• Title/Summary/Keyword: Bill of Material

Search Result 79, Processing Time 0.04 seconds

Application of Digital Mock-Up Technology for Detail Design and Construction of Bridge (교량 상세 설계 및 시공을 위한 DMU 기술 적응 방안 연구)

  • Lee, Yoon-Bum;Kim, Min-Seok;Lee, Kwang-Myong;Shin, Hyun-Yang;Park, Kyoung-Lae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.277-282
    • /
    • 2007
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Most construction companies are trying to utilize some new information technologies for enhancing the structure quality, shortening construction time, and reducing the construction cost. Digital Mock-Up (DMU) technology utilizes 3D CAD/CAM system that shows the shape of a structure on the computer screen. By modeling and assembling the structure in 3D dimensional environments, some errors in design can be found before or during construction. In this paper, DMU technology was applied to the detail design and construction of In-Cheon Bridge and its effectiveness was evaluated. All components of a PSC box girder segment were modeled and assembled by using of 3D CAD tools and then, some interferences between components and errors were found and revised appropriately before construction. Consequently, DMU technology would improve the quality of the structure and reduce time and cost for construction.

  • PDF

Integrated production planning in supply chain management environment considering manufacturing partners (SCM 환경에서의 협력 생산을 고려한 통합 생산 계획에 관한 연구)

  • Jeong Ho Sang;Jeong Bong Ju
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.363-370
    • /
    • 2002
  • This paper presents a production planning algorithm for minimizing the costs of production and subcontracting in SCM (supply chain management) environment. In our SCM environment, the several local plants that aye dispersed geographically produce parts and products. In this environment, we have to decide the production volumes of both parts and products considering the BOM (bill-of-material) structure to meet the fixed order quantity or forecasted demand quantity. Each plant produces the specified parts of product with finite production capacity. There exist subcontracting decisions relevant to the production capacity of each plant except the core process plant, and when we use the subcontractor's capacities we should be charged for the fixed subcontracting fees. The objective of this study is to solve the production planning problem, which minimizes the total costs of production, inventory, setup, and subcontracting under constraints of production and subcontracting capacity. For this problem, an integrated production planning model based on the multi-level capacitated lot sizing problem was formulated, and efficient decomposition algorithm was proposed. The experimental investigation shows that the proposed heuristic generates quite good solutions at very low computational costs.

  • PDF

A Study on Reform Scheme of Software Industrial Promotion Law (소프트웨어산업진흥법의 개선방향에 관한 연구)

  • Choi, Chang-Ryeol
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.61-81
    • /
    • 2006
  • It is necessary to systematically explore the reform plans of the Software Industrial Promotion Law to systematically a representative high-added value future knowledge-based industry, software industry. The current Software Industrial Promotion Law provides only one provision on software business contract procedures, and the Civil Code, the National Contract law or Subcontract Fairness Law regulate other things, so the features of software industry are not properly reflected. To the contrary, the Information Communication Construction Law or the Construction Basic Law effectively prevent disputes by providing material and detailed provisions. Therefore the current software industry needs to be shifted from promotion to fundamental one. That is, as the software industry takes up a large portion at present, so the law should have basic procedural provisions. Also the National Contract Law governs only the contract procedures of public sector, so there should be business performance procedural provisions to regulate the software business formalities of civil sector. And the National Contract Law controls the sale, construction and service of articles at separate contract procedures, but software business contains construction and service characters simultaneously, so there should be business performance procedures fit for software business. Thus this study presented the legislative need and bill on the performance procedures of software business.

The Development of the Drawing Information Management System Based on Group Technology (Group Technology를 이용한 설계정보관리 시스템의 개발)

  • H.S. Moon;Kim, S.H.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.1
    • /
    • pp.58-68
    • /
    • 1997
  • In order to provide economic high-quality products to customers in a timely manner, companies have tried much effort to decrease the time period of engineering design and information management. As a part of this effort, we have developed the Drawing Information Management System(DIMS) based ofn GT(Group Technology) that could decrease design processing time by speedy and rational management of design processes. The characteristics of DIMS are as follows: First, the concept of Concurrent Engineering was applied to DIMS. Through LAN, reviewers are able to attach comments to dlectronic documents by anno- tation functions called Mark-up. The reviewer annotations are collected and combind with the original document to revise the documents. Second, we have developed a Classification and Coding(C&C) system suitable for electronic component parts bassed on GT(Group Technology). The C&C system makes both parts and drawing with similar characteriscs into families and helps users search existing documents or create new drawings promptly. Finally, DIMS provides the Engineering BOM(Bill of Material) using the concept of Family BOM based on model options.

  • PDF

A Study on the Improvement of Efficiency for Quality Assurance Based on Quality-Bill of Material (Q-BOM(Quality-BOM) 기반의 품질보증 효율화 방안 연구)

  • Lee, Chang Hee;Yang, Kyung Woo;Park, Doo Il;Kim, S.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.3
    • /
    • pp.457-463
    • /
    • 2013
  • Purpose: For effective quality assurance activities, BOM-based quality assurance method is presented. This study introduces various BOM conversions such as Q-BOM, T-BOM, and S-BOM based on M-BOM structure. Methods: Product quality control via Q-BOM manages inspection/audit information, overall supply-chain of product, part requirements, and inventory status. T-BOM manages part traceability, and S-BOM enables statistical control over key process and parts at various hierarchy levels. Results: Quality plan template was developed based on the study results of BOM system including Q-BOM, T-BOM, and S-BOM. Conclusion: Through BOM(Q-BOM, T-BOM, and S-BOM) study and development of quality plan template, more systematic and comprehensive quality management plan is achieved.

An Integrated Multi-BOM System for Product Data Management (제품정보관리를 위한 통합적 멀티BOM시스템)

  • Jung, So-Young;Kim, Bo-Hyun;Oh, Joseph;Baek, Jae-Yong;Choi, Hon-Zong;Lee, Sung-Jin
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.3
    • /
    • pp.216-223
    • /
    • 2012
  • Bill of material (BOM), which structurally represents the relation among parts constructing a product, is usually created when enterprises start to develop a new product. And it is shown as various types of BOM according to business needs and usage such as eBOM (engineering BOM), gBOM (green BOM), mBOM (manufacturing BOM), pBOM (process BOM), etc. eBOM, generally called BOM and created in the design stage of the new product, includes the drawing information of parts in the view of product function. eBOM is extended to gBOM adding the material information of parts to cope with international regulations for environment. eBOM is transformed to mBOM, which includes manufacturing sequence of parts and adds some parts required to fabricate parts and to assemble the product. mBOM is also extended to pBOM adding the process information of each part and additional assembly processes. This study introduces the concept of multi-BOM covering eBOM, gBOM, mBOM and pBOM, and proposes an advanced way to manage product data using multi-BOM system. The multi-BOM system proposed is to manage their relations using transformation function of BOM and master information of all BOMs.

Development of Storage Techniques for PDTnet XML Schema Data (PDTnet XML Schema 데이터를 위한 저장 기법 개발)

  • Lee, Kyoung-Hye;Yong, Hwan-Seung;Lee, Wol-Young
    • Journal of Korea Multimedia Society
    • /
    • v.9 no.8
    • /
    • pp.939-949
    • /
    • 2006
  • With the development of industry, product data management system is becoming more and more important. An expanded view of product definition function that include a bill of material and routing database, current and historical engineering data and specifications and engineering changes order history. PDM (Product Data Management) systems hold and manage such material as product specifications, plans, geometric models, CAD drawings and images. Furthermore, PDM enables companies producing complex products to spread product data in to the entire launch process. Especially, PDTnet XML Schema is an international standard for exchanging of PDM data. But PDTnet XML Schema differs from existing XML Schema in the way that its property of IDREF/IDREFS is irregular. Therefore it is important factor that. what do we use storage devices and storage techniques. We developed storage techniques and application supporting various query types and preserving PDTnet XML Schema using a relational database that guaranteeing the performance nowadays. In this paper, we will show that our storage techniques minimize repeated data and optimize query processing by using application comparison with storage techniques of existing XML Schema data.

