countermeasures (인공지능기반 보안관제 구축 및 대응 방안)

  • Hong, Jun-Hyeok;Lee, Byoung Yup
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.1
    • /
    • pp.531-540
    • /
    • 2021
  • As cyber attacks and crimes increase exponentially and hacking attacks become more intelligent and advanced, hacking attack methods and routes are evolving unpredictably and in real time. In order to reinforce the enemy's responsiveness, this study aims to propose a method for developing an artificial intelligence-based security control platform by building a next-generation security system using artificial intelligence to respond by self-learning, monitoring abnormal signs and blocking attacks.The artificial intelligence-based security control platform should be developed as the basis for data collection, data analysis, next-generation security system operation, and security system management. Big data base and control system, data collection step through external threat information, data analysis step of pre-processing and formalizing the collected data to perform positive/false detection and abnormal behavior analysis through deep learning-based algorithm, and analyzed data Through the operation of a security system of prevention, control, response, analysis, and organic circulation structure, the next generation security system to increase the scope and speed of handling new threats and to reinforce the identification of normal and abnormal behaviors, and management of the security threat response system, Harmful IP management, detection policy management, security business legal system management. Through this, we are trying to find a way to comprehensively analyze vast amounts of data and to respond preemptively in a short time.

A Study on Optimal Ventilation Design for Gas Boxes Installed in Semiconductor Manufacturing Equipment Handling Flammable Liquids (인화성 가스를 취급하는 반도체 제조장비에 설치된 가스박스 최적 환기 설계에 대한 연구)

  • Gyu Sun Cho;Sang Ryung Kim;Won Baek Yang
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.1
    • /
    • pp.63-69
    • /
    • 2023
  • Although Korea is the world's No. 1 semiconductor producing country, most studies are conducted with risk assessment for simple material risks due to the closedness of the site for industrial protection. In terms of industrial safety, a monitoring system such as a gas detector to determine the leakage of hazardous substances has been established, but research on effectively discharging harmful gastritis substances in case of leakage has only recently begun. Semiconductor manufacturing facilities (gas boxes) where a large amount of flammable materials are handled are currently being safety managed by using a gas detector and blocking the air inlet. It is difficult to dilute in a short time in case of leakage of flammable substances. Therefore, in this study, based on various criteria, the size of the duct according to the size of the gas box is determined and the appropriate size of the air inlet is studied to minimize the exhaust performance requirement without exposing hazardous chemicals to the outside in the event of a flammable leak. We want to do an optimal exhaust design.

ELISA Development for the residue of the organophosphorus insecticide acephate (ELISA에 의한 유기인계 살충제 Acephate 잔류물 분석법 개발)

  • Lee, Jae-Koo;Ahn, Ki-Chang;Stoutamire, Donald W.;Gee, Shirley J.;Hammock, Bruce D.
    • The Korean Journal of Pesticide Science
    • /
    • v.5 no.2
    • /
    • pp.1-12
    • /
    • 2001
  • A competitive indirect enzyme-linked immunosorbent assay (ci ELISA) for the organophosphorus insecticide acephate, O,S-dimethyl acetylphosphoramidothioate, was developed using a polyclonal antibody. Three different haptens mimicking the analyze and containing hexanoic acid moiety as a linker were synthesized, and then conjugated with the carrier proteins bovine serum albumin and keyhole limpet hemocyanin by the N-hydroxysuccinimide active ester method. Polyclonal antibodies raised against hapten-KLH conjugates in rabbits and the hapten-BSA conjugates as coating antigens were screened and selected for the assay in the homologous and/or heterologous ELISA system. The effects of various assay conditions, including blocking reagents, detergent content, organic solvents, pH, and preincubation of tile mixture of the polyclonal antibody and the analyze on the sensitivity were evaluated. The $IC_{50}$ value of acephate of 110 ng/mL was obtained in an optimized heterologous system using hapten-3-BSA as a coating antigen and a polyclonal antibody 8377, showing the detection range of 10-1000 ng/mL and the lowest detection limit of 4 ng/mL. The cross-reactivities of the structurally related insecticides, including methamidophos were less than 0.02%. These results indicate that the ELISA could be a convenient and alternative tool for monitoring acephate residues in agricultural products and environmental samples.

  • PDF

Why is ecological restoration practiced differently from the international community in Korea? (우리나라에서는 왜 생태복원이 국제사회와 다르게 진행될까?)

  • Chang Seok Lee
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.394-407
    • /
    • 2023
  • Ecological restoration is an ecological technology that diagnoses problematic ecological spaces and restores the damaged ecosystem to a healthy appearance similar to its original appearance based on reference information obtained by analyzing intact nature. To achieve successful restoration, the project must be carried out in respect of a series of procedures. However, in Korea, restoration projects are usually actively promoted regardless of diagnostic evaluation, which wastes cost and energy, and the effect is not significant. As the reference information is not utilized, ecological restoration to return the damaged nature makes features different greatly from the appearance of nature, causing another damage. As the restoration effect is not evaluated, it is impossible to determine whether it is successful or not, and as a result, even if the project continues, there is no development and no effect. However, advanced societies have not only made academic progress by respecting these procedures but also have great economic effects along with the improvement of environmental conditions as ecological restoration has become an industry. Therefore, the international society recognizes ecological restoration as an important means of solving environmental problems at the global level, including climate change, and international organizations are actively promoting projects to treat the injured planet. However, most of the restoration projects promoted in Korea were evaluated below the level as a result of the evaluation of the effect. Nevertheless, those who have led low-quality projects are blocking plans to establish ecological restoration as a new industry that can contribute significantly to improving these levels, and thus the problem is expected to worsen. To solve this problem, it is necessary to filter out defective businesses by introducing a strict and correct project evaluation system by dividing it into before and after. Furthermore, it is necessary to establish ecological restoration as an industry and leave the process in the principles of the market.

Experimental Study on the Adhesion and Performance Evaluation of Joints for Modified Polyethylene Coated Steel Pipes (개질 폴리에틸렌 코팅 강관의 부착 및 체결부 성능 평가 연구)

  • Myung Kue Lee;Sanghwan Cho;Min Ook Kim
    • Composites Research
    • /
    • v.37 no.3
    • /
    • pp.238-245
    • /
    • 2024
  • In this study, as part of the development of a monitoring system for the efficient maintenance of steel pipes, an experimental study was conducted to evaluate the performance of steel pipes treated with modified polyethylene coating. In the case of the conventional mechanical pre-coating method, there was a deterioration in polyethylene adhesion during expansion testing, which led to the application of a chemical pre-treatment process using a calcium-mixed phosphate zinc film to resolve this issue. SEM and EDX analyses showed that the densest structure was observed at a Zn/Ca ratio of 1.0, and improved heat resistance compared to the conventional method was confirmed. Additionally, to prevent coating detachment during expansion, an evaluation of adhesion and elongation was conducted on steel pipes with modified polyethylene coating, incorporating materials such as elastomers based on maleic anhydride grafting, metal oxides, blocking agents, and slip agents. Experimental results showed that the specimen (S4) containing all modified materials exhibited more than a 25% performance improvement compared to the specimen (S2) containing only metal oxides. Lastly, the development and performance evaluation of wedge-shaped socketing and pressing wheels, which are part of the pipe fixing accessories, were conducted to prevent surface coating damage on the completed pipes.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF