• Title/Summary/Keyword: Blasting Noise Regulation

Search Result 10, Processing Time 0.024 seconds

A Comparative Study on the Regulation of Explosive Noise in Demolition Work at Home and abroad (국내외 철거작업시 발파소음 규제에 대한 비교 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.984-992
    • /
    • 2023
  • Purpose: The core problem of this study is that there are no specific noise regulation standards for domestic blasting work. Currently, the domestic blasting work noise regulation standard has not been established separately, and the noise regulation standard of 80 decibels is corrected by 10 decibels to 70 decibels, which is the daily living noise standard. In contrast, many foreign countries have separate noise regulation standards specifically tailored to blasting work. Accordingly, it is intended to present international reasonable blasting noise standards by comparing domestic and foreign blasting work noise regulation standards. Mmethod: This study can be inferred as a comparative analysis of domestic and foreign noise regulation standards. Data on the current noise regulation standards during domestic blasting and noise regulation standards during blasting operations in the United States, the United Kingdom, Australia, Japan, and China are collected and analyzed. Results: According to the study, the noise regulation value during blasting work at domestic construction sites was not separately established, so it was not properly tailored to the specific and characteristics of blasting noise. In the case of overseas, a realistic noise regulation value was established so that a safer, more efficient and eco-friendly blasting method could be applied to the noise regulation value uniformly during blasting work. Conclusion: In this study, it is hoped that noise regulations will be established during reasonable blasting work, as shown in domestic and international comparative studies, and will be widely adopted without interfering with the introduction of efficient, economical, and eco-friendly blasting methods by complying well with blasting safety standards.

A Study on the Prediction & Transformation of Blasting Noise for Environmental Regulation Standard (발파소음의 예측기법과 환경규제 기준으로의 변환 연구)

  • 김남수;양형식
    • Explosives and Blasting
    • /
    • v.18 no.2
    • /
    • pp.14-22
    • /
    • 2000
  • The estimation of proper prediction method and the alteration of transformation method of environmental regulation standard were carried out by measuring blasting noise in construction field. The correlation of scaled distance with sound pressure level were better than with sound level, but it was proved to be difficult to control blasting noise because the correlation factor was too 1ow. three methods to transform sound pressure levee to sound level were examined. The method is the transformation by correlation equation of sound pressure level and sound level which are measured at the same time, and simplified transformation of A-weighting network corresponding to dominant frequency, and the transformation of sound pressure level by FFT. There were many errors to transform. The best effective method is the transformation using correlation equation of sound pressure level and sound level which are measured at the same time.

  • PDF

Case Study of Blasting Vibration and Noise in Public Resentment Area (민원발생시 발파진동.소음의 처리사례에 관한 연구)

  • 안명석;최영천;박종남;목연수
    • Explosives and Blasting
    • /
    • v.17 no.3
    • /
    • pp.13-22
    • /
    • 1999
  • It Is indispensible to cause vibration, noise and dust to blasting and breaker operations. Since the control of these factors is supposed to be extremely difficult, the claim of compensation for material and mental damages are getting increased. Economically feasible blasting operation with controlling vibration and noise can be achieved by establishment of science-based plan, accurate operation and responsible inspection, and the application of efficient management system. It must also be remarked that the relevant applied without prejudice by the operator, and the law and regulation should be applied without prejudice by the authority concerned. In addition, the public claim against operators should be investigated in detail and the prosecution should be made under the careful onside-ration of scientific and reasonable conception. Finally, it is strongly suggested that the operations, public and authorities should make great efforts to develop higher technology in order to expand our construction market, to overseas.

  • PDF

Study on Preliminary Influence Analysis of Construction Noise and Vibration (건설 소음.진동의 사전 영향성 분석에 관한 연구)

  • Ahn, Myung-Seok;Kim, Hwa-Il;Park, Ju-Han
    • Explosives and Blasting
    • /
    • v.32 no.2
    • /
    • pp.25-30
    • /
    • 2014
  • Although the construction noise and vibration are transient and intermittent, their impact on the surrounding environment is huge. Since the construction equipment noise and vibration is usually transmitted because of the long distance, the sound insulation and the proper design of anti-vibration measures are very difficult. The regulation requires that the noise and vibration caused by the construction equipments should be measured within 30m from the source, whereas the blasting noise and vibration should be measured at least 60m and 160m away from the source, respectively. Instead of the 2D modelling mainly conducted so far, the 3D analysis of noise and vibration with the consideration of the height and size of the building, mountains and hills in the vicinity of the source is necessary.

