• 제목/요약/키워드: Blasting Noise and Vibration

검색결과 130건 처리시간 0.024초

건설소음진동으로 인한 가축피해현황 및 문제요인고찰 (A Study on the Damage and Problem of Domestic Animals by Noise and Vibration at Construction Site)

  • 박찬헌
    • 기술사
    • /
    • 제33권3호
    • /
    • pp.30-34
    • /
    • 2000
  • In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration

  • PDF

폭풍압 및 소음의 실측치와 예측치의 상관관계 검토 (Study of Interrelation between the Predicted and Measured Results of Air Blast and Blast Noise)

  • 박준호;강추원
    • 화약ㆍ발파
    • /
    • 제25권2호
    • /
    • pp.35-46
    • /
    • 2007
  • 발파는 지반굴착 시 경제적으로 우수하고 과정이 간편하기 때문에 다양한 지반시설, 건축물에 널리리 적용된다. 발파에 의한 지반진동은 많은 실험과 연구로 제시되었지만 폭풍압에 의한 환경적 영향은 간과 하는 경향이 있다. 환경문제 대립의 경우에 지나치게 민감하고 논쟁의 여지가 있는 구조물에 대한 소음은 발파분야에서 무시되는 경향이 있다. 이에 비추어 이 연구는 폭풍압의 예상 진행방향을 조사하였다. 실제 폭풍압과 소음을 추정한 다음 회귀분석을 사용한 지발당 장약량에 기초를 두고 확실한 추정식을 만들었다. 추정식과 실제 결과치의 비교는 추정식의 타당성을 결정하는데 도움이 될 것이다.

GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례 (A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator)

  • 황남순;김경현;김정환;성유현;이창원
    • 화약ㆍ발파
    • /
    • 제39권3호
    • /
    • pp.24-34
    • /
    • 2021
  • 정밀한 시차를 갖고 있는 전자뇌관은 다양한 건설현장에서 폭넓게 사용되고 있다. 전기뇌관이나 비전기뇌관을 이용한 발파현장에서 소음과 진동이 허용기준치를 초과하는 경우를 비롯하여, 발파작업에 의한 파쇄도를 개선하거나, 2차 소할의 비용을 절감하기 위해 사용된다. 또한 작업효율성을 극대화하여 공사기간을 단축시키며 비용을 절감하기 위해 전자뇌관을 이용하는 경우가 늘어나고 있는 추세이다. 본 사례는 도심지 내 GTX A 프로젝트에서 대단면 정거장 공사현장에 전자뇌관을 적용한 사례이다. 당 현장은 설계에 비전기뇌관을 이용하여 시공하도록 되어 있었으나, 발파작업을 진행하던 중 보안물건에 손상이 가해졌다. 이를 해결하기 위한 대안으로 전자뇌관을 이용한 발파공법을 검토하였다. 전자뇌관을 적용하여 발파소음과 진동에 대한 환경규제기준을 충족시켰으며 인근의 보안물건에 대한 손상을 방지할 수 있었다. 또한, 안전과 효율적인 시공을 위해 정거장 대단면을 1회 동시발파를 실시하였으며, 이를 통해 계획대비 공사기간을 단축시켰다.

근접 보안물건의 진동제어를 위한 터널 전자발파 시공사례 (A Case Study of Tunnel Electronic Blasting to Control Vibration in the Proximity of the Safety Facilities)

  • 서윤식;우상돈;권영복;김종수;최형빈;김선홍;김갑수;김재훈;김희도;이준원
    • 화약ㆍ발파
    • /
    • 제30권1호
    • /
    • pp.37-51
    • /
    • 2012
  • 본 시공사례는 "성남~여주 복선전철 제${\bigcirc}$공구 노반건설공사"로서 터널의 노선을 따라 진동 및 소음으로 인한 피해영향권내에 주요 보안물건이 위치하고 있다. 설계단계에서 이러한 피해영향을 고려하여 기계식 암파쇄 굴착공법이 적용되어 있으나, 합리적인 공사기간 단축을 위한 대안 터널굴착공법이 요구되어 당 현장의 발파진동 허용기준(우사:0.09cm/sec, 주택 0.2cm/sec)을 준수하면서 시공성 및 경제성을 높일 수 있는 전자발파공법이 검토되었다. 이에, 최근 활성화 되고 있는 터널용 전자발파시스템(eDev)을 활용한 현장 시험시공을 통한 환경영향평가를 실시한 결과, 발파공해에 대한 안정적인 관리가 가능한 것으로 판단되었으며, 이를 기초로 한 시공결과 근접 보안물건에 대한 피해영향 없이 높은 굴진효율성을 보였다.

비전기 뇌관의 발파와 기본 설계 및 시공 (Blasting Utilizing Non-electric Detonator and Its Principle Planning and Operation)

  • 최영천
    • 화약ㆍ발파
    • /
    • 제22권4호
    • /
    • pp.23-29
    • /
    • 2004
  • 비전기 뇌관은 전기뇌관의 단점을 보완하기 위하여 개발한 뇌관이다. 외부전기로 인한 기폭위험으로부터 전기뇌관보다 더욱 안전한 뇌관으로 각광을 받고 있으며. 또한 정밀한 시차, 발파진동, 소음의 감소효과와 노천 및 터널 발파에서 다량발파에 이용되고 있는 비전기 뇌관의 기폭시스템 및 기본적인 사용방법과 설계 및 시공사례를 소개함으로써 국내발파 기술향상에 도움이 되고자 한다.

