A study on full-face sequential blasting using electronic detonator (전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구)

  • Yoon, Ji-Sun;Kim, Su-Hyun;Bae, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.177-184
    • /
    • 2008
  • In this study, in order to reduce appeals regarding vibration and noise from blasts, the optimum delay-time of the electronic detonator, which can minimize blast vibration, is found through blast-waveform composition and blasting simulation, and we have developed the full-face Sequential Blasting Method based on the studies of damping properties of full-face section blasting. The optimum delay-time of the electronic detonator and Full-face Sequential Blasting Method using electronic detonator was applied to the Gyeongbu high-speed railway construction site to test the feasibility of this method.

  • PDF

A Study on the Prediction & Transformation of Blasting Noise for Environmental Regulation Standard (발파소음의 예측기법과 환경규제 기준으로의 변환 연구)

  • 김남수;양형식
    • Explosives and Blasting
    • /
    • v.18 no.2
    • /
    • pp.14-22
    • /
    • 2000
  • The estimation of proper prediction method and the alteration of transformation method of environmental regulation standard were carried out by measuring blasting noise in construction field. The correlation of scaled distance with sound pressure level were better than with sound level, but it was proved to be difficult to control blasting noise because the correlation factor was too 1ow. three methods to transform sound pressure levee to sound level were examined. The method is the transformation by correlation equation of sound pressure level and sound level which are measured at the same time, and simplified transformation of A-weighting network corresponding to dominant frequency, and the transformation of sound pressure level by FFT. There were many errors to transform. The best effective method is the transformation using correlation equation of sound pressure level and sound level which are measured at the same time.

  • PDF

Blast Excavation of Small Diameter Tunnel near Underground pipe lines (지하 관 시설물과 인접한 소규모 단면 터널의 발파굴착 사례)

  • Won, Yeon-Ho;Kim, Kang-Gyu
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.40-54
    • /
    • 2010
  • The messer shield method applys mainly to a tunnel with small cross-section of a weathered soil or weathered rock district and is fulfilled mostly by man-power excavation. but in case that hard rock exposes on tunnel face, incredible is an application of the rock-splitting method using a hydraulic power or a blasting method. This study represents the case of a blasting method which can control to be practiced by the minimum charges of 125 g an initial vibration occurring at the cut instead of the rock-splitting method, even though water pipe and gas pipe are closely adjacent.

On the Selected Blasting Method and Measurement of Vibration and Sound Level by Blasting in KU-SAN area. (구산동 아파트 재개발 사업의 발파공법 선정 및 주변 가옥에 미치는 발파 진동.소음 영향에 관한 연구)

  • 강대우
    • Explosives and Blasting
    • /
    • v.16 no.3
    • /
    • pp.16-24
    • /
    • 1998
  • Methods of Rock fragmentation are used rock of housing repair development at KU-SAN DONG area in seoul Youn-Pyong Ku. So, Theorical analyses of the effect of vibration and frequency on structural damage around old housed also discussed. The results can be summarized as follows: 1. A area(Rock area not more than 15m Ku-San Mention) Some Empirical equations were obtained $V=K\{{\frac{D}{W}}1/3\}^{-n}$ where the values for n and K are estimated to be -1.64 and 94 respectively, this values were obtained only theorical analyses. If we have 125g charge this area is impossible blasting operation, so this area must be worked by SRS(Super Rock Splitter) method. 2. B area(Rock area from 15m to 25m in a boundary line from Ku-San Mention) This area charge is about 125g in a delay time by some empirical equation s. So, this area can be blasting operations by small charge. 3. C area(Rock area from 25m to 35m in a boundary line from Ku-San Mention) This area charge is about 500g in delay time by some empirical equation s. So, this area can be blasting operations by middle charge. 4. D area(Rock area more then 35m in a boundary line from Ku-San Mention) This area charge is about 1000g in a delay time by some empirical equation s. So, this area can be blasting operations by middle charge.