A Study on the Safety Test Regulation for the Metallic Sound Barrier of the Absorption Type (금속재 흡음형 방음벽의 안전 시험 규정 분석 연구)

  • Huh, Young
    • Explosives and Blasting
    • /
    • v.20 no.4
    • /
    • pp.5-15
    • /
    • 2002
  • For the noise reduction measures in a construction field where noise sources such as blasting and pile driving works exist, the construction of the sound barrier near the noise source or receiver is often the most economic measure in order to exclude the propagated sound. The dimension of the barrier is decided by the noise and construction design, and the constructive quality of a soundproof panel shall be secured in accordance with KS F4770 to guarantee the safety of sound barriers. In this paper the problems included in the KS F4770-1 that is the regulation for the metallic sound barrier of the absorption type are identified and it is suggested what to be corrected or improved. Through a series of the analyses, conclusion were reached that it is required to improve test methods in KS F4770-1 as well as to break down loads for building more cost-effective sound barrier. In addition, KS F4770-1 was compared with ZTV-Lsw 88 which is the german regulation for sound barrier design. As a result, it was found that the Korean regulation is more conservative than that of Germany.

A Case Study of GTX A Tunnel Station Blasting with Electronic Detonator (GTX A 터널정거장에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Lee, Chang-Won
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.24-34
    • /
    • 2021
  • Electronic detonators are widely used in various construction sites due to accurate delay time. Including the cases with exceeded noise and vibration from site using electric/non-electric detonator, electronic detonators are used to improve blast fragmentation or to reduce the cost of secondary partial blasting. Furthermore, the number of cases using electronic detonators are increased for reduction of the cost and construction period by maximizing operations efficiency. This case study is about applying electronic detonators on large section station, tunnel construction site which is the part of urban area GTX A project. Although it was initially planned to utilize non-electric detonators, damage was inflicted on safety-thing. We have considered blasting method using electronic detonators as solution of this problem. By applying electronic detonators, we not only satisfied environmental regulations but also prevented nearby safety-thing from getting damaged. In addition, we were able to shorten the construction period than the initial plan by conducting single simultaneous blasting on large section station, in order to ensure safe and efficient construction.

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

A Case Study About Applying Electronic Detonator on Downtown Tunnel Construction Area (도심지 터널에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Heo, Eui-Haeng;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Kim, Nam-Su
    • Explosives and Blasting
    • /
    • v.40 no.1
    • /
    • pp.29-38
    • /
    • 2022
  • Electronic detonators are now widely used in various construction sites and quarry mines. Including the sites where safety-thing is located nearby, Cases of using electronic detonators are increasing to maximize operational efficiency by improving blast fragmentation or reducing the cost of secondary blasting. This case study is about applying for electronic detonators on zone 00 construction site, which is the part of urban area metropolitan express rail A line project. Although the project was initially planned to utilize non-electric detonators, Electronic detonators are considered as the solution not only for safe and fast excavation, but also to minimize civil complaint and the damage of safety-thing. By applying electronic detonators, we were able to satisfy environmental regulations standards and prevent nearby safety-thing from getting damaged.

A Study on the Regulation of Blasting Noise at Home and Abroad (국내외 발파소음 규제에 대한 연구)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.89-90
    • /
    • 2023
  • 대단위 건축물 및 구조물 철거작업시 철거사업 참여 주체인 발주자, 감리자, 시공자 및 근로자등의 안전사고 예방을 위한 사전 위험성평가 및 안전대책 수립, 수립된 안전대책 이행에 대한 역할이 매우 중요하다. 건축물 및 구조물 철거작업 공법은 인력철거공법 및 장비철거공법, 발파철거공법으로 구분되며 발파철거공법 적용시 발생되는 소음 및 진동을 계측하여 환경규제 기준내로 준수해야 한다. 본 연구는 발파공업에 의한 철거작업시 국내·외 소음 규제치 비교를 통해 국내의 발파공법에 의한 소음 규제치를 합리적으로 조정하여 건축물 및 구조물의 철거작업시 발파공업의 채택이 활성화 되기를 기대한다.

  • PDF

Consideration on the Relation between Vibration Level and Peak Particle Velocity in Regulation of Ground Vibration (지반진동 규제기준에서 진동레벨과 진동속도의 상호관계에 대한 고찰)

  • Choi, Byung-Hee;Ryu, Chang-Ha
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.1-8
    • /
    • 2012
  • The only law related to airblast and ground vibration control in Korea is the Noise and Vibration Control Act enforced by the Ministry of Environment. But this law mainly deals with the annoyance aspects of noises and vibrations in ordinary human life. Hence, the law defines the safety criteria of ground vibration as the vibration level (VL) of dB(V) unit. The ground vibrations produced from blasting, however, have the unique characteristics that can be shown in shock vibrations, and the duration is also very short compared to the vibrations from machinery, tools or facilities. Hence, vibration regulations for blasting operations usually define the safety criterion as the peak particle velocity (PPV) considering the effect of ground vibrations to structural damage. Notwithstanding, there are several attempts that predict VL from PPV or estimate VL based on the scaled distances (SD; in unit of $m/kg^{1/2}$ or $m/kg^{1/3}$) without considering their frequency spectra. It appears that these attempts are conducted mainly for the purpose of satisfying the law in blasting contracts. But, in principle there could no correlation between peaks of velocity and acceleration over entire frequency spectrum. Therefore, such correlations or estimations should be conducted only for the waves with the same or very similar frequency spectra.