Plasma파암 실험토론회 (The discussion on the Plasma blasting Experimentation)

  • 박철화
    • 화약ㆍ발파
    • /
    • 제16권3호
    • /
    • pp.35-48
    • /
    • 1998
  • 지난 3월 27일 코롱건설(주) 회의실에서 그간 (주)수상중공업에서 새로 개발한 Plasma파암장비에 대한 수차에 걸친 실험결과를 가지고 개발자인 제환영 박사, 개발 DATA에 대한 분석을 맡았던 한국자원연구소 유창하 박사, 실험시 Plasma 파암의 파종별 식별 및 유사 기종과의 비교 등을 검토한 바 있는 허전박사, 그리고 Plasma 암비를 가지고 처음부터 끝까지 현장실험을 맏아 본 박철화 화학비관이기사(전문건설(주) 차장) 등 토론회에서 발표한 내용이다.

  • PDF

대구 지하철 구간내 선형 변동에 따른 소음 및 진동 저감 방안 연구 (The optimal control methods to reduce the environmental hazards surrounding the YoungNam Uni. Rotary of City Taegu constructing Subway Line No.1)

  • 지왕률;최재진;강상수;강대우
    • 터널과지하공간
    • /
    • 제7권2호
    • /
    • pp.116-129
    • /
    • 1997
  • The objective of this study is to predict the minimization effect of the noise and vibration during the construction and the train operation regarding to the design modification of the Taegu Subway Line No. 1. It was suggested optimal control blasting methods to reduce the causing vibration Nuance to the resident in City Taegu and also proposed the better governing method to decrease the environmental hazard to the near buildings and residents during the train operation. When the high-density gaseous reaction of explosion products exerts a high pressure in motion outward, a dynamic stress field will be created in the surrounding buildings. Therefore, in the region close to the charge, permanent damage begins to occur at a great critical level of partial velocity, that is difficult from different structure as working conditions. It is reliable to predict that the damages could be reduced if we know the peak velocity and the exact reasons through the conducting of detail studies of structural analysis of the related buildings with the optimal blasting designs. A blasting technique should be deemed to take advantage of the reduction of damage of the surrounding rocks and structures to improve the in-city blasting. This is a typical in-city blasting operation where success depends on closely controlling the ground vibrations in case of better designed blasting methods. There are techniques that can be applied to prevent large vibrations from damaging the important buildings through the Route Modification of the Taegu Subway Line No. 1.

  • PDF

전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구 (A study on full-face sequential blasting using electronic detonator)

  • 윤지선;김수현;배상훈
    • 한국터널지하공간학회 논문집
    • /
    • 제10권2호
    • /
    • pp.177-184
    • /
    • 2008
  • 본 연구에서는 발파 진동 및 소음에 관한 문제를 최소화하기 위해 발파진동 파형합성과 발파 시뮬레이션을 통해 진동을 최소화시킬 수 있는 전자뇌관의 최적초시를 찾고, 또한 전단면 분할 발파의 감쇄특성에 대한 연구를 토대로 하여 전단면 다단시차 분할 발파기법을 개발하였다. 경부고속철도 OO공구 수직구 시공현장에서 전자뇌관을 이용한 파형합성 최적초시적용과 전단면 다단시차 분할발파를 동시에 수행하는 발파기법을 현장에 적용함으로써 그 타당성을 검토하였다.

  • PDF

터널굴착 시 전자뇌관과 비전기뇌관 발파에 관한 비교 연구 (Study on comparison with electronic detonation blasting and non-electric detonation blasting)

  • 윤지선;임수환;이진무;배상훈
    • 한국터널지하공간학회 논문집
    • /
    • 제10권2호
    • /
    • pp.185-191
    • /
    • 2008
  • 본 연구에서는 정밀한 초시설정이 가능한 전자뇌관을 이용하여 터널에서의 다단 시차 분할발파(OBM)를 실시하며 대형 대단면 지하 공간 창출 요구에 발맞추어 기존뇌관(비전기뇌관)과의 비교를 통해 진동 소음 저감효과와 시공성, 효율성을 비교 검토하자 하였다. 본 연구를 통해 전자뇌관 적용 시 진동 소음 제어 및 비산거리, 여굴량, 파쇄입도가 비전기뇌관가 비교하여 양호한 결과를 나타냄을 확인할 수 있었다.

  • PDF

지반진동이 건물의 균열에 미치는 영향에 관한 연구 -부산 안산암지역을 대상으로- (A Study of Effects on Building for Cracks by Ground Vibration -Pusan Andesite-)

  • 안명석;박종남;이영대
    • 소음진동
    • /
    • 제9권6호
    • /
    • pp.1173-1179
    • /
    • 1999
  • A study was made on crack developments of the nearly building due to rock blasting for road construction at the 623 Common Block near the rear side of the Gamchun Habor. The gelogy of the study area is composed of andesite, which belongs to the Kyungsang System of the Cretaceous Period. For 3 months of blasting events, the vibration velocity data were measured at the site just in front of the K freezing factory. The data were divided into 4 groups according to the period of blasting(i.e, DATA 1, DATA 2, DATA 3 and DATA 4), for deriving K and n values. As a result, DATA 1 shows that K and n were 83.3756 and -0.848, respectively, and then K and n were progressively increased in absolute values for the follow-up groups and the last DATA 4 shows K and n were 2980.4898 and -1.502, respectively. Such differences in K and n values may be due to partly : 1) variations geological characteristics, from the upper rather weathered, fisssuring soft rocks at the earlier stage less weathered and fissuring hard rocks at the later stage of blasting events, and 2) the geometry between the blasting and detecting points.Among the total count of 225 blasting events, the number exceeding the safety limits of 0.5cm/sec was 20(8.9% of the total), the maximum displacement detected at the crack gage was 0.25mm, the level of which is far less to cause the occurrence and development of any cracks to the K factory. Therefore, it was confirmed that there were no damages such as structural failure or safety problem to the building.

  • PDF