• Title/Summary/Keyword: Bilge pump

Search Result 3, Processing Time 0.014 seconds

A Study on Bilge Pumping Performance of 24,000TEU class Container Ship (24,000TEU급 컨테이너선박의 빌지 펌핑 성능에 대한 고찰)

  • Seo, Jang-Won;Yun, Jeong-In;Lee, Kyoung-Woo;Lee, Won-Ju;Park, Hoyong;Choe, Su-Jeong;Choi, Jae-Hyuk
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.6
    • /
    • pp.1100-1109
    • /
    • 2022
  • Herein, a case study was conducted on the bilge pumping performance of a 24,000TEU class container ship with an overall length of 400m. Although the bilge system of the 24,000TEU class container ship was designed in accordance with the rule requirements of the Classification Society, the bilge system did not satisfy the 2 m/s requirements of SOLAS Reg.II-1/35-1 under the rated flow rate and maximum flow rate conditions of the bilge pump installed in the ship. In particular, assumptions were made that No.1 ~ No.4 cargo holds were flooded and filled entirely by sea water and the evaluation of bilge pumping performance had been performed for No.1 ~ No.4 cargo holds. According to the evaulation results of the, the mean water velocity at the main bilge pipe for No.2, No.3, and No.4 cargo holds did not meet the 2 m/s criterion. To resolve this problem, in this study, the branch bilge pipe in each cargo hold was changed from 150A to 200A and the mean water velocity at the main bilge pipe for No.2, No.3, and No.4 was calculated as 2.479m/s, 2.476m/s, and 2.459m/s, respectively.

A study on the Computer-Aided automatic Design of marine water ejector (선박용 수이젝터의 자동설계를 위한 전산프로그램의 개발)

  • 김경근;김용모;김주년;남청도
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.74-84
    • /
    • 1986
  • Ejectors, having no moving, lubricating and leaking parats, are widely used as marine pumps because of its high working confidence. For instance, uses in ships are stripping in crude oil tank, bilge discharge in engine room, ballast water pumping on are carrier, and brine discharge from fresh water generator. And it is also used as cooling water recirculating pump in boiling water type nuclear reactor and deep-well pump. It is not easy to determine the optimal dimension for designing each ejector agreed with its suggested performance condition, because complicated calculations must be repeated to obtain the maximum efficiency affected by flowrate ratio, head ratio, area ratio and so on. Therefore, it is considered that the CAD (Computer-Aided Design) for ejector is a powerful method for design according to the individual design condition. In this paper, a computer program for water ejector design is developed based on the previous paper on theoretical analysis and experimental results for water ejector. And from the theoretical approach, an equation for the working limit and an equation for determing the shape of throat are obtained. The validity of the present computer program is sufficiently confirmed through the comparison of the computed results with the main dimension of the previous manufactured water ejector. This program will be easily developed as the CAD for various kinds of ejectors, including steam ejector.

  • PDF

A Study on the Release of Hatch Cover in Sand Carriers (모래운반선의 창구덮개 면제를 위한 시설기준에 관한 연구)

  • Jung, Chang-Hyun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.18 no.5
    • /
    • pp.439-445
    • /
    • 2012
  • Only the sand carriers fitted with hopper doors can remove their hatch covers in current regulations. However, there is no sand carriers fitted with hopper doors in korea. Through the analysis of accidents, inspection of equipment installed on ships, and evaluation of stability and seakeeping performance concerning the sand carriers, it is expected that the current exemption requirement is modified for hatch covers for sand carriers. As the result, this paper proposed the removal of hatch covers and be fitted by tarpaulin instead to protect water ingress into the holds. This can be done by making the holds smaller designed to be filled full until the top of the hold without exceeding loadline. Also, the bilge pumps should have the sufficient capacity of pumping water out in the early stage of sand-water mixture to wetted condition in approximately 1 hour and be operationally ready in every voyage conditions.