  • PDF

A Case Study of Deck-Charge Blasting Using Electronic Blasting Systems In Urban Area (분산장약공법을 이용한 도심지 전자발파 시공사례)

  • Son, Young-Bok;Kim, Gab-Soo;Kim, Jae-Hoon
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.21-26
    • /
    • 2016
  • In case of urban blasting works at near neighbors, the size of one blasting should be minimized to reduce the vibration and noise. However, the complaints is not decreased due to increased numbers of blasting per day so that the period of blasting works become long. This case study is related to urban apartment construction site. In order to overcome the weakness of general detonators which is required many blasting times to meet the day productivity, we have been applied deck-charge blasting method using electronic detonators and then we successfully increased the day productivity with much less blasting times. Hence, we had effectively achieved the declined neighbors'complaints and shortening construction period.

Numerical Study on the Effects of Air Decking in Half Charge Blasting Using AUTODYN (AUTODYN을 이용한 하프장전 발파공법의 에어데크 효과에 대한 수치해석적 연구)

  • Baluch, Khaqan;Kim, Jung-Kyu;Kim, Seung-Jun;Jin, Guochen;Jung, Seung-Won;Yang, Hyung-Sik;Kim, Nam-Soo;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.1-8
    • /
    • 2018
  • This numerical study was intended to evaluate the applicability of the half charge blasting to mining and tunnelling. The half charge blasting is a method that two separate rounds are sequentially blasted for the rock burdens in which long blast holes have already been drilled at one operation. The aim of the method is to decrease the construction cost and period in mining and tunnelling projects as well as to increase the blasting efficiency. Several numerical analyses were conducted by using the Euler-Lagrange solver on ANSYS AUTODYN to identify the effects of the suggested method on the blasting results in underground excavations. The overall performance of the suggested method was also compared to an ordinary blasting method. The analysis model was comprised of the Eulerian parts (explosive, air, and stemming materials) and the Lagrangian parts (rock material). As a result, it was found that, owing to the air decks formed in the bottom parts of the long blast holes, the first round of the suggested method presented a higher shock pressure and particle velocities in the vicinity of the blast holes compared to the ordinary blasting method.

A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Safety Facilities (근접 보안물건의 진동제어를 위한 터널 전자발파 시공사례)

  • Seo, Yun-Sik;Woo, Sang-Don;Kwon, Yeong-Bok;Kim, Jong-Su;Choi, Hyeong-Bin;Kim, Seon-Hong;Kim, Gab-Soo;Kim, Jae-Hoon;Kim, Hee-Do;Lee, Jun-Won
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.37-51
    • /
    • 2012
  • In this case of "Seongnam~Yeoju double-lanes railroad construction", there were safety facilities which were concerned about damages from vibration and noise. In the project design stage, the rock-splitter method was designed to prevent them. The electronic blasting was considered to improve construction speed and economic value as an alternative tunnelling method, complying with the site's vibration criteria(cowhouse : 0.09cm/sec, residence : 0.2cm/sec). In the environment evaluation report of the eDev, tunnel electronic blasting systems, the blasting pollutions can be managed by the electronic blasting method. The results were successfully conducted with high speed construction without any damages to adjacent facilities.

Proposal of Vertical Direction Deck Delay Time for Efficient Formation of Free Surface of Bottom Deck (효율적 하부데크의 자유면 형성을 위한 수직방향 데크 단차 제안)

  • Seung-Won Jung;Seung-Joong Lee;Jin-Hyuk Song;Young-Ho Kim;Young-Suk Song;Nam-Sun Hwang
    • Explosives and Blasting
    • /
    • v.41 no.4
    • /
    • pp.41-50
    • /
    • 2023
  • This study, a vertical double-deck method using an electronic detonator was applied to increase excavation volume and reduce blast pollution. In the double deck method, there is a possibility that blasting efficiency may be reduced if bottom deck blasting is carried out without the free surface being completely formed after upper deck blasting. And for this reason, the blasting efficiency of the double deck method varies depending on the deck delay time. Therefore, in this study, we proposed four deck delay times applying 1 to 5 times the hole delay time. And blasting efficiency was evaluated according to fragmentation analysis. As a result of the fragmentation evaluation, the fragmentation of pattern 4 (deck delay time = hole delay time×5) was the best, but it was confirmed that fragmentation efficiency increased significantly from pattern 3 (deck delay time = hole delay time×3). Accordingly, it is analyzed that when blasting a vertical double deck, the deck delay time must be at least three times the hole delay time to obtain an efficient blasting effect.