• Title/Summary/Keyword: Bidding Work Process

Search Result 23, Processing Time 0.023 seconds

Development of an Analytic Hierarchy Process Model for the Bidder Selection of a Large Construction Project (대형공사의 최적입찰자 선정을 위한 계층분석과정(AHP) 모형의 개발)

  • 정병호;조권익
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.75-85
    • /
    • 1999
  • In recent, an unfaithful construction bring about many social problems. The bidding process considering bidding price firstly is one of the reasons raising an unfaithfull construction work. Thus, we should consider many other criteria including bidding price in the bidder selection process. This paper suggests an analytic hierarchy process(AHP) model for selecting the best bidder of a large construction project. A questionnaire was used to obtain domain experts' opinion about criteria to be considered in the bidding process. A hierarchical structure of the AHP model is formed using criteria obtained in the survey. The model consists of bidding price, construction capability, financial status, faith, and their 17 sub-attributes. The relative importance of bidders are judged by pairwise comparison or absolute measurement. An illustrative example is given to show the process selecting the best bidder using the suggested AHP model.

  • PDF

Design and Implementation of Business Flow Management System for XML/EDI based Electronic Bidding System (XML/EDI기반 전자입찰 시스템을 위한 비즈니스 흐름 관리기의 설계 및 구현)

  • 윤선희
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.10
    • /
    • pp.751-760
    • /
    • 2003
  • One of the business in the future will be executed by Business to Business(B to B) model of E-Commerce. The concept of the B to B model composes the work process, people, and supporting environment. The work processes are related to the information process, technologies, and standards. Information process elements contains digital data exchange, data sharing, and collaboration. This paper designed and implemented the XML-based Business Flow Management System(BFMS) for B to B model of E-commerce in the Internet. BFMS in this paper automatically performs the information process for B to B model such as electronic bidding system including purchase order management, bidding management, delivery management to build E-Commerce in the Internet. XML can be used as document standard between business for skating and exchange of data and also provide platform independent environment.

  • PDF

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

Decision Making Model for a Public Construction Project Delivery Method Selection based on Analytic Hierarchy Process (AHP를 이용한 공공공사 입찰 방식 의사결정지원 모델)

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.559-566
    • /
    • 2017
  • The bidding method of public works is decided based on the experience of the officials in charge and the convenience of the work, but the validity of decision making process for the bidding method has not been verified. Another challenge in the bidding method selection is its objective validation is not easy because the decision making is based on experience, when a new type of project is ordered or a new bidding method is applied In this study, therefore, a decision making model to facilitate the selection of a public construction project delivery method was developed and examined with its applicability. This model was developed using the Analytic Hierarchy Process and was verified through 32 persons who were actually in charge of the works. As a result of applying this model, 5 of the 32 persons showed consistency in using the model. and they expressed positive opinions about the model. The model can provide a guide while recognizing the fact that they cannot depend entirely on the model. Therefore, the model proposed in this study is expected to reduce the work-related burden of the persons who are involved in the related work and help the objective performance of their tasks when a new bidding method or project appears in the future.

Development of Operating Rules for Automated Guided Vehicle Systems in Heterarchical Manufacturing System (자치제어구조 생산시스템에서 무인운반차량 시스템의 운영정책 개발)

  • Hwang, Hark;Kim, Sang-Hwi
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.2
    • /
    • pp.343-357
    • /
    • 1997
  • This paper proposes a new AGV dispatching algorithm which is suitable for heterarchical manufacturing control structure. It is developed on the basis of bidding concept utilizing the information of work-in-process in incoming and outgoing buffers of workstation, and travel time of AGV. Since the bidding functions are functions of two parameters, sensitivity test is performed to find their appropriate values. The performance of the algorithm is compared with those of well-known existing rules in terms of system throughput through simulation on a hypothetical job shop type manufacturing system.

  • PDF

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

A Priority Analysis on Influential Factors for Software Bid Evaluation in Public Sectors based on Analytic Hierarchy Process(AHP) (AHP 기법을 활용한 소프트웨어 제안평가요인의 상대적 중요도에 관한 연구 : 발주자와 수주자 비교를 중심으로)

  • Kim, Hong Jin;Jo, Dong Hyuk;Ahn, Tae Ho
    • Journal of Information Technology Services
    • /
    • v.16 no.1
    • /
    • pp.41-53
    • /
    • 2017
  • Recently, due to the economic recession and increase of ITO (IT Outsourcing), bidding in software industry has been recognized as more competitive and the importance of software bid evaluation for corporate selection is being increased. This study aims to analyze and prioritize influential factors in the software bid evaluation criteria which is adopted as the main evaluation model of national software businesses by Ministry of Science. The priority was developed by AHP (Analytic Hierarchy Process) through pair-wise comparison. For the analysis, this study developed analysis model for AHP and conducted survey of experts who have work experience for more than 10 years in the IT industry. As the result of analysis, weighted factors in the evaluation criteria were deduced and differences of priority factors between purchaser and bidder were investigated. The analysis showed differences of view point in the bidding process. With these results, this study suggests how to write a proposal strategically and effectively in perspective of the purchaser. It is expected that priority factors will be adopted in strategic proposals in both bidder and purchaser. For purchaser, the priority will be adopted to select reliable bidder. So, we expect that the priority factors will be used to get more values for both bidder and purchaser in their business atmosphere.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF

Identifying Factors Causing Bid-dropping in Domestic Public Work Projects and Ways of Ending Its Decline (국내 공공공사 낙찰률 하락의 원인 분석 및 개선 방향)

  • Lee, Bok-Nam;Lee, Young-Hwan;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.102-109
    • /
    • 2005
  • The contract price of successful bidders in domestic public work projects has dropped significantly under lowest bidding process. Furthermore, compared to the U.S. and Japan, the bids are substantially lower. The increasing trend for domestic construction companies to bid projects without considering markup or expected profit, with the purpose of gaining experience for future similar work, has contributed to the overall dumping in bid prices. The government has implemented controls in hopes of reducing the price dropping trend but these have yet to work in the market. This study determines the level of significance of the contract price of the successful bidder in domestic public works projects and identifies factors that cause bid-dropping by comparing to those of the US and Japan. By mirroring advance countries' rules and regulations to prevent an abnormally low bidder, recommendation are provided to keep unrealistically low bidders from winning the work.

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.