  • PDF

A Study on the Improvement Case of Cosmetic Packaging Process Using ARENA Simulation (아레나 시뮬레이션을 활용한 화장품 포장공정의 개선사례 연구)

  • Lee, Nam-Su;Lee, Jae-Yong;Jo, Eun-Hyeon;Lee, Dong-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.72-78
    • /
    • 2020
  • Demand for cosmetics with functionality and eco-friendliness has increased dramatically due to recent aging, well-being trends, and increased interest in beauty. Cosmetics production in 2014 was 8,970.4 billion won, an increase of about 50% compared to 6,014.6 billion won in 2010. In the midst of this, similar companies in intense competition are pursuing differentiated strategies and innovation activities to solve quality, price and delivery problems. In particular, cosmetics packaging work is getting more difficult due to the increasing bill of materials (BOM) and difficult assembly methods. Therefore, in this study, the following problems were identified and suggestions for the improvement of the packaging Many research laboratories such as biotechnology, chemistry, and pharmaceuticals, which are undergoing various studies, are equipped with ready-made laboratory safety equipments such as bio-safety workbenches, aseptic bases, and exhaust workbenches. However, most researchers are disadvantaged in using existing safety equipment. This is because existing safety equipment can not take into account all of the unique characteristics of the research. For this reason, researchers are demanding the development of customized safety equipment that is well suited to their research needs. process of Company C, which is facing difficult situation to respond to the customer 's delivery due to the 52 - hour work week. First, we used the stopwatch to find the difficulty process in the packaging process and show ways to improve it. Second, to improve the efficiency of line balancing in the packaging process, we integrate processes, improve work methods, and perform simple automation. As a result, the prepare loss for replacement was reduced by 1 minute from 5 minutes, resulting in a 23% increase in productivity from 112 ea./hour to 137ea./ hour per person. At this time, the LOB of the packaging process was improved from 70% to 82% by operating one more production line through one person per line, total 9 people saving.

Conceptual Design of Product & Asset Lifecycle Management System for Marine Structures During Middle of Life (선박해양구조물의 유지보수 단계 수명주기관리 정보 시스템의 개념 설계와 구현)

  • Kim, Seung-Hyun;Lee, Jang-Hyun;Son, Gum-Jun;Han, Eun-Jung
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.2
    • /
    • pp.58-67
    • /
    • 2012
  • Recently, both the integration of product data during design and production and the effective management of information during full lifecycles have attracted attention from shipyards and ship owners as a result of recycling regulations and a desire for efficient operations. Generally, PLM (Product Lifecycle Management) supports a collaborative environment during the BOL (Beginning of Life) stage, while an ALM (Asset Lifecycle Management) system provides all of the information required to maintain, overhaul, and discard/recycle all or part of a vessel during the MOL (Middle of Life) and EOL (End of Life) stages. The main goal of this paper is to suggest the fundamental configuration of a PALM (Product Asset Lifecylce Management) system and a method that can be used to utilize a marine vessel's lifecycle information during the MOL, emphasizing the maintenance information during the middle of life. The authors also suggest a PALM system configuration in which lifecycle information can be collected by a PEID (Product Embedded Information Device) integrating a microcomputer, sensors, and wireless network communication. Through a prototype PALM system, the suggested features and PALM system configuration are implemented.

Framework of Ship PLM System Based Upon Four-Tier Model (4-계층 모델 기반의 선박 수명주기관리 시스템 프레임워크)

  • Kim, Seung-Hyun;Lee, Jang-Hyun;Lee, Kyung-Ho;Suh, Heung-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.5
    • /
    • pp.362-374
    • /
    • 2010
  • Product Lifecycle Management (PLM) is an integrated business approach to manage the creation and distribution of product information throughout the product development process. From the product perspective, PLM encompasses a holistic approach to product development and product information management. It supports the integrated product information in conjunction with the efficient product structures and BOM (Bill Of Material), user interfaces, proper functions, design processes and enterprise integration. Therefore, PLM should not only satisfy required functions as an enterprise software but also offer a systematic method for the efficient application from the initial stage of its development. Recently, many shipyards have been considering the PLM as a strategic solution to get the efficient management of product information such as 3-D models, BOM, drawings, documents, and the other product data. Though many studies on PLM are performed, most of them are performed in a function-based approach adequate for mass productive assembly industries. It could not help having limitations on applying the proper PLM system to the shipbuilding business since the requirements of shipbuilding PLM are too diverse and huge to design the architecture. This study presents the PLM framework which effectively reflects the diverse requirements of shipbuilding PLM. In order to get the macroscopic architecture of shipbuilding PLM, authors suggest the four-tier architecture model which considers the various requirements collected from shipyards. Entities of ship design data are modeled BOM in terms of product structure and hierarchical class diagram. Applicable functions of shipbuilding PLM are also investigated by analysis of issues of ship design. Finally, by reflecting the design process of shipbuilding, To-Be ship design procedure cooperated with the suggested PLM framework has been summarized.